ebook img

the study on integrated water resources management for poverty alleviation and economic ... PDF

316 Pages·2011·2.58 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview the study on integrated water resources management for poverty alleviation and economic ...

NATIONAL WATER RESOURCES BOARD THE REPUBLIC OF THE PHILIPPINES THE STUDY ON INTEGRATED WATER RESOURCES MANAGEMENT FOR POVERTY ALLEVIATION AND ECONOMIC DEVELOPMENT IN THE PAMPANGA RIVER BASIN IN THE REPUBLIC OF THE PHILIPPINES FINAL REPORT VOLUME IV: SUPPORTING REPORTS JANUARY 2011 JAPAN INTERNATIONAL COOPERATION AGENCY CTI ENGINEERING INTERNATIONAL CO., LTD. in association with NIPPON KOEI CO., LTD. Composition of Final Report Volume I: Summary Volume II: Main Report Volume III: Supporting Reports Sector A: Topography and Meteo-Hydrology Sector B: Socio-Economy Sector C: Agricultural and Fishery Water Management Sector D: Municipal Water Supply, Sanitation and Sewerage System Management Sector E: Flood and Sediment Disaster Management Sector F: Water-related Environmental Management Sector G: Watershed Management Sector H: Water Resources Development and Management Volume IV: Supporting Reports Sector I: Socio-Environmental Consideration Sector J: Guideline for Formulation of IWRM Plan Sector K: Formulation of IWRM Plan Sector L: Plans for Legal and Institutional Framework Sector M: Water-related Data Management Appendix: Minutes and Discussion Records on SC, TWG and Stakeholder Meetings Exchange Rate used in the Report is: PHP 1.00 = US$ 0.0217 = JP¥ 1.934 US$ 1.00 = PhP 46.15 = JP¥ 89.25 (as of 31st December 2009) Sector I Environmental and Social Considerations on Programs and Projects of IWRM Plan Sector I. Environmental and Social Considerations on Programs and Projects of IWRM Plan Table of Contents Pages I.1 Introduction ............................................................................................................................. I-1 I.2 Existing Legislation and Legal Systems governing Environmental and Social Consideration in Philippines ............................................................................................. I-2 I.2.1 Current Overall Legal Framework .......................................................................... I-2 I.2.1.1 Environmental Impact Statement System, Presidential Decree No. 1586 (1978) .......................................................................................................... I-2 I.2.1.2 Presidential Proclamation No. 2146 (1981) and No. 803(1996) ................. I-2 I.2.1.3 DENR Administrative Order No. 30 Series of 2003 (DAO 03-30), Revised Procedural Manual (2007) ............................................................. I-2 I.2.1.4 Recent Issued Memorandum Circulars (MCs) Relevant to PEISS .............. I-2 I.2.2 Procedures of Environmental Impact Assessment (EIA) ........................................ I-2 I.2.2.1 Projects Covered by PEISS ......................................................................... I-3 I.2.2.2 Responsible Government Institutions for PEISS ......................................... I-5 I.2.2.3 Required Documents by PEISS ................................................................... I-5 I.2.2.4 Outlines of Required Documents by PEISS ................................................ I-7 I.2.2.5 Public Participation in EIA Process ........................................................... I-15 I.2.3 Laws, Regulations and Guidelines Concerning Land Acquisition and Involuntary Resettlement ...................................................................................... I-16 I.2.3.1 Guidelines for the Acquisition of Certain Parcels of Private Land Intended for Public Use Including the Right-of-Way Easement of Several Public Infrastructure Projects, Administrative Order No. 50 (1999) ........................................................................................................ I-16 I.2.3.2 An Act to Facilitate the Acquisition of Right-of-Way, Site or Location for National Government Infrastructure Projects and for other Purposes, Republic Act 8974 (2000).......................................................................... I-16 I.2.3.3 The Agricultural Land Reform Code, Republic Act 6389 (1971) ............. I-16 I.2.3.4 Executive Order 1035 (1985) .................................................................... I-16 I.2.3.5 Presidential Decree No. 1533 (1978) ........................................................ I-16 I.2.3.6 Urban Development and Housing Act, Republic Act 7279 (1992) ........... I-16 I.2.3.7 Instituting the National Drive to Suppress and eradicate Professional Squatters and Squatting Syndicates, Executive Order No.153 (1999) ...... I-17 I.2.3.8 Executive order No.228 (1987) ................................................................. I-17 I.2.3.9 Relevant Guidelines ................................................................................... I-17 I.2.4 Laws and Regulations Concerning the Environmental Standards and Social Aspects .................................................................................................................. I-17 I.2.4.1 Environment Code, Presidential Decree No. 1152 .................................... I-17 I.2.4.2 Water Code, Presidential Decree No. 1067 ............................................... I-17 I.2.4.3 Clean Water Act, Republic Act 9275 ......................................................... I-17 I.2.4.4 Clean Air Act of 1999, Republic Act No. 8749 ......................................... I-17 I.2.4.5 Ecological Solid Waste Management Act, Republic Act No. 9003 (2000) ........................................................................................................ I-18 i I.2.4.6 Pollution Control Law, Presidential Decree No. 984 ................................ I-18 I.2.4.7 Forestry Reform Code, Presidential Decree No. 705 ................................ I-18 I.2.4.8 National Integrated Protected Areas System (NIPAS), Republic Act No. 7586 ........................................................................................................... I-18 I.2.4.9 Indigenous Peoples Rights Act, Republic Act No. 8731 ........................... I-18 I.3 Preliminary Evaluation of Potential Environmental and Social Impacts ........................ I-19 I.3.1 Outline of the Programs and Projects in IWRM Plan ........................................... I-19 I.3.2 Identification of the Projects covered by PEISS ................................................... I-19 I.3.3 Alternative Options for the Conceptual Projects Categorized as Environmentally Critical Project under PEISS ..................................................... I-20 I.3.4 Screening and Scoping of the Programs and Projects based on the JICA Guidelines for Environmental and Social Considerations .................................... I-21 I.3.5 Result of Initial Screening and Scoping of the Programs and Projects in IWRM Plan ....................................................................................................................... I-21 I.3.6 Scoping Results and Proposed Mitigation Measures ............................................ I-21 I.3.5 Result of Initial Screening and Scoping of the Programs and Projects in IWRM Plan ....................................................................................................................... I-21 I.3.6 Scoping Results and Proposed Mitigation Measures ............................................ I-22 I.3.6.1 Significant adverse impacts (A-) ............................................................... I-22 I.3.6.2 Less significant adverse impacts (B-) ........................................................ I-23 I.4 Identification of the necessary monitoring items during the project cycles ..................... I-27 I.4.1 Construction phase ................................................................................................ I-27 I.4.2 Operation phase .................................................................................................... I-27 I.4.3 Throughout the project cycles ............................................................................... I-28 I.5 Important Notice on Implementation of the Projects ........................................................ I-29 List of Tables List of Tables in Report Table I.2.2.1 Summary of Environmentally Critical Projects (ECPs) ........................................ I-4 Table I.2.2.2 Summary of Environmentally Critical Areas (ECAs) ............................................ I-4 Table I. 2.2.3 Project Groups for EIA under PEISS ..................................................................... I-5 Table I. 2.2.4 Summary of Project Groups, EIA Report Types, Decision Documents, Deciding Authorities and Processing Duration ...................................................... I-7 Table I. 3.1.1 Number of Proposed and Conceptual Projects under IWRM Plan ...................... I-19 Table I. 3.2.1 Proposed and Conceptual Programs and Projects in IWRM Plan Covered by PEISS ................................................................................................................... I-19 Table I. 3.3.1 Alternative Options for Conceptual Projects Categorized as Environmentally Critical Projects ................................................................... I-20 Table I. 3.4.1 Proposed and Conceptual Programs and Project in IWRM Plan with Possible Negative Environment Impacts Identified in Initial Screening Process .............. I-22 Table I. 3.4.2 Details, Timing of Occurrence and Mitigation Measures for Significant Adverse Impacts (A-) ........................................................................................... I-23 Table I. 3.4.3 Details, Timing of Occurrence and Mitigation Measures for Less Significant Adverse Impacts (B-) ........................................................................................... I-23 ii Table I. 3.5.1 Recommended Monitoring Measures of Environmental Parameters at Construction Phase .............................................................................................. I-27 Table I. 3.5.2 Recommended Monitoring Measures of Environmental Parameters at Operation Phase ................................................................................................... I-28 List of Annex Tables Annex-T I.2.2.1 Project Grouping Matrix for Determination of EIA Report Types for New Single & Co-Located Projects ............................................................. IT-1 Annex-T I.2.2.2 Project Grouping Matrix for Determination of EIA Report Types for New Single Co-Located Projects ................................................................. IT-3 Annex-T I.3.1.1 Outlines of Proposed and Conceptual Projects and Programs of IWRM Plan ................................................................................................ IT-18 Annex-T I.3.4.1 Summary of Environmental Scoping for Projects and Programs of IWRM Plan ................................................................................................ IT-25 List of Figures List of Figures in Report Figure I. 2.2.1 Summary Flowchart of EIA Process ...................................................................... I-3 List of Annex Figures Annex-F I.2.2.1 Potential ECAs in Region III ...................................................................... IF-1 Annex-F I.2.2.2 Organization chart of DENR ...................................................................... IF-2 Annex-F I.2.2.3 Organization chart of EMB ......................................................................... IF-3 iii Sector I: Environmental and Social Considerations on Programs and Projects of the IWRM Plan Sector I. Environmental and Social Considerations on Programs and Projects of the IWRM Plan I.1 Introduction The IWRM Plan prepared during the present study is consist of six (6) sectors including 18 proposed and 30 conceptual programs and projects1, which cover multi-sectoral fields, such as agricultural and irrigation development, municipality water supply, sanitation, sewerage, flood and disaster management, watershed management, water related environment management, and water resource management to support the Government of Philippines in managing water resources in a sustainable manner. In order to assess if the implementation of any of the proposed programs and projects would create any adverse impacts on natural and social environments in the localities, the Study Team conducted a simple initial environmental examination (IEE) of the proposed projects by using screening and scoping methods. In addition, the present legislative and institutional framework governing environmental assessment in the country was also reviewed. The results of the simple IEE are summarized in the following sections. 1 The proposed programs and projects are planned by the relevant government agency, while the conceptual programs and projects are proposed by the Study Team and subjects for further revision to determine the project components. Basically, the programs and projects in the IWRM Plan have been prepared in consultation with the stakeholders in the course of the Study. I-1 Sector I: Environmental and Social Considerations on Programs and Projects of the IWRM Plan I.2 Existing Legislation and Legal Systems governing Environmental and Social Consideration in Philippines I.2.1 Current Overall Legal Framework In Philippines, any private or public projects or activities which are envisaged to have a negative impact on the environment are subjects of Environmental Impact Assessment (EIA) by Philippine Environmental Impact Statement System (PEISS). EIA is the preliminary analysis of the potential impacts of the project on the environment. Aware of the possible negative effects of the implementation of industrial and other activities, the government had instituted measures to encourage the use of EIA as a planning and decision making tool. PEISS is a set of laws, regulations, administrative orders and guidelines for EIA. Among them some of the most important laws and guidelines are listed below. I.2.1.1 Environmental Impact Statement System, Presidential Decree No. 1586 (1978) An act establishing and centralizing the Environmental Impact Statement (EIS) System under the National Environmental Protection Council (NEPC), which merged with the National Pollution Control Commission (NPCC) in June 1987 to become the Environmental Management Bureau (EMB). I.2.1.2 Presidential Proclamation No. 2146 (1981) and No. 803(1996) It proclaims Environmentally Critical Projects (ECPs) to have significant impacts on the quality of the environment and Environmentally Critical Areas (ECAs) as environmentally fragile areas within the scope of the EIS System. I.2.1.3 DENR Administrative Order No. 30 Series of 2003 (DAO 03-30), Revised Procedural Manual (2007) It provides implementing rules and regulations of Presidential Decree No. 1586, establishing the Philippine Environmental Impact Statement System (PEISS). Also, detailed information in definitions of technical terms, procedures, related laws and regulations are described. I.2.1.4 Recent Issued Memorandum Circulars (MCs) Relevant to PEISS (1) MC No. 2010-14, Standardization of Requirements and Enhancement of Public Participation in the Streamlined Implementation of the Philippine EIS System It prescribes streamlined procedures of PEISS, especially for application of ECC (Environmental Compliance Certificate) and CNC (Certificate of Non-Coverage) with the outlines of the relevant EIA reports and CNC application form required. (2) MC No. 2010-002, Clarification to DENR MC No.2010-14 and Other EIS System Policy Issuances It clarifies the outlines of EIA reports described in MC No.2010-14 for the relevant report types defined by DAO 03-30 Revised Procedural Manual as well as exemption of the certain projects from securing ECC regardless their location. I.2.2 Procedures of Environmental Impact Assessment (EIA) The procedures of EIA can be grouped into; pre-study stage (screening and scoping), EIA study stage and the post-study stage (review, decision-making and monitoring) as shown in the following diagram. I-2

Description:
DENR Administrative Order No. 30 Series of 2003 (DAO 03-30), Revised Procedural. Manual (2007). It provides implementing rules and regulations of Presidential Decree No. 1586, establishing the. Philippine Environmental Impact Statement System (PEISS). Also, detailed information in definitions.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.