ARK SYNDICATE MANAGEMENT LTD Offshore Windenergie – Aus Sicht des Londoner Marktes Lloyd’s Meet the Market, Frankfurt 21/04/2015 Simone Streidl – Underwriter Renewable Energy Content • Ark Syndicate 4020 • Offshore Wind Industry Update • Loss Statistics • Wordings Contingent Business Interruption (CBI) Multi-year policy periods Increasing sub-limits Design error / Defective parts (LEG 3) • Conclusion 2 Inhalt • Ark Syndicate 4020 • Offshore Wind Industrie • Schadenstatistiken • Vertragsklauseln Zulieferer und Abnehmer bedingte Betriebsunterbrechung Versicherungspolicen mit mehrjaehriger Laufzeit Ansteigende Haftungsbegrenzungen Designfehler und schadhafte Teile (LEG 3) • Zusammenfassung 3 Ark Syndicate 4020 • Syndicate 4020 at Lloyd’s • Diversified and balanced portfolio of reinsurance and insurance business • Experienced team of underwriters in their specialist areas • Clear understanding of our clients and producers • Long term relationships • Lloyd’s market ratings: AM Best: A (Excellent) / S&P’s: A+ (Strong) • The Renewable Energy team at Ark Worldwide portfolio Construction All Risks and Operational All Risks Products: Onshore and Offshore Wind Farms - Solar (PV and Thermal) – Geothermal - Wave & Tidal - Hydroelectric 4 Industry Update Source e: EER, BTM; Global Data; Roland Berger 5 Industry Update Source: EER; BTM; Global Data; Roland Berger 6 Loss Experience Offshore Wind Construction Claims Spread of Costs Vessel Charges = 65% Special Machinery (Third Party) = 1% 8% 5% Site Works 5% Cable claims 40.3 % (contractor labour) 16% = 16.5% Collision 6.9 % Materials = 5% 65% 1% Electrical 12.5 % Foundations 15.3% Engineering (survey Fire 1.4 % / consultants) = 4.5% Lightning 2.8 % Admin (overhead / Blades 4.2 % legal / insurance) = 8% 7 Wordings Broad Scope of Cover • Contingent Business Interruption Potential bottlenecks on the supply side for components Very broad covers including weather risk, vessel availability • Multi-year policy periods for operation after the construction phase • Increasing sub-limits • Design error / Defective parts (LEG3) 8 Bottlenecks 9 Contingent Business Interruption (CBI) • Offshore converter stations Bottleneck Long lead times due to limited number of suppliers and delivery time from 30 to 50 month • Offshore HVDC cables and cable laying Only few suppliers. Shortages may occur • Installation vessels for converter stations Only few vessels can install converter stations >10,000 t • Transmission system operator (TSO) TenneT to provide grid connection for all projects in the German North Sea 10
Description: