ebook img

Apollo 10 PDF

322 Pages·2002·11.9 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Apollo 10

STICENTER-GS 53-45/100 NASA JOHNSON SPACE CEN'TER HOUSTON, TX 77058-3696 NASA Connectionto Aerospace AService of: NationalAeronautiCSand SpaceAdrrdnistration U SCII_IqTIFIC TgCNNICAb IN FORI¢IATION GEORGEC.MARSHALL SPACE FLIGHTCENTER MPR-SAT-FE6-9-7 SATURNV LAUNCHVEHICLE _ FLIGHTI'VALUATIONREPORT-AS-50_ ,,i ,APOLLO 10 MI SSION PREPAREDBY SATURNFLIGHTEVALUATIONWORKINGGROUP C_&0 r_ Z I c_mI imm MPR-SAT-FE-69-7 SATURN V LAUNCH VEHICLE FLIGHT EVALUATION REPORT - AS-505 APOLLO I0 MISSION BY Saturn Flight Evaluation Working Group George C. Marshall Space Flight Center ABSTRACT Saturn V AS-505 (Apollo lO Mission) was launched at 12:49:00 Eastern Daylight Time on May 18, 1969, from Kennedy Space Center, Complex 39, Pad B. The vehicle lifted off on schedule on a launch azimuth of 90 degrees east of north and rolled to a fli.ght azimuth of 72.028 degrees east of north. The launch vehicle successfully placed the manned spacecraft in the planned translunar injection coast mode. The S-IVB/IU was placed in a solar orbit with a period of 344.9 days by a combination of continuous LH2 vent, the contingency experiment of propellant lead, a LOX dump and APS ullage burn. The Major Flight Objectiw_s and the Detailed Test Objectives of this mission were completely accomplished. No failures, anomalies, or de- viations occurred that seriously affected the flight or mission. Any questions or comments pertaining to the information contained in this report are invited arid should be directed to: Director, George C. Marshall Space Flight Center Huntsville_, Alabama 35812 Attention: Chairman, Saturn Flight Evaluation Working Group, S&E-CSE-LF (Phone 453-2575) TABLE OF CONTENTS Section Page TABLOEFCONTENTS iii LISTOFILLUSTRATIONS xii LISTOFTABLES xix ACKNOWLEDGEMENT xxiii ABBREVIATIONS xxiv MISSIOPNLAN xxvii FLIGHTTESTSUMMARY xxix 1 INTRODUCTION l.l Purpose I-I 1.2 Scope I-I 2 EVENTTIMES 2,I Summaryof Events 2-I 2.2 Variable Time and CommandedSwitch SelectorEvents 2-3 3 LAUNCHOPERATIONS 3.1 Summary 3-I 3.2 PrelaunchMilestones 3-I 3.3 CountdowEnvents 3-I 3.4 PropellanLtoading 3-I 3.4.1 RP-ILoading 3-I 3.4.2 LOXLoading 3-3 3.4.3 LH2 Loading 3-3 3.4.4 Auxiliary Propulsion System PropellanLtoading 3-3 3.5 S-II Insulation,Purge and Leak Detection 3-3 3.5.1 ForwardBulkheadInsulation 3-3 3.5.2 ForwardBulkheadUninsulatedArea 3-4 3.5.3 LH2 TankSidewall 3-4 iii TABLE OF CONTENTS(CONTINUED) Section Page 3.5.4 Bolting/J-Ring 3-4 3.5.5 FeedlineElbow 3-4 3,5.6 CommoBnulkhead 3-4 3,6 GroundSupport Equipment 3-5 3.6.1 Ground/Vehicle Interface 3-5 3.6.2 MSFC Furnished Ground Support Equipment 3-5 3.6.3 GSECameraCoverage 3-6 4 TRAJECTORY 4.1 Summary 4-I 4.2 Tracking Data Utilization 4-I 4.2.1 Tracking During the Ascent Phase of Flight 4-I 4.2.2 Tracking During Orbital Flight 4-2 4.2.3 Tracking During the Injection Phase of Flight 4-2 4.3 Trajectory Evaluation 4-2 4.3.1 AscentTrajectory 4-2 4.3.2 Parking Orbit Trajectory 4-3 4.3.3 Injection Trajectory 4-5 4.3.4 Post TLI Trajectory 4-6 4.3.5 S-IVB/IU Post Separation Trajectory 4-10 5 S-IC PROPULSION 5.1 Summary 5-I 5.2 S-IC Ignition Transient Performance 5-I 5.3 S-IC Mainstage Performance 5-4 5.4 S-IC Engine Shutdown Transient Performance 5-6 5,5 S-IC Stage Propellant Management 5-6 5.6 S-IC Pressurization Systems 5-6 5.6.1 S-IC Fuel Pressurization System 5-6 5.6.2 S-IC LOXPressurization System 5-7 5.7 S-IC Pneumatic Control Pressure System 5-8 5.8 S-IC PurgeSystems 5-9 5.9 POGOSuppression System 5-9 iv TABLE OF CONTENTS(CONTINUED) Section Page 6 S-II PROPULSION 6.1 Summary 6-I 6.2 S-II Chilldown and Buildup Transient Performance 6-2 6.3 S-II Mainstage Performance 6-5 6.4 S-II Shutdown Transient Performance 6-7 6.5 S-II Stage Propellant Management 6-9 6.6 S-II Pressurization Systems 6-10 6.6.1 S-II Fuel Pressurization System 6-10 6.6.2 S-II LOXPressurization System 6-11 6.7 S-II Pneumatic Control Pressure System 6-11 6.8 S-II Helium Injection System 6-12 7 S-IVB PROPULSION 7.1 Summary 7-I 7.2 S-IVB Chilldown and Buildup Transient Performance for First Burn 7-2 7.3 S-IVB Mainstage Performance for First Burn 7-2 7.4 S-IVB Shutdown Transient Performance for First Burn 7_5 7.5 S-IVB Parking Orbit Coast Phase Conditioning 7-6 7.6 S-IVB Chilldown and Restart for SecondBurn 7-6 7.7 S-IVB Mainstage Performance for SecondBurn 7-12 7.8 S-IVB Shutdown Transient Performance for' SecondBurn 7-14 7.9 S-IVB Stage Propellant Management 7-14 7.10 S-IVB Pressurization System 7-14 7.10.1 S-lVB Fuel Pressurization System 7-14 7.10.2 S-IVB LOXPressurization System 7-18 TABLE OF CONTENTS(CONTINUED) Section Page 7.11 S-IVB Pneumatic Control Pressure System 7-22 7.12 S-IVB Auxiliary Propulsion System 7-26 7.13 S-IVB Propellant Lead Experiment and Orbital Safing Operation 7-27 7.13,1 LOX and LH2 Lead Chilldown Experiment 7-28 7.13.2 LOX Tank Ambient Repressurization 7-31 7.13.3 LH2 Tank Ambient Repressurization 7-32 7.13.4 Fuel TankSafing 7-32 7.13.5 LOXTank Dumpand Safing 7-33 7.13.6 Cold Helium Dump 7-33 7.13.7 Ambient Helium Dump 7-34 7.13.8 Stage Pneumatic Control Sphere Safing 7-35 7.13.9 Engine Start Sphere Safing 7-35 7.13.10 Engine Control Sphere Safing 7-35 8 HYDRAULICSYSTEMS 8.1 Summary 8-I 8,2 S-IC Hydraulic System 8-I 8.3 S-II Hydraulic System 8-I 8.4 S-IVB Hydraulic System (First Burn) 8-I 8.5 S-IVB Hydraulic System (Parking Orbit CoastPhase) 8-2 8.6 S-IVB Hydraulic System (Second Burn) 8-3 8,7 S-IVB Hydraulic System (Translunar Injection Coast and Propellant Dump) 8-3 9 STRUCTURES 9,1 Summary 9-I 9.2 Total Vehicle Structures Evaluation 9-I 9.2.1 Longitudinal Loads 9-I 9,2.2 BendingMoments 9-3 9.2.3 Vehicle Dynamic Characteristics 9-5 9.3 Vibration Evaluation 9-11 9.3.1 S-IC Stage and Engine Evaluation 9-11 9.3.2 S-II Stage and Engine Evaluation 9-12 9.3.3 S-IVB Stage and Engine Evaluation 9-23 vi TABLE OF CONTENTS(CONTINUED) Section Page I0 GUIDANCEANDNAVIGATION ID.1 Sumrmya 1O1- I I0.I.I Flight Program I0-I 10.1.2 Instrument Unit Components I0-I 10.2 GuidanceComparisons I0-I 10.3 Navigation and Guidance Scheme Evaluation 10-7 10.4 Guidance System Component Evaluation 10-8 10.4.1 LVDCPerformance 10-8 10.4.2 LVDAPerformance 10-8 10.4.3 LadderOutputs 10-8 10.4.4 Telemetry Outputs I0-11 10.4.5 Discrete Outputs I0-II 10.4.6 Switch Selector Functions I0-II 10.4.7 ST-124M-3 Inertial Platform Performance 10-I1 11 CONTROLSYSTEM 11.1 Summary 11-I II.2 Control System Description II-I 11.3 S-IC Control System Evaluation 11-2 11.3.1 Liftoff Clearances 11-2 11.3.2 S-IC Flight Dynamics II-2 II.4 S-II Control System Evaluation II-7 II.5 S-IVB Control System Evaluation 11-14 11.5.1 Control System Evaluation During FirstBurn 11-14 II.5.2 Control System Evaluation During ParkingOrbit ll-14 'II.5.3 Control System Evaluation During SecondBurn ll-17 11.5.4 Control System Evaluation After S-IVBSecondBurn ll-18 12 SEPARATION 12.1 Summary 12-I 12.2.1 S-IC RetroMotor Performance 12-1 12.2.2 S-IllUllage Motor Performance 12-I _\ 1122..22.3 SS--IICC//SS--IIII SSetpaagreatSieopnarEavtailounation 1122--I1 _\, vii o_ TABLE OF CONTENTS(CONTINUED) Sectoin Page 12.3 S-II Second Plane Separation Evaluation 12-I 12.4 S-II/S-IVB Separation Evaluation 12-2 12.4.1 S-II Retro Motor Performance 12-2 12.4,2 S-IVB Ullage Motor Performance 12-2 12.4.3 S-II/S-IVB Separation Dynamics 12-2 12.5 S-I VB/IU/LM/CSM Separation Evaluation 12-2 12.6 Lunar Module Docking and Ejection Evaluation 12-2 13 ELECTRICALNETWORKS 13.1 Summary 13-I 13.2 S-IC Stage Electrical System 13-I 13.3 S-II Stage Electrical System 13-2 13.4 S-IVB Stage Electrical System 13-3 13,5 Instrument Unit Electrical System 13-6 14 RANGESAFETY AND COMMANDSYSTEMS 14.1 Summary 14-I 14.2 Secure Range Safety CommandSystems 14-I 14.3 Commandand Communications System 14-I 15 EMERGENCYDETECTIONSYSTEM 15.1 Summary 15-I 15.2 SystemEvaluation 15-I 15.2.1 General Performance 15-I 15.2.2 Propulsion System Sensors 15-I 15,2.3 Flight Dynamics and Control Sensors 15-I 15.2.4 EDSEventTimes 15-2 16 VEHICLE PRESSUREANDACOUSTIC ENVIRONMENT 16.1 Summary 16-I 16.2 Surface Pressures and Compartment Venting 16-I 16.2.1 S-ICStage 16-I 16.2.2 S-II Stage 16-5 viii

Description:
SATURN V LAUNCH VEHICLE FLIGHT EVALUATION REPORT - AS-505. APOLLO I0 MISSION. BY. Saturn. Flight. Evaluation. Working. Group.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.