Table Of ContentVolume IV
Appendix U - Appendix Z
Oahu Community Correctional Center
October 27, 2017
THIS PAGE INTENTIONALLY LEFT BLANK
Volume IV Appendices
Appendix U:
Preliminary Engineering Report
Appendix V:
Electrical and Telecommunications Utility Systems
Appendix W:
Airport Surface Evaluation
Appendix X:
Community Partnering: A Path Forward
Appendix Y:
Public Engagement and Public Outreach Summary
Appendix Z:
EISPN Scoping Meeting Summary
THIS PAGE INTENTIONALLY LEFT BLANK
Appendix U:
Preliminary
Engineering Report
Oahu Community Correctional Center
October 27, 2017
Prepared for:
State of Hawaii
Department of Accounting and General Services
Department of Public Safety
Prepared by:
Oahu Community Correctional Center October 2017
TABLE OF CONTENTS
Page
1 Introduction ........................................................................................................................................ 1-1
1.1 Background ............................................................................................................................ 1-1
1.2 Purpose .................................................................................................................................. 1-9
2 Oahu Community Correctional Center ............................................................................................... 2-1
2.1 Roadway, Parking, and Access ............................................................................................. 2-1
2.1.1 Existing Conditions ................................................................................................... 2-1
2.2 Site Grading and Flood Hazard .............................................................................................. 2-3
2.2.1 Existing Conditions ................................................................................................... 2-3
2.2.2 Proposed Improvements .......................................................................................... 2-3
2.3 Storm Drainage System ......................................................................................................... 2-5
2.3.1 Existing Conditions ................................................................................................... 2-5
2.3.2 Project Requirements ............................................................................................... 2-5
2.3.3 Proposed Improvements .......................................................................................... 2-6
2.4 Water Supply System ............................................................................................................. 2-6
2.4.1 Existing Conditions ................................................................................................... 2-6
2.4.2 Connection to the Board of Water Supply System ................................................... 2-6
2.5 Wastewater Collection System .............................................................................................. 2-7
2.5.1 Existing Conditions ................................................................................................... 2-7
2.5.2 Connection to the City Sewer System...................................................................... 2-7
2.5.3 Proposed Improvements .......................................................................................... 2-8
2.6 Natural Gas ............................................................................................................................ 2-8
2.6.1 Existing Conditions ................................................................................................... 2-8
2.6.2 Proposed Improvements .......................................................................................... 2-8
3 Animal Quarantine Station ................................................................................................................. 3-1
3.1 Roadway, Parking, and Access ............................................................................................. 3-1
3.1.1 Existing Conditions ................................................................................................... 3-1
3.1.2 Proposed Improvements .......................................................................................... 3-1
3.2 Site Grading and Flood Hazard .............................................................................................. 3-3
3.2.1 Existing Conditions ................................................................................................... 3-3
3.2.2 Proposed Improvements .......................................................................................... 3-3
3.3 Storm Drainage System ......................................................................................................... 3-5
3.3.1 Existing Conditions ................................................................................................... 3-5
3.3.2 Project Requirements ............................................................................................... 3-5
3.3.3 Proposed Improvements .......................................................................................... 3-6
3.4 Water Supply System ............................................................................................................. 3-6
3.4.1 Existing Conditions ................................................................................................... 3-6
3.4.2 Connection to the Board of Water Supply System ................................................... 3-7
3.4.3 Proposed Improvements .......................................................................................... 3-7
3.5 Wastewater Collection System .............................................................................................. 3-7
3.5.1 Existing Conditions ................................................................................................... 3-7
3.5.2 Connection to the City Sewer System...................................................................... 3-8
3.5.3 Proposed Improvements .......................................................................................... 3-8
3.6 Natural Gas ............................................................................................................................ 3-9
3.6.1 Existing Conditions ................................................................................................... 3-9
3.6.2 Proposed Improvements .......................................................................................... 3-9
4 Halawa Correctional Facility .............................................................................................................. 4-1
4.1 Roadway, Parking, and Access ............................................................................................. 4-1
Proposed OCCC – Preliminary Engineering Report i
Oahu Community Correctional Center October 2017
TABLE OF CONTENTS (continued)
Page
4.1.1 Existing Conditions ................................................................................................... 4-1
4.1.2 Proposed Improvements .......................................................................................... 4-1
4.2 Site Grading and Flood Hazard .............................................................................................. 4-3
4.2.1 Existing Conditions ................................................................................................... 4-3
4.2.2 Proposed Improvements .......................................................................................... 4-3
4.3 Storm Drainage System ......................................................................................................... 4-5
4.3.1 Existing Conditions ................................................................................................... 4-5
4.3.2 Project Requirements ............................................................................................... 4-5
4.3.3 Proposed Improvements .......................................................................................... 4-6
4.4 Water Supply System ............................................................................................................. 4-6
4.4.1 Existing Conditions ................................................................................................... 4-6
4.4.2 Connection to the Board of Water Supply System ................................................... 4-6
4.4.3 Proposed Improvements .......................................................................................... 4-7
4.5 Wastewater Collection System .............................................................................................. 4-7
4.5.1 Existing Conditions ................................................................................................... 4-7
4.5.2 Connection to the City Sewer System...................................................................... 4-7
4.5.3 Proposed Improvements .......................................................................................... 4-7
4.6 Natural Gas ............................................................................................................................ 4-8
4.6.1 Existing Conditions ................................................................................................... 4-8
4.6.2 Proposed Improvements .......................................................................................... 4-8
5 Mililani Technology Park – Lot 17 ...................................................................................................... 5-1
5.1 Roadway, Parking, and Access ............................................................................................. 5-1
5.1.1 Existing Conditions ................................................................................................... 5-1
5.1.2 Proposed Improvements .......................................................................................... 5-1
5.2 Site Grading and Flood Hazard .............................................................................................. 5-3
5.2.1 Existing Conditions ................................................................................................... 5-3
5.2.2 Proposed Improvements .......................................................................................... 5-3
5.3 Storm Drainage System ......................................................................................................... 5-5
5.3.1 Existing Conditions ................................................................................................... 5-5
5.3.2 Project Requirements ............................................................................................... 5-5
5.3.3 Proposed Improvements .......................................................................................... 5-5
5.4 Water Supply System ............................................................................................................. 5-6
5.4.1 Existing Conditions ................................................................................................... 5-6
5.4.2 Connection to the Board of Water Supply System ................................................... 5-6
5.4.3 Proposed Improvements .......................................................................................... 5-6
5.5 Wastewater Collection System .............................................................................................. 5-7
5.5.1 Existing Conditions ................................................................................................... 5-7
5.5.2 Connection to the City Sewer System...................................................................... 5-7
5.5.3 Proposed Improvements .......................................................................................... 5-7
5.6 Natural Gas ............................................................................................................................ 5-8
5.6.1 Existing Conditions ................................................................................................... 5-8
5.6.2 Proposed Improvements .......................................................................................... 5-8
6 Women’s Community Correctional Center ........................................................................................ 6-1
6.1 Roadway, Parking, and Access ............................................................................................. 6-1
6.1.1 Existing Conditions ................................................................................................... 6-1
6.1.2 Proposed Improvements .......................................................................................... 6-1
6.2 Site Grading and Flood Hazard .............................................................................................. 6-3
6.2.1 Existing Conditions ................................................................................................... 6-3
6.2.2 Proposed Improvements .......................................................................................... 6-3
Proposed OCCC – Preliminary Engineering Report ii
Oahu Community Correctional Center October 2017
TABLE OF CONTENTS (continued)
Page
6.3 Storm Drainage System ......................................................................................................... 6-5
6.3.1 Existing Conditions ................................................................................................... 6-5
6.3.2 Project Requirements ............................................................................................... 6-5
6.3.3 Proposed Improvements .......................................................................................... 6-6
6.4 Water Supply System ............................................................................................................. 6-6
6.4.1 Existing Conditions ................................................................................................... 6-6
6.4.2 Connection to the Board of Water Supply System ................................................... 6-7
6.4.3 Proposed Improvements .......................................................................................... 6-7
6.5 Wastewater Collection System .............................................................................................. 6-7
6.5.1 Existing Conditions ................................................................................................... 6-7
6.5.2 Connection to the City Sewer System...................................................................... 6-8
6.5.3 Proposed Improvements .......................................................................................... 6-8
6.6 Natural Gas ............................................................................................................................ 6-8
6.6.1 Existing Conditions ................................................................................................... 6-8
6.6.2 Proposed Improvements .......................................................................................... 6-8
7 References ......................................................................................................................................... 7-1
LIST of FIGURES
Page
Figure 1-1 Vicinity Map ...................................................................................................................... 1-3
Figure 1-2 OCCC – TMK Map ........................................................................................................... 1-4
Figure 1-3 Animal Quarantine Station – TMK Map ........................................................................... 1-5
Figure 1-4 Halawa Correctional Facility – TMK Map ......................................................................... 1-6
Figure 1-5 Mililani Technology Park Lot 17 – TMK Map ................................................................... 1-7
Figure 1-6 Women’s Community Correctional Center – TMK Map ................................................... 1-8
Figure 2-1 OCCC – Existing Roadway System ................................................................................. 2-2
Figure 2-2 OCCC – Flood Insurance Rate Map ................................................................................ 2-4
Figure 2-3 OCCC – Proposed Improvements ................................................................................... 2-9
Figure 3-1 Animal Quarantine Station – Existing Roadway System ................................................. 3-2
Figure 3-2 Animal Quarantine Station – Flood Insurance Rate Map ................................................ 3-4
Figure 3-3 Animal Quarantine Station – Proposed Improvements .................................................. 3-10
Figure 4-1 Halawa Correctional Facility – Existing Roadway System............................................... 4-2
Figure 4-2 Halawa Correctional Facility – Flood Insurance Rate Map .............................................. 4-4
Figure 4-3 Halawa Correctional Facility – Proposed Improvements ................................................. 4-9
Figure 5-1 Mililani Technology Park Lot 17 – Existing Roadway System ......................................... 5-2
Figure 5-2 Mililani Technology Park Lot 17 – Flood Insurance Rate Map ........................................ 5-4
Figure 5-3 Mililani Technology Park Lot 17 – Proposed Improvements ........................................... 5-9
Figure 6-1 Women’s Community Correctional Center – Existing Roadway System ......................... 6-2
Figure 6-2 Women’s Community Correctional Center – Flood Insurance Rate Map ........................ 6-4
Figure 6-3 Women’s Community Correctional Center – Proposed Improvements ........................... 6-9
Proposed OCCC – Preliminary Engineering Report iii
Oahu Community Correctional Center October 2017
APPENDICES
Appendix A Oahu Community Correctional Center
Appendix B Animal Quarantine Station
Appendix C Halawa Correctional Facility
Appendix D Mililani Technology Park Lot 17
Appendix E Women’s Community Correctional Center
Proposed OCCC – Preliminary Engineering Report iv
Oahu Community Correctional Center October 2017
EXECUTIVE SUMMARY
The State of Hawaii Department of Public Safety (PSD) is responsible to provide a safe, secure, and
humane environment for the care and custody of adult male and female offenders originating from the
Island of Oahu. The current Oahu Community Correctional Center (OCCC) is out of date, inefficient and
no longer meets the needs of PSD. On behalf of PSD, the State of Hawaii Department of Accounting and
General Services (DAGS) is proposing to develop a replacement facility for the existing OCCC facility in
Kalihi, Oahu, Hawaii. Four (4) alternative sites on Oahu are under consideration for replacement of the
existing OCCC, identified as follows.
- Existing OCCC site in Kalihi;
- Animal Quarantine Station in Halawa;
- Halawa Correctional Facility in Halawa; and
- Mililani Technology Park Lot 17 in Mililani
Each alternative would include relocating female inmates currently housed at OCCC to the existing
Women‘s Community Correctional Center (WCCC) in Kailua.
This preliminary engineering assessment was conducted to provide a detailed evaluation of four (4)
alternative sites related to the civil infrastructure and utility systems for the replacement of the OCCC.
The objective of the report is to review the existing site infrastructure improvements, determine the project
requirements related to the roadway and parking facilities, site grading, storm drainage system, sanitary
sewer system and water system, and, based on the project requirements, determine required
improvements, and identify possible opportunities and constraints for the OCCC replacement facility.
An Environmental Impact Statement is being prepared to assess each alternative site and determine
which site is most feasible for development of the replacement for the existing OCCC facility.
Proposed OCCC – Preliminary Engineering Report v
Description:This alternative would use an area east of the H-3 Freeway for the OCCC replacement facility to house .. An existing 24-inch drain line off of Kamehameha Highway crosses the site at the north corner and runs beneath the Prison Annex the new buildings and parking lot completing a loop. Backflow