ebook img

NASA Technical Reports Server (NTRS) 20170000775: Exploration Medical Capability Element Overview PDF

0.86 MB·English
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview NASA Technical Reports Server (NTRS) 20170000775: Exploration Medical Capability Element Overview

National Aeronautics and Space Administration Exploration Medical Capability Element Overview IWS 2017 January 2017 Outline • ExMC Mission and Goals • Applied Research Program Operational Target • Element Conceptual Drivers • ExMC Risk ownership and POCs • Current and Future Gaps • Element Progress in 2016 2 Our Mission To minimize mission medical risk through medical system design and integration into the overall mission and vehicle design. 3 Organizational Environment Funds(cid:9)and HEOMD OCHMO(cid:9)HMTA provides(cid:9)Program(cid:9) requirements Funds Owns Owns Owns Mission(cid:9)concepts(cid:9) Technology(cid:9) Research(cid:9) 3001(cid:9) HSRB(cid:9)Risks &(cid:9)feasibility roadmaps products Standards Developed(cid:9)by Managed(cid:9)by Managed(cid:9)by Managed(cid:9)by Updates(cid:9) facilitated(cid:9)(cid:9)by HSRB Study(cid:9)Team(s)(cid:9) Determines(cid:9)Risk(cid:9) (proxies(cid:9)for(cid:9) CH&P(cid:9)SMT research(cid:9)is(cid:9)required Medical(cid:9)Risk(cid:9)+ Explora on(cid:9)Program) Medical(cid:9)IPT(cid:9)+ Risk(cid:9)Custodian IPT(cid:9)Lead Coordinate(cid:9)design(cid:9) HRP info(cid:9)and(cid:9)requests ExMC(cid:9)Element Funds,(cid:9)provides(cid:9)Element(cid:9) (2)(cid:9)Provides(cid:9)risk(cid:9) requirements,(cid:9)shares(cid:9) (1)(cid:9)Provides(cid:9) es mates,(cid:9)med(cid:9) other(cid:9)Element(cid:9)plans(cid:9) research(cid:9)plans,(cid:9) system(cid:9)capabili es,(cid:9) (3)(cid:9)Provides(cid:9)med(cid:9)system(cid:9)design(cid:9) progress Risk(cid:9)mi ga on(cid:9) and(cid:9)dev(cid:9)info(cid:9)to(cid:9)inform(cid:9)tech(cid:9) progress,(cid:9)integra on(cid:9) roadmaps(cid:9)and(cid:9)study(cid:9)teams approach(cid:9)to(cid:9)Risk* Provides(cid:9)coordinated(cid:9)study(cid:9) ExMC Shares(cid:9)other(cid:9)Risk(cid:9) team(cid:9)requests;(cid:9)Shares(cid:9)other(cid:9)IPT,(cid:9) mi ga on(cid:9)informa on SMT(cid:9)and(cid:9)other(cid:9)system(cid:9)devinfo (4)(cid:9)Provides(cid:9)updated(cid:9) standard(cid:9)content Provides(cid:9) med(cid:9)system(cid:9) Provides(cid:9)clinical(cid:9)and(cid:9) technical(cid:9) Provides(cid:9)flight(cid:9) opera onal(cid:9)inputs context opera onal(cid:9)inputs Medical(cid:9) Astronaut Opera ons(cid:9) *(cid:9)Risk(cid:9)Custodian(cid:9)uses(cid:9)more(cid:9)than(cid:9)only(cid:9) Office Group ExMC(cid:9)inputs(cid:9)to(cid:9)inform(cid:9)HSRB(cid:9)status 4 ExMC Management Information Flow Management Activity  Content Reporting/ Implementation EP&C  Resource Element Management  Administer Schedule Element Scientist Exploration Clinical  Schedule  Performance  SharePoint  Technical Content Working Group (ECWG)  Integration Technical Content  CCB  Integration  Resource  Requirements  Interface with PSMO Interpretations  Research Plan Systems Engineering  Interfaces Systems Engineering  Requirements Allocation  Requirements  System Definition  System Modeling UnAssigned Gaps  Interface Management  Med03: Personalized Medicine  Med 01 (ConOps)  Med04: Rehab  Med08: Risk  Med06 Ethics  IMM (GRC)  Med09 Inflight Risk  MONSTR (JSC)  Med10: Decision Support  Med11: Resource Utilization JSC Lead ARC Lead GRC Lead LaRC Lead JSC Projects GRC Projects  Gap 14: Med Hab  SE&I Support ARC Projects  Gap12: Condition Mitigation  Unmapped Risk Support  Gap07 Information Processing:  Gap 13: Medical Resources (Bone, Dust)  MDA  FUS  Med02 (Pharm)  X-Ray  Research pathway  ELA  Dose Tracker  Suction  Med05 (Crew Training)  Oxygen  MCT 5 Mars Design Context • Current architectures for exploration call for long duration missions of 1-3 years • Mars will not have a capability for medical evacuation. • Mars missions cannot expect resupply although some prepositioning of resources may be available. • There will be periods of limited communications and extended transit times.  Comm rates: kilobits per second, like dial-up internet.  The one-way flight time for radio signals can be more than 20 minutes.  Comm will not be continuous. • Mars Mission will require multiple launches  Launch one or more durable unpiloted ships with non- perishable supplies and equipment to Mars 78 or 52 or 26 months before the crew departs.  Construct the crew transit ship in high Earth or Moon orbit with several SLS payloads launched  Crew launch. With low margins available on these missions, we can expect increasing scrutiny and competition for resources across mission systems. Element Closure? • The goal of the element is to supply sufficient information and validation of a vehicle medical capability that the future program of record will be able to build and integrate the medical system with minimal design issues confident in the risk reduction to the crew 7 Timeline and Target – Why now? • Must have a target to design towards • Must have a way to make hard decisions • This is not “sometime” in the distant future Today 8 years 2025 2030s 2017 End of ISS 8 ExMC Risk Ownership • Medical Risk – Erik Antonsen • Pharmaceutical Stability Risk – Vernie Daniels • Renal Stone Risk – Bob Pietrzyk • Acute Bone Fracture Risk – Jean Sibonga • Celestial Dust Exposure Risk – Torin McCoy Medical Care Capabilities • Medical care includes: Prevention/Screening  Diagnostic capability  How are these implemented in Treatment capability  a mission we’ve never done before? Rehabilitation capability  Prognosis 

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.