ebook img

Reliability and Maintenance at Arnold Engineering Development Center PDF

64 Pages·2011·3.25 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Reliability and Maintenance at Arnold Engineering Development Center

AEDC Journey to Excellence: Creating a Sustainable Culture of Reliability and Safety David Hurst & Ramesh Gulati ) Aerospace Testing Alliance (ATA) Arnold Air Force Base, TN Approved for public release; distribution is unlimited. Presented @ NASA F2F Annual Meeting Nashville, TN 10-13 May, 2011 Air Force Materiel Command Arnold Engineering Development Center Arnold Air Force Base, TN 37389 1  Introduction ◦ Safety “Beyond Zero” moment ◦ AEDC overview  Our Journey … to Excellence ◦ Where we were and where we are headed? ◦ Creating a safe operating environment ◦ World class maintenance practices – award winning Program  Creating a reliability and safe culture ◦ Designing for reliability and safety ◦ Workforce development ◦ Management support / involvement  Challenges in creating a sustainable culture Approved for public release; distribution is unlimited. 2  Number 1 Priority! ◦ Each and EVERY person goes home at the end of their shift in BETTER shape than when they arrived!  Physically  Mentally  What’s Acceptable? – What’s Not? Approved for public release; distribution is unlimited. 3  Possibility Thinking: ◦ Stretch to what could be. ◦ What would you attempt if you knew you could not fail? ◦ How are Beyond Zero and Asset Management coupled? Approved for public release; distribution is unlimited. 4  Focus on specific target issues ◦ Training/education ◦ Daily tool box topics ◦ Daily stretching program  Leadership commitment ◦ Safety Walks – Hazard Abatement Verification  Eliminate Hazards on the spot ◦ Visit every accident site ◦ Escort accident victims to dispensary  Safety minutes – All meetings  Safety Learning Observations  Eliminate unsafe conditions – “Just Fix It” Approved for public release; distribution is unlimited. 5 Culture beyond WHAT IT IS avoiding what is Personal stand notwanted; that no one be instead learning injured on or how to generate off the job what iswanted. Integrated Integrated Processes Processes Belief in the Organizational possibility of being commitment Beyond ZeroSM to be free of Mindset incident and Intolerant of injury any incident or injury Approved for public release; distribution is unlimited. 6 We People place It is not People feel choose It is people about responsible the safe about and more for their path creating their processes safety as well because culture families and everyone of their where as our : paperwork else’s personal greatest values value Approved for public release; distribution is unlimited. 7 Safety becomes a passion. •We look out for ourselves and all around us 24/7. •Caring Centered. •Connect to individuals & loved ones. •Accidents become learning & teaching opportunities. Statistics & ratios measure progress only. Approved for public release; distribution is unlimited. 8 40 37 E1 35 Recordable 30 27 LWD Cases s 25 e i r u 20 j n I . o15 N 10 10 5 5 3 0 0 Pd 1 Pd 2 Pd 3 Pd 4 Pd 5 Pd 6 Pd 7 Pd 8 Pd 9 Pd 10Pd 11 • Delivering improvement in all three measures of performance • Keeping our co-workers and families safer here and at home Approved for public release; distribution is unlimited. 9 Best Ever: Achieved 436,000 work hours per E1 (10% better than P10) Best Ever: Delivered over 3.8M hours since our last lost workday event Approved for public release; distribution is unlimited. 10

Description:
4 boilers. Max Capacity 315,000 pounds per hour. ◦ 450+ million pounds of steam produced on Unbalanced Test Operations And Maintenance.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.