ebook img

DOWNING SQUARE SUBMISSION 2016-11-21 PDF

18 MB·English
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview DOWNING SQUARE SUBMISSION 2016-11-21

DOWNING SQUARE: BUILDINGS A & B ARLINGTON, MA DRAWING LIST OWNER: Pam Hallett, Housing Corporation of Arlington EX-1 ALTA SURVEY EX-2 ALTA SURVEY NOTES 252 Massachusetts Ave, 02474 A001 PLANTING PLAN 781-859-5211 (T) A002 SITE PLAN A010 SUMMER SOLSTICE SHADOW STUDY A011 WINTER SOLSTICE SHADOW STUDY ARCHITECT: A-A101 FLOOR PLANS B-A101 GROUND FLOOR PLAN DAVIS SQUARE ARCHITECTS B-A102 SECOND FLOOR PLAN B-A103 THIRD FLOOR PLAN 240A ELM STREET, SOMERVILLE, MA 02144 B-A104 FOURTH FLOOR PLAN 617.628.5700 (T) 617.628.1717 (F) A-A201 ELEVATIONS A-A202 ELEVATIONS A-A210 PERSPECTIVES A-A211 PERSPECTIVES A-A212 PERSPECTIVES B-A200 ELEVATIONS B-A201 ELEVATIONS B-A210 PERSPECTIVES B-A211 PERSPECTIVES B-A212 PERSPECTIVES DOWNING SQUARE OVERALL UNIT MIX LOCATION MAP SPECIAL PERMIT November 21, 2016 PROJECT NO. 16045 (cid:50)(cid:52)(cid:49)(cid:44)(cid:39)(cid:37)(cid:54)(cid:3)(cid:6) (cid:53)(cid:42)(cid:39)(cid:39)(cid:54)(cid:28)(cid:3)(cid:19) (cid:40)(cid:43)(cid:46)(cid:39)(cid:28) EX-1 (cid:53)(cid:37)(cid:35)(cid:46)(cid:39)(cid:28) (cid:38)(cid:35)(cid:54)(cid:39)(cid:28) (cid:50)(cid:52)(cid:49)(cid:44)(cid:39)(cid:37)(cid:54)(cid:3)(cid:47)(cid:35)(cid:48)(cid:35)(cid:41)(cid:39)(cid:52)(cid:28) PREPARED FOR: (cid:40)(cid:43)(cid:39)(cid:46)(cid:38)(cid:3)(cid:36)(cid:49)(cid:49)(cid:45)(cid:28) (cid:38)(cid:52)(cid:35)(cid:40)(cid:54)(cid:39)(cid:38)(cid:3)(cid:36)(cid:59)(cid:28) (cid:52)(cid:39)(cid:56)(cid:16) (cid:37)(cid:49)(cid:47)(cid:47)(cid:39)(cid:48)(cid:54)(cid:53) (cid:38)(cid:35)(cid:54)(cid:39) (cid:37)(cid:42)(cid:39)(cid:37)(cid:45)(cid:39)(cid:38)(cid:3)(cid:36)(cid:59)(cid:28) (cid:52)(cid:39)(cid:56)(cid:43)(cid:53)(cid:43)(cid:49)(cid:48)(cid:53) (cid:49)(cid:40)(cid:3)(cid:20) (cid:52)(cid:39)(cid:56)(cid:16)(cid:3)(cid:37) (cid:50)(cid:52)(cid:49)(cid:44)(cid:39)(cid:37)(cid:54)(cid:3)(cid:6) (cid:53)(cid:42)(cid:39)(cid:39)(cid:54)(cid:28)(cid:3)(cid:20) (cid:40)(cid:43)(cid:46)(cid:39)(cid:28) EX-2 (cid:53)(cid:37)(cid:35)(cid:46)(cid:39)(cid:28) (cid:38)(cid:35)(cid:54)(cid:39)(cid:28) (cid:50)(cid:52)(cid:49)(cid:44)(cid:39)(cid:37)(cid:54)(cid:3)(cid:47)(cid:35)(cid:48)(cid:35)(cid:41)(cid:39)(cid:52)(cid:28) PREPARED FOR: (cid:40)(cid:43)(cid:39)(cid:46)(cid:38)(cid:3)(cid:36)(cid:49)(cid:49)(cid:45)(cid:28) (cid:38)(cid:52)(cid:35)(cid:40)(cid:54)(cid:39)(cid:38)(cid:3)(cid:36)(cid:59)(cid:28) (cid:52)(cid:39)(cid:56)(cid:16) (cid:37)(cid:49)(cid:47)(cid:47)(cid:39)(cid:48)(cid:54)(cid:53) (cid:38)(cid:35)(cid:54)(cid:39) (cid:37)(cid:42)(cid:39)(cid:37)(cid:45)(cid:39)(cid:38)(cid:3)(cid:36)(cid:59)(cid:28) (cid:52)(cid:39)(cid:56)(cid:43)(cid:53)(cid:43)(cid:49)(cid:48)(cid:53) (cid:49)(cid:40)(cid:3)(cid:20) (cid:52)(cid:39)(cid:56)(cid:16)(cid:3)(cid:37) 1 2 3 4 5 6 7 8 9 10 11 12 13 NOTES DO NOT SCALE DRAWINGS. M c L SIDE LOT LINE K BIKE PARKING (3) UNIT #2 2-BEDROOM 850 SF J UNIT #1 2-BEDROOM 884 SF SIDE SITE LINE " 0 - FRONT LOT LINE 8' H 1 23 PARKING SPACES TRASH TOTER ENCLOSURE FOR BUILDING 'A' BICYCLE PARKING ENTRANCE G BICYCLE PARKING (2) REAR LOT LINE TRASH ROOM FOR BUILDING 'B' UNIT #1C INTERIOR TO BUILDING 1-BEDROOM 603 SF UP UNIT #1D UP 2-BEDROOM SIDE LOT LINE UNIT #1B UNIT #1E 859 SF F 1-BEDROOM 1-BEDROOM UNIT #1G BICYCLE PARKING (5) 610 SF UP 661 SF 3-BEDROOM UNIT #1F 1,108 SF 1-BEDROOM UP 606 SF UNIT #1A 3-BEDROOM 969 SF BICYCLE PARKING (6) No. REVISIONS/SUBMISSIONS Date E ACCESSIBLE RAMP & STAIR DOWN TO BIKEWAY BRIDGE TO/FROM MINUTEMAN BIKEWAY D PROPOSED OPEN SPACE: Consultant 15,750 SF (42%) C Project RENOVATIONS TO L DOWNING SQUARE: BUAILDINGS A & B ARLINGTON, MA I C T Title SITE PLAN E I M P B S R Designed Drawing No. DesignerE CheckePd Author Project No. 16045 A002 Scale 1" = 20'-0" Date A 11.21.2016 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 NOTES DO NOT SCALE DRAWINGS. MT. GILBOA HISTORIC DISTRICT: CONTEXT PRECEDENTS M AS SEEN IN THE CRESCENT HILL AVE, WESTMINSTER AVE AND MONTAGUE ST AREA c L K J H G F No. REVISIONS/SUBMISSIONS Date E D Consultant C Project RENOVATIONS TO L DOWNING SQUARE: BUAILDINGS A & B ARLINGTON, MA I C T Title SITE CONTEXT MT GILBOA HISTORIC E I M DISTRICT P B S R Designed Drawing No. DesignerE CheckePd Author Project No. 16045 A003 Scale Date A 11.21.2016 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 NOTES DO NOT SCALE DRAWINGS. SUMMER SOLSTICE EXISTING SHADOW M PROPOSED SHADOW c L K J H G 9AM 12PM F No. REVISIONS/SUBMISSIONS Date E D Consultant C Project RENOVATIONS TO L DOWNING SQUARE: BUAILDINGS A & B ARLINGTON, MA I C T Title SUMMER SOLSTICE SHADOW STUDY E I M P B 3PM 6PM S R Designed Drawing No. DesignerE CheckePd Author Project No. 16045 A010 Scale Date A 11.21.2016 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 NOTES DO NOT SCALE DRAWINGS. WINTER SOLSTICE EXISTING SHADOW M PROPOSED SHADOW c L K J H G 9AM 12PM F No. REVISIONS/SUBMISSIONS Date E D Consultant C Project RENOVATIONS TO L DOWNING SQUARE: BUAILDINGS A & B ARLINGTON, MA I C T Title WINTER SOLSTICE SHADOW STUDY E I M P B 3PM 6PM - NO SHADOWS ADDED S R Designed Drawing No. DesignerE CheckePd Author Project No. 16045 A011 Scale Date A 11.21.2016 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 c. NOTES n s, I ct e DO NOT SCALE DRAWINGS. hit c r GENERAL NOTES A • THESE NOTES APPLY TO EVERYTHING IN THE DRAWINGS TO THE LEFT. re a u q NUMBERED NOTES S 1. THESE NOTES APPLY TO SPECIFIC ELEMENTS IN THE DRAWINGS TO THE LEFT. s vi M a D 6 1 0 2 ht g ri y p o C c L UNIT #5 2-BEDROOM 884 SF UNIT #6 2-BEDROOM 850 SF K J BUILDING 'A' GROSS FLOOR AREA H GROUND LEVEL 2,081 SF LEVEL 2 2,139 SF LEVEL 3 2,139 SF Grand total 6,358 SF KEY: G-7 THIRD FLOOR PLAN G 3/16" = 1'-0" F No. REVISIONS/SUBMISSIONS Date E UNIT #3 UNIT #1 2-BEDROOM 2-BEDROOM 884 SF 884 SF UNIT #2 UNIT #4 2-BEDROOM 2-BEDROOM 850 SF 850 SF D Consultant C L Project DOWNING SQUARE: BUAILDING A ARLINGTON, MA I C T Title FLOOR PLANS E I M P B S R Designed Drawing No. TB E CheckePd AS Project No. 24000.00 A-A101 Scale A-1 SECOND FLOOR PLAN A-7 GROUND LEVEL PLAN As indicated Date A 3/16" = 1'-0" 3/16" = 1'-0" 11.21.2016 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 c. NOTES n s, I ct e DO NOT SCALE DRAWINGS. hit c r A e r a u q S s vi M a D 6 1 0 2 ht g ROOF LEVEL yri p 30' - 0" o C c L LEVEL 3 20' - 0" K LEVEL 2 10' - 0" E U N E V A J K R A P GROUND LEVEL 0' - 0" H G-1 LOWELL STREET ELEVATION G 3/16" = 1'-0" F ROOF LEVEL 30' - 0" No. REVISIONS/SUBMISSIONS Date E LEVEL 3 20' - 0" D Consultant LEVEL 2 10' - 0" T E E R T C S L L E L W Project O DOWNING SQUARE: BUAILDING A L ARLINGTON, MA I GROUND LEVEL C T 0' - 0" Title ELEVATIONS E I M P B S R Designed Drawing No. DesignerE CheckePd Author Project No. 24000.00 A-A201 Scale A-1 PARK AVENUE ELEVATION 3/16" = 1'-0" Date A 3/16" = 1'-0" 11.21.2016 1 2 3 4 5 6 7 8 9 10 11 12 13

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.