ebook img

Construction Environmental Management Plan Appendices - Part 2 PDF

186 Pages·2016·22.66 MB·English
by  JonesIain
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Construction Environmental Management Plan Appendices - Part 2

Erosion and Sediment Control Plan Site C Clean Energy Project Appendix I Erosion and Sediment Control Plan Site C Clean Energy Project Revision 1: July 8, 2016 PPaaggee 112277 Revision 1: July 8, 2016 Erosion and Sediment Control Plan Site C Clean Energy Project Revision History Version Date Comments Rev 1 07-08-2016 Final Plan PPaaggee 112288 Revision 1: July 8, 2016 SITE C CLEAN ENERGY PROJECT WATER MANAGEMENT, EROSION AND SEDIMENT CONTROL PLAN Revision 1 Prepared by Klohn Crippen Berger Ltd. and SNC-Lavalin Inc. For BC Hydro 1016.Z.02.020.ENZ.00755.PLAN May 2016 Not to be reproduced without the permission of BC Hydro SITE C CLEAN ENERGY PROJECT WATER MANAGEMENT, EROSION AND SEDIMENT CONTROL PLAN Revision 1 Prepared by Klohn Crippen Berger Ltd. and SNC-Lavalin Inc. For BC Hydro 1016.Z.02.020.ENZ.00755.PLAN May 2016 Not to be reproduced without the permission of BC Hydro Site C Clean Energy Project Water Management, Erosion and Sediment Control Plan - Revision 1 Page iii SITE C CLEAN ENERGY PROJECT WATER MANAGEMENT, EROSION AND SEDIMENT CONTROL PLAN Revision 1 Prepared by: Winston Wade, MEM, P.Eng. Cory Turkington, CPESC SNC-Lavalin Inc. SNC-Lavalin Inc. Checked by: Nicole Anderson, CPEng. Klahn Crippen Berger Ltd. Reviewed by: Ali Siner, P.Eng. Brian McGhee, P.Eng. CEng. MICE SNC-Lavalin Inc. Klahn Crippen Berger Ltd. Accepted by: Simon Douglas, P.Eng. Klahn Crippen Berger Ltd. t» •)) 1016.Z.02.020.ENZ.00755. PLAN Klohn Crippen Berger May 2016 SNC • LAVALIN Not to be reproduced without the permission ofB C Hydro Site C Clean Energy Project Water Management, Erosion and Sediment Control Plan – Revision 1 Page iv DISCLAIMER This plan was prepared by Klohn Crippen Berger Ltd. and SNC-Lavalin Inc. solely for BC Hydro internal purposes. All other parties are third parties. Neither BC Hydro nor Klohn Crippen Berger Ltd. nor SNC-Lavalin Inc. represents, guarantees or warrants to any third party, either expressly or by implication: (a) the accuracy, completeness or usefulness of; (b) the intellectual or other property rights of any person or party in, or (c) the merchantability, safety or fitness of purpose of, any information, product or process disclosed, described or recommended in this plan. Neither BC Hydro nor Klohn Crippen Berger Ltd. nor SNC-Lavalin Inc. accept any liability of any kind arising in any way out of the use by a third party of any information, product or process disclosed, described or recommended in this plan, nor do BC Hydro, Klohn Crippen Berger Ltd. nor SNC-Lavalin Inc. accept any liability arising by way of reliance by a third party upon any information, statement or recommendation contained in this plan. Should third parties use or rely on any information, product or process disclosed, described or recommended in this plan, they do so entirely at their own risk. COPYRIGHT NOTICE © 2016 BC Hydro. This plan may not be reproduced in whole or in part without the prior written consent of BC Hydro. 1016.Z.02.020.ENZ.00755.PLAN May 2016 Not to be reproduced without the permission of BC Hydro Site C Clean Energy Project Water Management, Erosion and Sediment Control Plan – Revision 1 Page v LIST OF ACRONYMS ARD/ML Acid Rock Drainage/Metal Leaching BCEAO BC Environmental Assessment Office BCWGs British Columbia Water Quality Guidelines BC British Columbia BMP Best Management Practice CDA Canadian Dam Association CCME Canadian Council of Ministers of the Environment – Water Quality Guidelines CEMP Construction Environmental Management Plan DBM Design Basis Memorandum DFO Department of Fisheries and Oceans El. Elevation EM Environmental Manager/Monitor EPP Environmental Protection Plan ESC Erosion and Sediment Control IET Integrated Engineering Team KCB Klohn Crippen Berger Ltd. LBE Left Bank Excavation m metre m/s metres per second m³/s cubic metres per second MCW Main Civil Works MELP Ministry of Environment, Lands and of Parks MEM Ministry of Energy and Mines MOE Ministry of Environment NBCC National Building Code of Canada PCN Peace Canyon Dam P Eng Professional Engineer QP Qualified Professional RCC Roller Compacted Concrete RSEM Relocated Surplus Excavated Material RUSLE Revised Universal Soil Loss Equation SEV Severity of Ill Effects SCS Soil Conservation Service SLI SNC-Lavalin Inc. WM Water Management WQ Water Quality WSC Water Survey of Canada 1016.Z.02.020.ENZ.00755.PLAN May 2016 Not to be reproduced without the permission of BC Hydro Site C Clean Energy Project Water Management, Erosion and Sediment Control Plan – Revision 1 Page vi SITE C CLEAN ENERGY PROJECT WATER MANAGEMENT, EROSION AND SEDIMENT CONTROL PLAN REVISION 1 CONTENTS Section Subject Page EXECUTIVE SUMMARY ................................................................................................ IX  1.  INTRODUCTION .................................................................................................. 1  1.1  General ...................................................................................................... 1  2.  ROLES AND RESPONSIBILITIES ....................................................................... 3  2.1  BC Hydro ................................................................................................... 3  2.2  Contractors ................................................................................................ 3  3.  DESIGN BASIS FOR EROSION AND SEDIMENT CONTROLS ......................... 6  3.1  Water Quality Criteria ................................................................................. 6  3.2  Climate ....................................................................................................... 6  3.3  Design Rainfall ........................................................................................... 8  3.4  Runoff Coefficients .................................................................................... 8  3.5  Temporary Structures ................................................................................ 8  3.6  Sedimentation Pond Design ...................................................................... 9  3.7  Reference Documents ............................................................................. 10  4.  EROSION AND SEDIMENTATION CONTROLS ............................................... 11  4.1  ESC Approach Preferences ..................................................................... 11  4.2  Erosion Potential ...................................................................................... 12  4.3  Erosion and Sedimentation Control Measures ......................................... 12  4.4  ESC Measures ......................................................................................... 28  5.  ESC CONTROLS FOR PROJECT AREAS ........................................................ 41  5.1  General .................................................................................................... 41  5.2  Left Bank Excavation ............................................................................... 43  1016.Z.02.020.ENZ.00755.PLAN May 2016 Not to be reproduced without the permission of BC Hydro Site C Clean Energy Project Water Management, Erosion and Sediment Control Plan – Revision 1 Page vii SITE C CLEAN ENERGY PROJECT WATER MANAGEMENT, EROSION AND SEDIMENT CONTROL PLAN REVISION 1 CONTENTS Section Subject Page 5.3  RSEM Area L3 ......................................................................................... 44  5.4  RSEM Area L5 ......................................................................................... 46  5.5  RSEM Area L6 ......................................................................................... 48  5.6  RSEM Area R5a and R5b ........................................................................ 49  5.7  RSEM Area R6 ........................................................................................ 51  5.8  Road Construction ................................................................................... 52  5.9  Rail Siding ................................................................................................ 54  6.  REFERENCES ................................................................................................... 56  APPENDICES Appendix A  ESC Best Management Practices  Appendix B  Referenced Drawings  TABLES Table 3-1  Rainfall Intensity Duration Frequency at Fort St. John Airport Climate Station (1973 - 2002) ................................................................................ 8  Table 3-2  Sedimentation Pond Performance Criterion Guidelines ............................. 9  Table 4-1  Suitability of ESC Practices for Various Construction Activities ............... 12  Table 4-2  Application of Best Management Practices .............................................. 14  Table 4-3  Suggested armouring of Drainage Channels ........................................... 32  Table 4-4  ESC Considerations on Temporary Soil Slopes ...................................... 33  Table 4-5  Suggested Minimum Slope Drain Diameter Based on Contributing Area 34  Table 4-6  Suggested Spacing for Check Dams ....................................................... 35  Table 5-1  Suggested ESC Measures by Area ......................................................... 42  1016.Z.02.020.ENZ.00755.PLAN May 2016 Not to be reproduced without the permission of BC Hydro Site C Clean Energy Project Water Management, Erosion and Sediment Control Plan – Revision 1 Page viii SITE C CLEAN ENERGY PROJECT WATER MANAGEMENT, EROSION AND SEDIMENT CONTROL PLAN REVISION 1 CONTENTS Section Subject Page Table 5-2  LBE ESC Measures ................................................................................. 43  Table 5-3  RSEM AREA L3 ESC Measures .............................................................. 45  Table 5-4  RSEM AREA L5 ESC Measures .............................................................. 46  Table 5-5  RSEM AREA L6 ESC Measures .............................................................. 48  Table 5-6  RSEM AREA R5a R5b ESC Measures .................................................... 49  Table 5-7  RSEM Area R6 ESC Measures ............................................................... 51  Table 5-8  Rail Siding ESC Measures ....................................................................... 54  FIGURES Figure 3-1 Mean Daily Temperature for Fort St. John ..................................................... 7  Figure 3-2 Mean Monthly Precipitation for Fort St. John ................................................. 7  Figure 1: Site Disturbance Overview and Catchment Maps Figure 2: Schematic of LBE Hydraulic Flow Pathways and ESCs by Construction Phase Figure 3: Schematic of RSEM Area L3 Hydraulic Flow Pathways and ESCs by Construction Phase Figure 4: Schematic of RSEM Area L5 Hydraulic Flow Pathways and ESCs by Construction Phase Figure 5: Schematic of RSEM Area L6 Hydraulic Flow Pathways and ESCs by Construction Phase Figure 6: Schematic of Area R5a and R5b Hydraulic Flow Pathways and ESCs by Construction Phase Figure 7: Schematic of Area R6 Hydraulic Flow Pathways and ESCs by Construction Phase Figure 8: Schematic of Septimus Siding Hydraulic Flow Pathways and ESCs by Construction Phase 1016.Z.02.020.ENZ.00755.PLAN May 2016 Not to be reproduced without the permission of BC Hydro

Description:
Revision 1: July 8, 2016. Page 128. Erosion and Sediment Control Plan. Site C Clean Energy Project. Revision History. Version. Date. Comments.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.