ebook img

NASA Technical Reports Server (NTRS) 20150002993: JSC Design and Procedural Standards JSC Design and Procedural Standards PDF

0.39 MB·English
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview NASA Technical Reports Server (NTRS) 20150002993: JSC Design and Procedural Standards JSC Design and Procedural Standards

JSC(cid:882)08080(cid:882)2(cid:3)JSC(cid:3)Design(cid:3)and(cid:3)Procedural(cid:3)Standards(cid:3)Abstract(cid:3) (cid:3) This(cid:3)document(cid:3)contains(cid:3)design(cid:3)and(cid:3)procedural(cid:3)requirements(cid:3)for(cid:3)human(cid:3)spaceflight(cid:3)equipment(cid:3)based(cid:3)on(cid:3) lessons(cid:3)learned(cid:3)and(cid:3)best(cid:3)practices.(cid:3) The(cid:3)requirements(cid:3)captured(cid:3)in(cid:3)this(cid:3)document(cid:3)are(cid:3)appropriate(cid:3)for(cid:3)the(cid:3)acquisition,(cid:3)design,(cid:3)development,(cid:3) test,(cid:3)evaluation,(cid:3)operations,(cid:3)and(cid:3)sustaining(cid:3)engineering(cid:3)of(cid:3)any(cid:3)human(cid:3)spaceflight(cid:3)program,(cid:3)project,(cid:3) spacecraft,(cid:3)system,(cid:3)or(cid:3)end(cid:3)item.(cid:3) In(cid:3)order(cid:3)to(cid:3)make(cid:3)the(cid:3)document(cid:3)available(cid:3)to(cid:3)NASA(cid:3)&(cid:3)NASA(cid:3)contractor(cid:3)employees(cid:3)outside(cid:3)the(cid:3) JSC(cid:3)Community,(cid:3)the(cid:3)document(cid:3)needs(cid:3)to(cid:3)be(cid:3)posted(cid:3)to(cid:3)the(cid:3)NASA(cid:3)(cid:3)Standards(cid:3)and(cid:3)Technical(cid:3) Assistance(cid:3)Resource(cid:3)Tool(cid:3)(START)(cid:3)website:(cid:3)https://standards.nasa.gov/documents/jsc(cid:3) (cid:3) (cid:3) JSC-08080-2 JSC Design and Procedural Standards Engineering Directorate January 2015 National Aeronautics and Space Administration Lyndon B. Johnson Space Center Houston, Texas JSC-08080-2 1. PREFACE This document contains design and procedural requirements for human spaceflight equipment based on lessons learned and best practices. The design and procedural requirements are located in Section 5 of this manual and are identified according to the applicable discipline or category, with letter codes as follows: G General E Electrical F Fluids M/P Materials and Processes M/S Mechanical and Structural P Pyrotechnics This document is controlled by the JSC Engineering Directorate (EA) Configuration Control Board (CCB). 2. CHANGE LOG Revision Date Originator Description of Changes Basic January EA5 / Renumbered document from JSC-STD- 2015 Russell Yates / 8080 to JSC-08080-2. 281-483-0996 Reformatted requirements. Deleted key word index, signature block, and historical changes. Added applicable documents, requirement guidelines, and reference documents. Rewrote Preface and Introduction. Improved consistency of numbering and capitalization. Corrected superscripts / subscripts. Corrected document titles. 2 JSC-08080-2 Added “None.” to Remarks if none. Deleted superseding comments. G-5: Replaced JSC 49774 reference with NASA-STD-6016. G-11: Replaced NASA FAR Supplement text with reference. G-14: Updated FED-STD-595A reference to current revision. G-22: Reverted to 2005 revision of requirement, changed “until installed in an assembly” to “throughout their lifecycle,” added JSC references to Remarks section. G-29: Updated NPR 8705.2 reference to current revision. G-37: Deleted reference to NASA-STD-3000. G-39: Updated lightning protection standard references to current revisions. E-1: Updated NASA-STD-3000 reference to NASA-STD-3001. E-7: Updated MIL-PRF-39003/10B reference to MIL-PRF-39003/10D w/Amendment 1. E-13: Updated symbols from uA to (cid:80)A. E-14: Deleted JSC 49774 reference. E-20: Removed IEEE C62.38 from list of acceptable test methods. E-24: Replaced MIL-C-17 reference with MIL-DTL-17, and MIL-W-22759 with SAE AS22759. F-5: Deleted redundant paragraph 3 JSC-08080-2 F-27: Updated requirement for de-ionized water lesson learned. MP-9: Updated JPG 1700.1 reference to JPR 1700.1. MP-11: Updated pressure vessel standard references to current revisions. MP-13: Updated pressure vessel standard references to current revisions, and updated JSC-STD-1710 reference to JPR 1710.13. MS-4: Deleted reference to NASA-STD-3000. MS-5: Replaced JSC 49774 references with NASA-STD-5020, NASA-STD-6016, and MSFC-STD-557; added requirement that sole locking feature not rely on preload; changed NASA-STD-3000 reference to NASA-STD-3001. MS-7: Added reference to NASA-STD-5018. Approval Reference ECD 0209 4 JSC-08080-2 3. TABLE OF CONTENTS 1. PREFACE ................................................................................................................................................... 2 2. CHANGE LOG ............................................................................................................................................ 2 3. TABLE OF CONTENTS ................................................................................................................................ 5 4. INTRODUCTION ........................................................................................................................................ 9 4.1 PURPOSE ........................................................................................................................................................ 9 4.2 BACKGROUND ................................................................................................................................................. 9 4.3 APPLICABILITY.................................................................................................................................................. 9 4.4 AUTHORITY ..................................................................................................................................................... 9 4.5 APPLICABLE DOCUMENTS .................................................................................................................................. 9 4.6 CANCELATION ................................................................................................................................................ 11 5. DESIGN AND PROCEDURAL STANDARDS ................................................................................................ 11 5.1 GENERAL ...................................................................................................................................................... 11 G-1 Equipment Accessibility for Maintenance ............................................................................................ 11 G-2 Separation of Redundant Systems ....................................................................................................... 12 G-3 Electrical and Fluid Systems Checkout Provisions ................................................................................ 12 G-4 Protection from Debris – Electrical & Mechanical Systems ................................................................. 13 G-5 Prevention of Debris – Electrical & Mechanical Systems ..................................................................... 14 G-6 [Canceled] ............................................................................................................................................ 14 G-7 [Canceled] ............................................................................................................................................ 14 G-8 Design for Redundancy Verification ..................................................................................................... 14 G-9 Shatterable Material – Exclusion ......................................................................................................... 14 G-10 Time/Cycle Critical Part Control ........................................................................................................... 15 G-11 Procurement Document Identification for Human Spaceflight Items .................................................. 16 G-12 Application of Previous Qualification Test Data .................................................................................. 16 G-13 [Canceled] ............................................................................................................................................ 17 G-14 Classification of Flight and Non-Flight Equipment ............................................................................... 17 G-15 Resolution of Flight Equipment Failures/Anomalies Prior to Launch ................................................... 18 G-16 Operational Limits on Temperature-Controlled Equipment ................................................................. 19 G-17 Separate Stock for Spaceflight Parts and Materials ............................................................................ 20 G-18 Safety Precautions – Test and Operating Procedures .......................................................................... 21 G-19 Special Processes – Identification of Drawings .................................................................................... 21 G-20 Spacecraft Equipment – Protection from Liquids During Ground Operations ..................................... 22 G-21 Spacecraft Equipment – Moisture Protection ...................................................................................... 22 G-22 Product Identification .......................................................................................................................... 23 G-23 Pressure Garment Wiring – Ignition of Materials by Electrical Current ............................................... 23 G-24 Protecting Flight Equipment from Support Equipment ........................................................................ 24 G-25 Thermal Design and Analysis ............................................................................................................... 25 G-26 Internally-Generated Radiation ........................................................................................................... 25 G-27 Fire Control........................................................................................................................................... 25 G-28 Sealing – Solid Propellant Rocket Motors ............................................................................................ 26 G-29 Reentry Propulsion Subsystem In-Flight Test ....................................................................................... 27 G-30 [Canceled] ............................................................................................................................................ 27 G-31 Detachable Crew – Operated Actuating Tools ..................................................................................... 27 G-32 [Canceled] ............................................................................................................................................ 28 G-33 [Canceled] ............................................................................................................................................ 28 G-34 [Canceled] ............................................................................................................................................ 28 5 JSC-08080-2 G-35 [Canceled] ............................................................................................................................................ 28 G-36 [Canceled] ............................................................................................................................................ 28 G-37 Verification of External Visibility .......................................................................................................... 28 G-38 Pressurization or Repressurization – Preventing Ingress of Undesirable Elements.............................. 29 G-39 Lightning Protection Design ................................................................................................................. 29 G-40 Radioactive Luminescent Devices ........................................................................................................ 30 G-41 [Canceled] ............................................................................................................................................ 31 G-42 [Canceled] ............................................................................................................................................ 31 G-43 [Canceled] ............................................................................................................................................ 31 G-44 Attitude Control Authority ................................................................................................................... 31 G-45 Solid Propellant Rocket Motors............................................................................................................ 31 G-46 Separation Sensing System – Structural Deformation ......................................................................... 31 G-47 Gyroscopes – Verification of Operational Status ................................................................................. 32 G-48 Onboard Experiments – Required Preinstallation Checklist ................................................................. 33 G-49 [Canceled] ............................................................................................................................................ 34 G-50 Direct Procurement of Parts................................................................................................................. 34 G-51 Flight Hardware – Restriction on Use for Training ............................................................................... 34 G-52 Reuse of Flight Equipment ................................................................................................................... 35 G-53 Reverification ....................................................................................................................................... 35 G-54 Automatic Shutdown of Launch Vehicle Engine(s) .............................................................................. 36 5.2 ELECTRICAL ................................................................................................................................................... 38 E-1 Mating Provisions for Electrical Connectors ........................................................................................ 38 E-2 Protection of Severed Electrical Circuits ............................................................................................... 38 E-3 Electrical and Electronic Devices – Protection from Reverse Polarity and/or Other Improper Electrical Inputs ............................................................................................................................ 39 E-4 Electrical Connectors – Moisture Protection ........................................................................................ 39 E-5 Electrical Connectors – Pin Assignment ............................................................................................... 40 E-6 Corona Suppression ............................................................................................................................. 40 E-7 Problem Electrical Components – Restrictions on Use ......................................................................... 41 E-8 Electrical / Electronic Supplies and Loads – Verification Tests ............................................................. 44 E-9 Electrical Circuits – De-energizing Requirement .................................................................................. 45 E-10 Cleaning of Electrical and Electronic Equipment ................................................................................. 45 E-11 Protective Covers or Caps for Electrical Receptacles and Plug ............................................................. 45 E-12 Electrical Connectors – Disconnection for Trouble-Shooting and Bench Testing ................................. 46 E-13 Bioinstrumentation Systems – Crew Electrical Shock Protection Standard ......................................... 47 E-14 Electrical Wire Harnesses – Acceptance Testing .................................................................................. 48 E-15 Electrical Power Distribution – Overload Protection & Fault Propagation .......................................... 49 E-16 Testing Protective Devices for Electrical and Electronic Circuits .......................................................... 50 E-17 Electrical and Electronic Piece Parts – Hermetic Construction ............................................................. 50 E-18 [Reclassified as G-54] ........................................................................................................................... 51 E-19 Equipment Design – Power Transients ................................................................................................. 51 E-20 Electrostatic Discharge Protection of Electronic Equipment ................................................................ 51 E-21 [Canceled] ............................................................................................................................................ 52 E-22 Ionizing Radiation Effects on Electronics ............................................................................................. 52 E-23 [Canceled] ............................................................................................................................................ 55 E-24 Electrical Wire and Cable Acceptance Tests ........................................................................................ 55 E-25 Protecting Electrical Wires, Cables, Bundles, and Harnesses ............................................................... 57 5.3 FLUIDS ......................................................................................................................................................... 58 F-1 Restriction Requirements – Pressurized Components .......................................................................... 58 F-2 Water Separators in a Zero-Gravity Environment ................................................................................ 59 F-3 Service Points – Positive Protection from Interchangeability of Fluid Service Lines ............................. 60 F-4 Ground Service Points – Fluid Systems ................................................................................................. 60 F-5 Fluid Lines – Separation Provision ........................................................................................................ 61 6 JSC-08080-2 F-6 Temperature and Pressure Monitoring Requirements for Potentially Hazardous Reactive Fluids ............................................................................................................................................ 61 F-7 Capping of Fluid Servicing and Test Ports Not Required to Function in Flight ..................................... 62 F-8 Fluid Systems Components Whose Function Is Dependent on Direction of Flow – Protection Against Incorrect Installation ....................................................................................................... 62 F-9 Spacecraft Venting-Induced Perturbing Forces .................................................................................... 62 F-10 Nozzles and Vents – Protection Prior to Launch .................................................................................. 63 F-11 Fluid Supplies – Verification Test Provisions ........................................................................................ 63 F-12 Protection of Pressurized Systems from Damage Due to Pressurant Depletion – Support Equipment .................................................................................................................................... 64 F-13 Habitable Module Pressure – Venting Restriction ............................................................................... 64 F-14 [Canceled] ............................................................................................................................................ 65 F-15 Separation of Hypergolic Reactants..................................................................................................... 65 F-16 Fluid Line Routing and Installation ...................................................................................................... 65 F-17 Cleanliness of Flowing Fluid and Associated Systems .......................................................................... 66 F-18 Pressure Relief Valves – Standardization of Functional Testing ........................................................... 66 F-19 Cleanliness Protection for Fluid Systems .............................................................................................. 67 F-20 Fluid Systems – Cleanliness .................................................................................................................. 68 F-21 Purge Gases – Dew Point Requirement ................................................................................................ 68 F-22 Pressure Garments – Protection Against Failure Propagation ............................................................. 69 F-23 [Reclassified as G-53] ........................................................................................................................... 69 F-24 Fluid Systems – Design for Flushing and Draining ............................................................................... 69 F-25 Toxicity – Fluids Contained in Systems in the Crew Compartment ...................................................... 70 F-26 Atmospheric Pressure and Composition Control .................................................................................. 70 F-27 Verification of Liquid or Gas Properties ............................................................................................... 71 F-28 [Canceled] ............................................................................................................................................ 72 F-29 Filter Protection of Sensitive Fluid Components................................................................................... 72 F-30 Pressure Relief for Pressure Vessels/Systems ....................................................................................... 72 5.4 MATERIALS AND PROCESSES ............................................................................................................................. 73 MP-1 Materials and Processes Control .......................................................................................................... 73 MP-2 [Canceled] ............................................................................................................................................ 74 MP-3 [Canceled] ............................................................................................................................................ 74 MP-4 [Canceled] ............................................................................................................................................ 74 MP-5 [Canceled] ............................................................................................................................................ 74 MP-6 [Canceled] ............................................................................................................................................ 74 MP-7 [Canceled] ............................................................................................................................................ 74 MP-8 [Canceled] ............................................................................................................................................ 74 MP-9 Mercury Limitations in Breathable Atmospheres ................................................................................ 74 MP-10 [Canceled] ............................................................................................................................................ 75 MP-11 Pressure Vessel Documentation ........................................................................................................... 75 MP-12 [Canceled] ............................................................................................................................................ 76 MP-13 Pressure Vessel / Special Pressurized Equipment Design and Certification ......................................... 76 MP-14 [Canceled] ............................................................................................................................................ 77 MP-15 [Canceled] ............................................................................................................................................ 77 MP-16 [Canceled] ............................................................................................................................................ 77 MP-17 [Canceled] ............................................................................................................................................ 77 MP-18 [Canceled] ............................................................................................................................................ 77 MP-19 [Canceled] ............................................................................................................................................ 77 MP-20 [Canceled] ............................................................................................................................................ 77 MP-21 [Canceled] ............................................................................................................................................ 77 MP-22 [Canceled] ............................................................................................................................................ 77 MP-23 [Canceled] ............................................................................................................................................ 77 MP-24 [Canceled] ............................................................................................................................................ 77 7 JSC-08080-2 MP-25 [Canceled] ............................................................................................................................................ 77 MP-26 [Canceled] ............................................................................................................................................ 77 5.5 MECHANICAL AND STRUCTURAL ........................................................................................................................ 77 MS-1 Equipment Containers – Design for Rapid Spacecraft Decompression ................................................ 77 MS-2 Alignment, Adjustment, and Rigging of Mechanical Systems ............................................................. 77 MS-3 [Reclassified as E-25] ............................................................................................................................ 78 MS-4 Crew Hatches ....................................................................................................................................... 78 MS-5 Threaded Fasteners .............................................................................................................................. 80 MS-6 [Canceled] ............................................................................................................................................ 82 MS-7 Windows and Glass Structure .............................................................................................................. 82 MS-8 Penetration of Inhabited Spacecraft Compartments ........................................................................... 83 MS-9 Positive Indication of Status for Mechanisms ...................................................................................... 83 MS-10 [Canceled] ............................................................................................................................................ 83 MS-11 Meteoroid and Orbital Debris Protection Levels for Structures ........................................................... 83 MS-12 Spacecraft Recovery Hoist Loops ......................................................................................................... 85 MS-13 [Canceled] ............................................................................................................................................ 86 MS-14 Structural Analysis ............................................................................................................................... 86 MS-15 Fluid Systems – Method of Joining Metallics ....................................................................................... 86 MS-16 Pressure Vessels – Negative Pressure Damage .................................................................................... 87 5.6 PYROTECHNICS .............................................................................................................................................. 88 P-1 Pyrotechnic Devices – Arming and Disarming...................................................................................... 88 P-2 Pyrotechnic Devices Preflight Verification Tests .................................................................................. 88 P-3 [Canceled] ............................................................................................................................................ 89 P-4 [Canceled] ............................................................................................................................................ 89 P-5 Pyrotechnic Devices – Identification Requirements ............................................................................. 89 P-6 Protection of Electrical Circuitry for the NASA Standard Initiator ........................................................ 90 P-7 [Canceled] ............................................................................................................................................ 90 APPENDIX A REQUIREMENT GUIDELINES ................................................................................................... 91 APPENDIX B REFERENCE DOCUMENTS ....................................................................................................... 92 8 JSC-08080-2 4. INTRODUCTION 4.1 PURPOSE This document contains design and procedural requirements for human spaceflight equipment based on lessons learned and best practices. 4.2 BACKGROUND JSC originally published its design and procedural requirements as bulletins circa 1964. In 1971, these bulletins were combined into a single document, JSCM 8080. Since then, JSC has, as needed, issued minor updates to the document, with major revisions occurring in 1991 and 2005. Through the years, the document has undergone several formatting and document number changes (e.g., JSCM 8080, JPR 8080.5, JSC-STD- 8080). 4.3 APPLICABILITY These requirements are appropriate for the acquisition, design, development, test, evaluation, operations, and sustaining engineering of any human spaceflight program, project, spacecraft, system, or end item. The requirements may be imposed via directive, specification, or agreement. The requirements may be imposed individually (by referring to individual requirement numbers) or wholly (by referring to the document number). If the requirements are imposed wholly, it is appropriate to assess the applicability of individual requirements (e.g., via an applicability matrix). 4.4 AUTHORITY JPD 8080.2, JSC Design and Procedural Standards for Human Space Flight Equipment. 4.5 APPLICABLE DOCUMENTS The latest version of these documents apply unless otherwise specified. The documents only apply when the referencing requirement applies (see Section 4.3), and only to the extent specified in the referencing requirement. The referencing requirements for each applicable document are listed in parenthesis following the document name. Documents are grouped as follows and listed alphabetically by document number within each group: law, NASA directives, NASA standards, non- NASA government standards, and other standards. JPR 1710.13, Design, Inspection, and Certification of Ground-Based Pressure Vessels and Pressurized Systems (MP-13) 9

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.