RELIANCE STATEMENT The purpose of this report and the associated services is to undertake an environmental impact assessment of the proposed Arrow Bowen Pipeline Project (the project) in accordance with the scope of services set out in the contract between Sinclair Knight Merz Pty Ltd (SKM) and Arrow Bowen Pipeline Pty Ltd (Arrow). That scope of services, as described in this report, was developed with the Client. In preparing this report, the following documents have been relied upon, and presumed accurate, any information (or confirmation of the absence thereof) provided. These include, but are not limited to; Environmental Assessment Report (Flora) for the Proposed Arrow Bowen Pipeline (AECOM, 2011). Initial Safety Management Study (GHD, 2011). Arrow Bowen Pipeline Proposed Pipeline Alignment Travelogue (Coffey, 2011). ABP Traffic Impact Assessment (GHD, 2011). Water Crossing Information for the Arrow Bowen Gas Pipeline (AECOM, 2011). ABP Flood Impact Assessment (GHD, 2011). Arrow Energy Major Pipelines Water Availability Study (GHD, 2011). Cultural Heritage Impact Assessment Arrow Bowen Pipeline Environmental Impact Statement CQCHM, 2011). Except as otherwise stated in the report, no attempt has been undertaken to verify the accuracy or completeness of any such information. If the information is subsequently determined to be false, inaccurate or incomplete then it is possible that our observations and conclusions as expressed in this report may change. The data in this report is from data available in the public domain at the time or times outlined in this report. The passage of time, manifestation of latent conditions or impacts of future events may require further examination of the project and subsequent data analysis, and re-evaluation of the data, findings, observations and conclusions expressed in this report. The report has been prepared in accordance with the usual care and thoroughness of the consulting profession, for the sole purpose described above and by reference to applicable standards, guidelines, procedures and practices at the date of issue of this report. For the reasons outlined above, however, no other warranty or guarantee, whether expressed or implied, is made as to the data, observations and findings expressed in this report, to the extent permitted by law. This report should be read in full and no excerpts are to be taken as representative of the findings. No responsibility is accepted by Arrow or SKM for use of any part of this report in any other context. This report has been prepared on behalf of, and for the exclusive use of Arrow, and is subject to, and issued in accordance with, the provisions of the agreement between SKM and Arrow. SKM accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this report by any third party. Arrow Bowen Pipeline Project Environmental Impact Statement Page i Version Purpose of Orig Review Review QA Release Issue Date Document Date Review Approval Rev 0 Draft – DERM review DW/MC GLM 29.11.2011 CB 02.12.2011 02.12.2011 Rev 1 For public comment GLM MC 24.02.2012 DT 01.03.2012 01.03.2012 Disclaimer This document is and shall remain the property of Arrow Bowen Pipeline Pty Ltd. Unauthorised copying or use of this document in any form whatsoever is prohibited. Arrow Bowen Pipeline Project Environmental Impact Statement Page ii Abbreviation / Meaning acronym 4WD 4-wheel drive AADT Average Annual Daily Traffic AASS Actual acid sulfate soils AB Arrow Bowen (mainline) ABS Australian Bureau of Statistics ACH Act Aboriginal Cultural Heritage Act 2003 AGL Australian Gas Light Company AHC Act Australian Heritage Council Act 2003 AHD Australian Height Datum ANZECC Australian and New Zealand Environment Conservation Council ANZIC Australian and New Zealand Standard Industrial Classification APIA Australian Pipeline Industry Association APLNG Australia Pacific LNG ARI Average recurrence interval Arrow Arrow Bowen Pipeline Pty Ltd Arrow Energy Arrow Energy Pty Ltd AS Australian Standard ASP Arrow Surat Pipeline, formerly known as Surat Gas Pipeline (SGP) ASS Acid sulfate soils ATSIHP Act Aboriginal and Torres Strait Islander Heritage Protection Act 1984 BG British Gas BOM Bureau of Meteorology BOP Balance of Payments BPA Biodiversity Planning Assessment BRS Bureau of Rural Sciences CEMP Construction Environmental Management Plan CHIMS Cultural Heritage Information Management System CHMP Cultural Heritage Management Plan CHMS Cultural Heritage Management Strategy CLR Contaminated Land Register CO -e Carbon dioxide equivalent 2 CO Carbon monoxide Coastal Act Coastal Protection and Management Act 1995 CQCHM Central Queensland Cultural Heritage Management Arrow Bowen Pipeline Project Environmental Impact Statement Page iii Abbreviation / Meaning acronym CQP Central Queensland Gas Pipeline CQSS Central Queensland Strategy for Sustainability CQSS2 Central Queensland Strategy for Sustainability – 2004 and Beyond CRL Copper Refineries Pty Ltd CSG Coal Seam Gas CSIRO Commonwealth Scientific and Industrial Research Organisation CSMP Construction Safety Management Plan dB(A) Decibel DCCEE Department of Climate Change and Energy Efficiency DCDB Digital Cadastral Data Base DEEDI Department of Employment, Economic Development and Innovation DEM Digital Elevation Model DEO Desired Environmental Outcome DERM Department of Environment and Resource Management DFE Defined Flood Event DL Dysart Lateral DO Dissolved oxygen DR District Road DSEWPAC Department of Sustainability, Environment, Water, Population and Communities DTMR Department of Transport and Main Roads EA Environmental Authority EEC Endangered Ecological Communities EHMS Environmental, Health and Safety Management System EIN Environmental Improvement Notice EIS Environmental Impact Statement EL Elphinstone Lateral EMP Environmental Management Plan EMR Environmental management register EMS Environmental Management System EO Environmental Officer EP Act Environmental Protection Act 1994 EP Regulation Environmental Protection Regulation 2008 EPBC Act Commonwealth Environment Protection and Biodiversity Conservation Act 1999 EPC Exploration Permit - Coal EPM Exploration Permit – Minerals Arrow Bowen Pipeline Project Environmental Impact Statement Page iv Abbreviation / Meaning acronym EPP Environmental Protection Policy EPP(Air) Environmental Protection (Air) Policy 2008 EPP (Noise) Environmental Protection (Noise) Policy 2008 EPP(Waste) Environmental Protection (Waste Management) Policy 2000 EPP(Water) Environmental Protection (Water) Policy 2009 ERA Environmentally Relevant Activity ERP Emergency Response Plan ESA Environmentally Sensitive Area ESD Ecologically Sustainable Development EVNT Endangered, Vulnerable and Near Threatened FBA Fitzroy Basin Association FIFO Fly-in fly-out FTE Full time equivalent GAWB Gladstone Area Water Board GGH Gladstone Gas Hub GHG Greenhouse gas GIS Geographical Information System GLNG Gladstone Liquefied Natural Gas GQAL Good Quality Agricultural Land GPC Gladstone Port Corporation GPS Global Positioning System GRP Gross Regional Product GSDA Gladstone State Development Area GST Goods and Services Tax GVA Gross Value Added ha hectares HAZOP Hazard and Operability HDD Horizontal Directional Drilling HHMP Historic Heritage Management Plan HSE Health, Safety and Environment IAS Initial Advice Statement ICHA Initial Cultural Heritage Assessment ICHRD Indigenous Cultural Heritage Register and Database ICOMOS International Council on Monuments and Sites IDAS Integrated Development Assessment System IEMS Integrated Environmental Management System Arrow Bowen Pipeline Project Environmental Impact Statement Page v Abbreviation / Meaning acronym ILUA Indigenous Land Use Agreement IO Input-output IP Act Integrated Planning Act 1997 JHA Job Hazard Analysis kL Kilolitre km Kilometre km/h Kilometre per hour KP Kilometre Point kV Kilovolt kVA Kilovolt ampere L Litre Land Act Land Act 1994 LGA Local Government Area LNG Liquefied Natural Gas LoS Level of Service LP Act Land Protection (Pest and Stock Route Management) Act 2002 LP Regulation Land Protection (Pest and Stock Route Management) Regulation 2003 MAOP Maximum Allowable Operating Pressure m Metre m2 Squared metres m3 Cubic metres m/s Metres per second MDL Mineral Development Licence ML Mining Lease or Megalitre mm Millimetres MNES Matters of National Environmental Significance MSDS Material Safety Data Sheet MW Megawatt NC Act Nature Conservation Act 1992 NCR Non-Conformance Report NGA National Greenhouse Accounts NH National Highway NIC Northern Infrastructure Corridor NNTT National Native Title Tribunal NO Nitrogen dioxide NQ Dry Tropics North Queensland Dry Tropics (Land and Water Solutions) Arrow Bowen Pipeline Project Environmental Impact Statement Page vi Abbreviation / Meaning acronym NRM Natural Resource Management NRM Plan Natural Resource Management Plan NT Act Commonwealth Native Title Act 1993 NTDA Native Title Determination Application ntu Nephelometric Turbidity Units NWQMS National Water Quality Management Strategy OESR Office of Economic and Statistical Research OH&S Occupational Health and Safety P&G Act Petroleum and Gas (Production and Safety) Act 2004 PASS Potential acid sulfate soils PCHA Post-Construction Heritage Agreement PL Petroleum Lease PM Particulate matter (up to 2.5 micrometers in size) 2.5 PM Particulate matter (up to 10 micrometers in size) 10 PMAV Property Map of Assessable Vegetation PNG Papua New Guinea PPE Personal protective equipment PPL Petroleum Pipeline Licence PSL Petroleum Survey Licence QFRS Queensland Fire and Rescue Service QGC Queensland Gas Company QGEOP Queensland Government Environmental Offset Policy QH Act Queensland Heritage Act 1992 QHR Queensland Heritage Register QLUMP Queensland Land Use Mapping Program QNI Queensland Nickel Industry Pty Ltd QWQG Queensland Water Quality Guidelines 2009 RE Regional Ecosystem ROP Resource Operations Plan ROW Right of Way RPD Real Property Description RR Regional Road SCL Strategic Cropping Land SCP Stakeholder Consultation Plan SCR State Controlled Road SDA State Development Area Arrow Bowen Pipeline Project Environmental Impact Statement Page vii Abbreviation / Meaning acronym SDPWO Act State Development and Public Works Organisation Act 1971 SGIC Stanwell-Gladstone Infrastructure Corridor SGP Surat Gladstone Pipeline, now known as ASP Shell Royal Dutch Shell plc SIA Social Impact Assessment SIMP Social Impact Management Plan SL Saraji Lateral SLA Statistical Local Area SMS Safety Management Study SP Act Sustainable Planning Act 2009 SP Regulation Sustainable Planning Regulation 2009 SPP State Planning Policy SRTM Shuttle Radar Topographic Mission SSR State Strategic Road t Tonnes TCP Transport Coordination Plan for Queensland 2008 TI Act Transport Infrastructure Act 1994 TIA Traffic Impact Assessment TMP Traffic Management Plan TO Act Transport Operations (Road Use Management) Act 1995 TOR Terms of Reference TP&C Act Transport Planning and Coordination Act 1994 UHF Ultra-high frequency UV Ultraviolet UXO Unexploded ordnance VHF Very high frequency VM Act Vegetation Management Act 1999 vpd Vehicles per day vph Vehicles per hour WMP Waste Management Plan WONS Weeds of National Significance WRP Water Resource Plan Arrow Bowen Pipeline Project Environmental Impact Statement Page viii Term Definition Ambient Surrounding or background. Ambient noise The sum of the noise from all sources, near and far, in a given environment. Anthropogenic Caused by humans or human activity. Annual Return An annual return is a report that describes environmental management activities at the project site for the previous 12 months. Refer to the fact sheet Annual Return and Fee – Mining, Gas and Petroleum (Level 2), November 2010. ANZECC/ The Australian and New Zealand Environment and Conservation Council and the Agriculture and Resource Management Council of Australia and ARMCANZ New Zealand. Aquifer Rock or sediment in a formation, group of formations or part of a formation that is saturated and sufficiently permeable to transmit economic quantities of water to wells and springs. Aquitard A bed of low permeability along an aquifer. Amenity A feature that increases attractiveness or value, especially of a piece of real estate or a geographic location. Anabranch A stream that branches from a main river then reunites with it. Average Minimum Assessed as the background noise level per standard time interval that Background Noise was exceeded for ninety per cent of the interval, defined in AS1055 as the Level rating background noise level. A-weighted Filtering a sound level so that a microphone output approximates the frequency response of a human ear to the sound. Background noise The noise ordinarily present and continuous at a given location, excluding extraneous noise and the noise source of interest. Commonly measured using the statistical parameter, LA90, the A-weighted noise level that was exceeded for ninety per cent of the monitoring period. Biodiversity The variety of all life forms on earth – the different plants, animals and micro-organisms, their genes, and the terrestrial, marine and freshwater ecosystems of which they are a part.. Bioregion Bioregions are large, geographically distinct areas of land with common characteristics such as geology, landform patterns, climate, ecological features and plant and animal communities. Blasting An action using or detonating explosives that may emit a loud, intense sound. Building and The policy requires that a minimum of 10 per cent of the total labour hours Construction on any Queensland Government building or civil construction project Contracts Structured (valued over $250,000 for building or $500,000 for civil construction) must Training Policy (10 be undertaken by Indigenous workers, apprentices, trainees or cadets or per cent training used for the upskilling of existing employees (to a maximum of 25 per cent policy) of the deemed hours). Bund An embankment constructed around an area to prevent the inflow or outflow of liquids. Also called Bunding. Catchment A water intake area or all parts of a drainage basin. Arrow Bowen Pipeline Project Environmental Impact Statement Page ix
Description: