Strathy North Wind Farm Further Information Prepared for: SSE Renewables Prepared by: ENVIRON Edinburgh, UK Date: October 2010 Project or Issue Number: UK1216079 Contract/Proposal No: UK1216079 Issue: 5 Author Kate Ruddock (signature): Project Manager/Director Nathan Swankie (signature): Date: 13th October 2010 This report has been prepared by ENVIRON with all reasonable skill, care and diligence, and taking account of the Services and the Terms agreed between ENVIRON and the Client. This report is confidential to the client, and ENVIRON accepts no responsibility whatsoever to third parties to whom this report, or any part thereof, is made known, unless formally agreed by ENVIRON beforehand. Any such party relies upon the report at their own risk. ENVIRON disclaims any responsibility to the Client and others in respect of any matters outside the agreed scope of the Services. Version Control Record Issue Description of Status Date Reviewer Authors Initials Initials 1 First Issue to Client 03/09/2010 NS KR 1A Second draft 19/09/2010 NS KR 2 Second Issue to Client 16/09/2010 NS KR 3 Third Issue to Client 06/10/2010 NS KR 4 Fourth Issue to Client 07/10/2010 NS KR 5 Fifth Issue to Client 13/10/2010 NS KR Supplementary Environmental Report SSE Renewables Strathy North Contents List of Figures ii List of Appendices iii 1 Introduction 1 2 Scope of this Report 3 3 Site Context 5 3.1 The Site 5 3.2 The surrounding area 6 4 Consultation since the 2007 Section 36 Application 7 5 Description of Development 21 5.1 Design Evolution since the 2007 Section 36 Application 22 5.2 Construction Phase 23 5.3 Operation Phase 24 6 Site Environmental Management Plans 27 6.1 Introduction 27 6.2 Pollution Prevention Plan 29 6.3 Drainage Management Plan 32 6.4 Abstractions 34 6.5 Water Quality Monitoring Plan 34 6.6 Slope Stability Monitoring 36 6.7 Waste Management Plan 37 6.8 Excavated Materials and Re-instatement Plan 37 6.9 Ecological Protection Plan (and Ecological Clerk of Works) 37 6.10 Archaeological Clerk of Works 40 6.11 Geotechnical Clerk of Works 41 7 Topics where further information has been requested 43 7.1 Introduction 43 8 Excavated Materials and Reinstatement 45 9 Peat depth and peat stability 51 9.1 Peat stability 51 9.2 Peat depth 52 10 Ornithology 55 10.1 Introduction 55 10.2 Background information 58 10.3 Baseline data collection 59 10.4 Collision Risk Modelling for target species 60 UK1216079 Issue:5 Supplementary Environmental Report Strathy North SSE Renewables 10.5 Impacts on the qualifying interest of the SPA 61 10.6 Access track breeding bird assessment 73 10.7 Cumulative Effects 73 11 Impacts on peatland habitats qualifying interests of the SAC and Non SAC blanket bog 75 11.1 Impacts on peatland habitats qualifying interests of the SAC 75 11.2 Potential impacts on Non SAC blanket bog 76 12 Deer 79 13 Fish 81 13.1 Introduction 81 13.2 Summary of Baseline Information 81 14 Effect of design changes on conclusions of Environmental Statement 87 14.1 Landscape Character 87 14.2 Visual 87 14.3 Ecology 87 14.4 Birds 87 14.5 Noise 88 14.6 Cultural Heritage 88 14.7 Soil and Water 88 14.8 Roads and Traffic 88 14.9 Other Issues 88 List of Figures Figure 1 – Site location Figure 2 – Site location within context of designations Figure 3 – Site layout Figure 3a – Typical Access Tracks Figure 3b – Switching Station Figure 3c – Typical Turbine Foundation Figure 3d – Typical Crane Pad Figure 4 – Phase one of harvesting removal plan Figure 5 – Phase two of harvesting removal plan Figure 6 – Preliminary habitat management plan compartments Figure 7 – Combined peat risk assessment Figure 8 – Site Boundary & Wind Farm Infrastructure Figure 9 - Strathy North Access Track NVC Communities UK1216079 Issue: 5 Supplementary Environmental Report SSE Renewables Strathy North List of Appendices Appendix 1 (Please note Appendix 1 is provided as a separate volume, Volume 2) Appendix 1.1: Report 1: Compilation of Historical and 2003-09 Bird Data for Strathy North, and Collision Risk Predictions from 2003-08 Vantage Point Data, RPS 2010 Appendix 1.2: Report 2 Forest Clearance and Habitat Management at Strathy North: An Assessment of the Effects on Birds Connected with the Caithness and Sutherland Peatlands Special Protection Area, RPS 2010 Appendix 1.3: Report 3 Theoretical Collision Risk Modelling for Greenshank and Golden Plover at Strathy North Wind farm, RPS 2010 Appendix 1.4: Report 4 An Assessment of Impacts from Strathy North Wind farm on the Qualifying Birds of the Caithness and Sutherland Peatlands SPA, RPS 2010 Appendix 1.5: Report 5 An Assessment of Impacts of Access Track Construction and Deer Grazing on the Caithness and Sutherland Peatlands Special Area of Conservation, RPS 2010 Appendix 2 Appendix 2.1:SSE Renewables Template Site Environmental Management Plan Appendix 2.2 SSE Renewables Template Waste Management Plan Appendix 2.3 SSE Renewables Template Excavated Materials and Reinstatement Plan Appendix 2.4 Mouchel Framework Site Environmental Management Plan and Pollution Prevention Planning Appendix 2.5 Mouchel Framework Waste Management Plan Appendix 2.6 Mouchel Estimated Peat Excavation Volume and Potential Reuse Appendix 2.7: Mouchel Stream Crossings Assessment Appendix 2.8: Mouchel Peat Stability Risk Assessment Appendix 2.9 Sediment Management Technical Note Appendix 3 Appendix 3.1: A response to the Scottish Executive and Northern District Salmon Fishery Board comments on aquatic biology, Waterside 2008 Appendix 3.2: Scottish Executive (FRS) response to Waterside Report Appendix 3.3: Hydrochemical interpretation and recommendations for future baseline monitoring, Headley 2008 Appendix 3.4: SEPA response to Strathy North proposals – Aquatic biology and hydrochemistry Appendix 4 Appendix 4.1: Brief from The Highland Council Archaeological unit on the scope of the Environmental Impact Assessment for the proposed wind farm at Strathy North Appendix 5 Appendix 5.1: Consultation Responses UK1216079 Issue:5 Supplementary Environmental Report Strathy North SSE Renewables UK1216079 Issue: 5 Supplementary Environmental Report SSE Renewables Strathy North 1 Introduction SSE Renewables is seeking consent for the development of a wind farm at a site known as Strathy North, located within the Strathy North forest block approximately 5 km south of Strathy Village, Sutherland. The proposal includes the erection of wind turbines and associated infrastructure, including on site tracks, borrow pits, meteorological masts, electrical connection works, a control building, a substation and associated works (hereafter, ‘the proposed wind farm’). SSE Renewables submitted a Section 36 Application to the Energy Consents Unit of the Scottish Government in January 2007 (‘the Section 36 Application’). An Environmental Impact Assessment (EIA) was undertaken in relation to the proposed wind farm in accordance with the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2000, as amended and an Environmental Statement1 (ES) was submitted alongside the application. Following the submission of the Section 36 Application and ES, and further consultation with the Scottish Government and statutory consultees, including, in particular, the Scottish Environment Protection Agency (SEPA), Scottish Natural Heritage (SNH) and the Forestry Commission Scotland, additional survey and assessment work was undertaken and consequently minor changes to the proposed wind farm design were made. A set of amended application drawings together with associated supporting and illustrative material is being submitted to the Scottish Government in October 2010. The EIA team has reviewed the scheme design changes as presented in the amended application drawings to assess their impacts on the findings of the January 2007 ES. The conclusions of this exercise are that the January 2007 ES continues to provide an accurate assessment of the significant environmental effects of the proposed wind farm. However, this report is provided to present the findings of the additional survey, assessment and design work that has been undertaken since the submission of the January 2007 ES and provides a summary of the consequent changes in the ES to assist in considering the environmental effects of the amended proposed wind farm. This report is presented as two Volumes. Volume 1 contains the main report, and technical appendices 2 – 5. Volume 2 contains technical appendix 2 which contains all RPS Reports 1 – 5. 1 Scottish and Southern Energy, January 2007. Strathy North Wind Farm, Environmental Statement UK1216079 Issue: 5 1 Supplementary Environmental Report Strathy North SSE Renewables 2 UK1216079 Issue: 5
Description: