bIffI alGa DOuBle aCTinG pneuMaTiC aCTuaTOr InstallatIon, operatIon and MaIntenance Manual 1. General warninGs installation, maintenance or use, or by irregular working conditions, the repairs will be charged Important according to applicable fees. The manual is an integral part of the machine, it should be carefully read before carrying out The warranty and Biffi Italia S.r.l. liability any operation and it should be kept for future shall lapse in the event that any modification references. or tampering whatsoever be performed on the actuator. 1.1 GEnEraLItIES Biffi italia s.r.l. actuators are conceived, manufactured and controlled according to the Quality Control system in compliance with tabLE of contEntS en isO 9001 international regulation. 1 General warnings ..........................................1 1.1.1 applicable regulation en isO 12100-1: 2005: safety of machinery 2 installation .....................................................3 – Basic notions, general design principles. part 1-Basic terminology, method. 3 Operation and use .........................................7 en isO 12100-2: 2005: safety of machinery – Basic notions, general design principles. 4 Operational tests and inspections..............23 part 2-Technical principles and specification. 2006/42/eC: Machine directive. 5 Maintenance. ...............................................23 97/23/eC: Directive for pressure peD equipment. 6 Troubleshooting ..........................................30 2006/95/eC: Directive for low voltage equipment. 7 layouts .........................................................30 2004/108/eC: Directive for the electromagnetic compatibility. 8 Date report for maintenance operations ...39 94/9/eC: Directive and safety instructions for use in hazardous area. 1.1.2 terms and conditions Biffi italia s.r.l. guarantees that all the items produced are free of defects in workmanship and manufacturing materials and meet relevant current specifications, provided they are installed, used and serviced according to the instructions contained in the present manual. The warranty can last either one year from the date of installation by the initial user of the product, or eighteen months from the date of shipment to the initial user, notE depending on which event occurs first. all Biffi italia s.r.l. pays the highest attention to collecting detailed warranty conditions are specified in and verifying the documentation contained in this the documentation forwarded together with the user manual. However Biffi italia s.r.l. is not liable product. This warranty does not cover special for any mistakes contained in this manual, for products or components not warranted by damage or accidents due to the use of the latter. subcontractors, or materials that were used The information contained is of exclusive reserved or installed improperly or were modified or ownership of Biffi italia s.r.l. and may be modified repaired by unauthorized staff. in the event without prior notice. that a fault condition be caused by improper www.pentair.com/valves © 2012 pentair plc. all rights reserved. VcIom-03129-En 15/05 bIffI alGa DOuBle aCTinG pneuMaTiC aCTuaTOr InstallatIon, operatIon and MaIntenance Manual The actuator (see figure 2) is made up of 1.4 Data ShEEt a weatherproof scotch yoke mechanism transforming the linear movement of the supply fluid air, nitrogen or sweet gas, special pneumatic cylinder (on closing or opening) into version available for sour gas the rotary movement, which is necessary for Operating standard: from –30°C to +100°C operation. The angular stroke of the yoke is temperature Optional: from –60° to +200°C adjustable between 82° and 98° by means of supply pressure please refer to technical the external mechanical stops screwed into the document: 'actuator data sheet' left wall of the mechanism housing and into the Output torque up to 750,000 nm end flange of the pneumatic cylinder. The cover (higher value with special version) of the scotch yoke mechanism is arranged for the assembly of the required accessories fIGurE 1 - Data plate (positioner, signalling limit switches, position transducer, etc.) by means of proper matching units. The above mentioned accessories are 1.2 IDEntIfIcatIon pLatE operated by the actuator drive sleeve. The housing of the scotch yoke mechanism has a it is forbidden to modify the information and the flange with threaded holes to fix the actuator to marks without previous written authorization by the valve either directly or, if required, with the Biffi italia s.r.l. interposition of an adaptor flange or a mounting The plate fastened on the actuator contains the bracket. The actuator yoke has a hole with following information (figure 1). keyways suitable for the assembly of an insert bush the internal hole of which is machined 1.3 IntroDucInG thE actuator (by Biffi or at customer's care), according to the shape and dimensions of the valve stem. The alGa actuator is engineered and Biffi can supply different types of control manufactured to provide maximum torque system following customer's requirements. output with minimum supply pressure. The expected lifetime of actuator is alGa actuators are suitable for the operation approximately 30 years. of any quarter turn operation such of ball, plug, butterfly valves or dampers, in both On-Off and Modulating heavy duty service. Manual hand pump - MHp Control system (optional) (optional) Valve position indicator pneumatic cylinder scotch yoke mechanism Hydraulic cylinder for alGa-MHp models or second pneumatic cylinder for alGa*2 Valve coupling double cylinder models (optional) fIGurE 2 - identification of actuator parts 2 bIffI alGa DOuBle aCTinG pneuMaTiC aCTuaTOr InstallatIon, operatIon and MaIntenance Manual 2. insTallaTiOn 2.4 actuator aSSEmbLy on thE VaLVE fIGurE 3a, 3b - lifting points for alGa / alGa- MHp / alGa-MsJ actuators. 2.1 chEckS upon actuator rEcEIpt 2.4.1 types of assembly For coupling to the valve, the housing is 3a • Check that the model, the serial number of provided with a flange with threaded holes the actuator and the technical data reported according to Biffi standard tables (sCn6200; on the identification plate correspond with sCn6200-1; sCn6201; sCn6201-1). The those of order confirmation (par. 1.2). number, dimensions and diameter of the • Check that the actuator is equipped with the holes are made in accordance with isO 5211, fittings as provided for by order confirmation. but for actuator models 0.3 to 6 the holes are • Check that the actuator was not damaged drilled on the centerline in order to allow an during transportation: if necessary renovate easier assembly of an intermediate flange, the painting according to the specification when required. This intermediate flange (or reported on the order confirmation. spool-piece) can be supplied when the valve • If the actuator is received already assembled flange can not directly match the actuator with the valve, its settings have already been flange in its 'standard' configuration. For the made at the factory. biggest actuator models, the actuator flange if the actuator is delivered separately can be machined in accordance with the valve from the valve, it is necessary to check, flange dimensions. and, if required, to adjust, the settings The yoke has bored with keyways for coupling of the mechanical stops (par. 3.3) and of to the valve stem, the dimensions of which are microswitches (if any) (par. 3.4). according to Biffi standard tables sCn6200- and sCn6201 (see next pages). 2.2 actuator hanDLInG 1, 2 = lifting points (obligatory) Important 3 = Balancing point The lifting and handling should be made by qualified staff and in compliance with the laws and provisions in force. 3b WarnInG The fastening points are appropriate for the lifting of the actuator alone and not for the valve and actuator assembly. Avoid that during the handling, the actuator passes above the staff. The actuator should be handled with appropriate lifting means. The weight of the actuator is reported on the delivery bill. 2.3 StoraGE if the actuator needs storage, before installation follow these steps: • Place it on a wood surface in order not to deteriorate the area of valve coupling. • Make sure that plastic plugs are present on the pneumatic and electrical connections (if present). 1 = point of support • Check that the cover of the control group and 2 = supports for lateral positioning of the limit switch box (if any) are properly closed. WarnInG if the storage is long-term or outdoor: 3 = Don’t lay the actuator on tie rods of cylinder /s • Keep the actuator protected from direct and don’t lay the actuator on accessories (manual weather conditions. hand pump, manual jackscrew, pneumatic control • Replace plastic plugs of pneumatic and group etc.) electrical connections (if any) with metal plugs that guarantee perfect tightness. • Coat with oil, grease or protection disc, the valve coupling area. • Periodically operate the actuator (par. 3.3). 3 bIffI alGa DOuBle aCTinG pneuMaTiC aCTuaTOr InstallatIon, operatIon and MaIntenance Manual fIGurE 4a fIGurE 4b aCTuaTOr MODels 0.3 TO 6 aCTuaTOr MODels 14 TO 42 Drive sleeve max Drive sleeve H max H +0.5h₁0 +0.5h₁0 Ø d₂+00.1 Ø d₄ Ø d₂+0.1 Ø d₄ h₂ Ø d₃±0.2 ₂h Ø d₃±0.2 Ø d₁ max Ø d₁ max n. threaded holes e pcd, number and size according to Iso 5211 g n. threaded holes an 'w'D10 n.8 holes flange w D10 K0+0.4 p(inbcsudtte ,t anhdue mohFfob lsleoetrrs awa dandr dell e ison itnzhee ec ae ccnectnoetrreldirinnliegn et)o Iso 5211 en.12 holes fl Ø d₅++00..21 +0,40K Flow line g n e a 4 holes flang Ø d₅++00.2.1 45º n.16 holes fl n. Top view of the scotch yoke mechanism (actuator shown in closed position) Top view of the scotch yoke mechanism (actuator shown in closed position) coupLInG DImEnSIonS moDELS 0.3 to 0.6 (mm) actuator model Ø d₁ Ø d₂ Ø d₃ Ø d₄ n h₁ h₂ h max Ø d₅ W k 0.3 240 93 165 M20 4 5 17 127 70 12 75.6 0.9 310 112 254 M16 8 5 19 150 86 14 96.6 1.5 360 144 298 M20 8 6 19 190 112 18 119 3 430 195 356 M30 8 9 23 200 157 25 167.8 6 520 250 406 M36 8 14 29 260 200 28 212.8 coupLInG DImEnSIonS moDELS 14 to 42 (mm) actuator model Ø d₁ Ø d₂ Ø d₃ Ø d₄ n h₁ h₂ h max Ø d₅ W k 14 580 250 483 M36 12 10 29 340 175 45 195.8 18 680 290 603 M36 16 12 32 350 200 45 220.8 32 780 290 603 M36 16 12 32 400 220 50 242.8 35 780 315 603 M36 16 11 32 400 240 50 242.8 42 840 310 603 M36 16 12 32 400 220 50 242.8 4 bIffI alGa DOuBle aCTinG pneuMaTiC aCTuaTOr InstallatIon, operatIon and MaIntenance Manual fIGurE 4c fIGurE 4D aCTuaTOr MODels 50 anD 60 inserT BusH + inTerMeDiaTe COuplinG FlanGe Drive sleeve Housing Drive sleeve max H +0.5h₁0 Ø d₂+00.1 Ø d₄ insert bush adaptor flange Ø d₃±0.2 h₂ Ø d₁ max e g an Standard position 1 n. threaded holes s fl e Flange sizing according to Iso 5211 hol 8 'w'D10 n. Flow line e g an Drive sleeve s fl Ø d₅++00.2.1 +0,40K Flow line 4 hole n. insert bush Top view of the scotch yoke mechanism (actuator shown in closed position) position 2 position 3 position 4 coupLInG DImEnSIonS moDELS 50 anD 60 (mm) actuator model Ø d₁ Ø d₂ Ø d₃ Ø d₄ n h₁ h₂ h max Ø d₅ W k 50 800 315 698 M36 24 10 32 430 240 56 264.8 60 840 315 698 M36 24 10 32 430 240 56 264.8 if required, for the standard models size The Biffi insert bush with 2 external keys at 45° 0.3 to 6, Biffi can supply an insert bush with allows to position the keyway for the valve every un-machined bore in accordance with Biffi 90°. Consequently actuator can be mounted standard table sCn6202. On request the insert in 4 positions at 90° on top of the valve. For bush bore can be machined by Biffi to couple biggest actuator models, the bore of the yoke the valve stem, provided its dimensions match can be machined according to the dimensions the maximum stem acceptance of the bush of valve stem. according to Biffi doc.: Tn1005. The particular execution of the flange and bushing allow the position 2 position 3 position 4 actuator to be rotated by 90° in 4 different rotate insert bush 180° around rotate insert bush 180° around rotate insert bush 180° around positions according to figure 4D. vertical-standard position (1) axis a-a, from position 2 axis a-a, from position 1 Insert bush turned upside down 5 bIffI alGa DOuBle aCTinG pneuMaTiC aCTuaTOr InstallatIon, operatIon and MaIntenance Manual 2.4.2 assembly procedure 2.5 pnEumatIc connEctIonS Important Important Failure to comply with the following procedures Check that the values of pneumatic supply may impair product warranty. available are compatible with those reported on the identification plate of the actuator. WarnInG Installation, commissioning and maintenance and WarnInG repair works should be carried out by qualified The connections should be made by qualified staff. A non-conforming assembly could be the staff. Use pipes and connections appropriate as source of serious accidents. for type, material and dimensions. fIGurE 5 - Junction box on control group (if foreseen). For actuator assembly on the valve: • Properly de-burr the ends of rigid pipes. • Properly clean the interior of pipes sending Important through them plenty of the supply fluid used upon actuator commissioning please carry out Check that the assembly position, as shown in the system. the following checks: on the documentation, complies with system’s • Mould and fasten the connection pipes so that • Check that paint is not be damaged during geometry. Check the consistency of the parts of no irregular strains at entries or loosening of transport, if necessary repair the damages to actuator-valve coupling. threaded connections occur. paint coat. • Make the connections according to the • Check that the pressure and quality of the • Operate the actuator so that it reaches the operating diagram. gas supply (filtering degree, dehydration) are position matching valve position (par. 3.3). • Check the absence of leakages from as prescribed. Check that the feed voltage • Lubricate valve stem with oil or grease. pneumatic connections. values of the electric components (solenoid • Properly clean and remove grease from valve coils, microswitches, pressure switches, coupling flange surfaces. 2.6 ELEctrIcaL connEctIonS (If any) etc.) are compatible with those reported • Connect, if supplied separately, the on the identification plate of the actuator adjustment insert to valve stem and fasten it Important (figure 1). with the special fastening pins. Use components appropriate as for type, material • Check that the setting of the components of • Lift the actuator using the special lifting and dimensions. the actuator control unit (pressure regulator, points (par. 2.2). pressure switches, flow control valves, etc.) • Install the actuator so that valve stem inserts WarnInG meet the plant requirements. in the coupling area. This coupling should be The connections should be made by qualified staff. • Carry out all kinds of operations and check made without forcing. Before carrying out any operation, cut line their proper execution (par. 3.3). • Fasten the two parts with the threaded power off. • Check the absence of leakages in the connections (screws, tie rods, nuts). if Safety provisions: pneumatic connections. if necessary tighten holes of coupling flanges are not aligned, 2006/95/EC: Directive for low voltage equipment. the nuts of the pipe-fittings. adequately operate the actuator if necessary 2004/108/EC: Directive for the electromagnetic • Check proper operation of all the due move the mechanical stops backwards compatibility. signalling (valve position, gas supply pressure (par. 3.3). 94/9/CE: Directive and safety instructions for use etc.). • Fasten threaded connections. Please refer to in hazardous area • Make a complete functional test in order table 1. to verify all the operations are executed remove plastic plugs from cables entries. according to operating schematic diagram The screwing values in table 1 were calculated • Screw firmly the cable glands. supplied. considering the materials asTM a320 l7 for • Introduce connection cables. screws or tie rods and asTM a194 gr.2H for • Make the connections in compliance the nuts. with applicable wiring diagrams on the documentation supplied. • Screw the cable gland. • Replace the plastic plugs of unused entries tabLE 1 - nutS tIGhtEnInG torquE with metal plugs. threading tightening torque (nm) M8 20 2.7 commISSIonInG M10 40 M12 70 WarnInG M14 110 Check that values of electrical supply to the M16 160 control group (if foreseen) are compatible with M20 320 those on the plate on the junction box (figure 5). M22 420 Installation, commissioning and maintenance and M24 550 repair works should be made by qualified staff. M27 800 M30 1100 M33 1400 M36 1700 6 bIffI alGa DOuBle aCTinG pneuMaTiC aCTuaTOr InstallatIon, operatIon and MaIntenance Manual 3. OperaTiOn anD use For local or remote operations, please refer for information only to par. 3.3 and prior 3.1 opEratIon DEScrIptIon to technical documentation furnished with actuators. in the normal operating situation, the alGa Typical schematics for various applications actuator is fed by pressurized gas which flows are follow attached for information only, the into the relevant cylinder chamber (for example function described are furnished only on opening). The cylinder piston stroke causes specific customer demand. the actuator operation and the consequent For all the relevant information please refer to the valve movement to the operational position specific technical documentation supplied with requested (in this case to the 'open' position). actuators. upon a demand, the closing chamber the pneumatic connection cylinder is fed by pressurized gas and at the same time the gas is discharged from the open chamber into the return line: the actuator fIGurE 6 performs the closing operation driven by the piston movement, and the valve moves from the open position to the close (safety-related) position. partS LISt Item name 1 Housing 2 Yoke 3 Yoke bushing 4 Cover 5 Guide block pin 6 sliding block 7 Guide block 8 Guide bar 9 Guide block bushing 10 Travel stop screw 11 Cylinder head flange 12 piston rod bushing 13 piston rod seal 14 piston rod 15 piston 16 piston guide sliding ring 17 piston seal ring 18 Cylinder tube 19 end flange 20 Travel stop screw 21 sealing washer 22 Tie rod fIGurE 7 7 bIffI alGa DOuBle aCTinG pneuMaTiC aCTuaTOr InstallatIon, operatIon and MaIntenance Manual The diagram shows the simplest On-Off fIGurE 8a control. The gas supply pressure is applied to On-OFF serViCe: FOur waY COnTrOl ValVe one side of the cylinder and exhausted from the opposite side. when the control valve (2) is actuated the connection of supply and exhaust to the cylinder chambers are reversed. The control valve can have many types of actuating devices (solenoid, manual control, pneumatic pilot, spring, etc.). The spring return control Manual control valves allow 'fail safe' operation. solenoid pneumatic pilot control pressurized air control atmospheric pressure air Dual solenoid control The system allows 'fail safe' operation when fIGurE 8b the pressure in the gas supply line drops below On-OFF serViCe: air Fail saFe sYsTeM a set value. The diagram shows the actuator in the 'fail safe' condition. when the gas supply pressure drops below the pressure switch (5) set point, the pneumatic supply to the solenoid valve (6) pilot is exhausted and the actuator moves to the 'fail safe' position by using the gas stored in the tank (4).The tank is connected to the gas supply through the check valve (3). pressurized air pressurized air (low pressure) atmospheric pressure air when modulating control is required as a fIGurE 8c function of a pneumatic or electric control MODulaTinG serViCe signal, a positioned (5) is used, which controls the supply to the actuator cylinder to keep the valve in the required angular position. The positioner has a mechanical linkage to the actuator, for a feedback of the valve position. electropneumatic positioner pneumatic pneumatic electric positioner control signal control signal pressurized air (suppy) reduced pressurized air (opening chamber) reduced pressurized air (closing chamber) 8 bIffI alGa DOuBle aCTinG pneuMaTiC aCTuaTOr InstallatIon, operatIon and MaIntenance Manual The MHw - MsJ jackscrew manual override fIGurE 9a can be supplied for model up to 3. The override eMerGenCenCY Manual OVerriDe is mounted on the left side of the actuator, the jackscrew end is screwed into the guide block. a bronze split screw nut is mounted inside the body. By rotating the engagement lever, the screw nut is engaged with the jackscrew. when the screw nut is engaged with the jackscrew manual operation follows by rotating the body of the screw container by a lever (for MsJ models) or by a handwheel (for MHw models). The MHp hydraulic manual override is used fIGurE 9b to manually operate the actuator in lack of air MHp HYDrauliC Manual OVerriDe supply. it also allows to accurately adjust the actuator operating times, independently in opening and in closing, by way of the hydraulic regulators which work on the oil flow from one chamber to the other of the hydraulic cylinder during pneumatic operation. Moreover it permits a smooth angular speed all along the stroke. During manual operation the flow regulators are by-passed to make the force on the hand pump lever easy. The MHp unit consists of a hydraulic cylinder mounted directly on the actuator. The piston rod end is screwed into the guide block. The compact hydraulic control unit consists of a hand pump, directional control valve, oil tank, relief valve and two unidirectional flow regulators. The directional control valve has three operating positions: 'remote': the actuator is operated by pneumatic supply; 'to open': the actuator operation is opening by hand pump. On request the hydraulic manual override type MHp2 (double hand pump version) can be supplied, which allows the remote control to automatically override manual operation. 9 bIffI alGa DOuBle aCTinG pneuMaTiC aCTuaTOr InstallatIon, operatIon and MaIntenance Manual fIGurE 10a - pnEumatIc opEratIon fIGurE 10b - manuaL opEratIon The diagram is drawn with actuator under pneumatic operation in opening. The diagram is drawn with actuator under manual operation towards open. The flow regulator Fa allows control of the stroke time. The operation to be performed is selected by the directional control valve D. pneumatic pneumatic connection connection to open to open pneumatic pneumatic connection connection to close to close scotch yoke mechanism ra = relief valve for automatic operation pneumatic cylinde rm = relief valve for manual operation Hydraulic cylinder p = Hand pump Hydraulic manual override D = Hand operated directional control valve High pressure oil Fa = unidirectional flow regulator (opening operation) intermediate pressure oil Fc = unidirectional flow regulator (closing operation) low pressure oil Fr = Bidirectional flow regulator pressurized air C v = Check valve atmospheric pressure air Ot = Oil tank ls = level stick with relief valve 3.2 rESIDuaL rISkS WarnInG It is recommended to pipe exhaust gas. The actuator has parts under pressure. Use the due caution. Use individual protections provided for by the laws and provisions in force. 3.3 caLIbratIon of thE anGuLar StrokE 11a The angular stroke of the yoke can be adjusted between 82˚÷98˚ (±4˚ with respect to the fIGurE 11a, 11b - Mechanical stops nominal positions of complete opening and closing) by means the mechanical stops screwed into the left side of the housing (open 11b valve) and into the end flange of the pneumatic cylinder (closing) (figures 11a and 11B). in case of an actuator with two cylinders (figure 12), both mechanical stops are screwed on the end flanges of the cylinders. fIGurE 12 - actuator with two cylinders 10
Description: