Contemporary Urban Affairs 2019, Volume 3, Number 2, pages 114– 123 The Coordination of Actors in Urban Regeneration Projects: Fikirtepe, Istanbul, Turkey * Ph.D. candidate TUBA SARI HAKSEVER1, Dr. CANDAN ÇINAR ÇITAK2 1 & 2 Yildiz Technical University, İstanbul, Turkey 1E mail: [email protected] and 2E mail: [email protected] A R T I C L E I N F O: A B S T R A C T Article history: It is necessary for urban regeneration projects to be carried out successfully Received 16 April 2018 in coordination with other actors. During the process of realising Accepted 23 May 2018 regeneration, many actors and stategically-given decision plays a crucial Available online 12 October 2018 role. The ways how actors/factors are involved in the process, the relationships founded among them and investigating the methods followed Keywords: during the process constitute the content of this study. The purpose of this Fikirtepe; study is to develop an approach with regard to the coordination establised Urban Regeneration; between actors/factors participated during the regeneration process. This Actors; Partnerships study covers the regeneration activities realised in Fikirtepe and its surrounding area, and it aims to solve the relationships among the actors during the time of planning and applications by using semi-structured technique, one of the qualitative research methods, and detailed interviews. Thanks to the data gained from the detailed interviews effectiveness of the actors has been determined. By the help of the findings obtained from Fikirtepe region, the relationships and coordination among the actors has This work is licensed under a been revealed and a new approach has been created (and suggested) Creative Commons Attribution concerning the effectiveness and coordination. - NonCommercial - NoDerivs 4.0. "CC-BY-NC-ND" CONTEMPORARY URBAN AFFAIRS (2019), 3(2), 44-52. https://doi.org/10.25034/ijcua.2018.4708 www.ijcua.com Copyright © 2018 Contemporary Urban Affairs. All rights reserved. In our country, the issue of urban transformation 1. Introduction has become one of the most discussed and The concept of urban transformation have disputed topic with the problems of emerged with the interventions made to urbanization and settlement that became regenerate the areas that had collapsed both more visible specifically following the in social and economic terms. These catastrophes in 1999 Marmara and Düzce interventions were generally in the form of earthquakes. (Kalağan and Çiftçi, 2012). implementation of projects that will contribute to the economic development of the city in *Corresponding Author: housing zones, old vacant ports and industrial Yildiz Technical University, İstanbul, Turkey zones where the population decline was E-mail address: [email protected] observed or where low income groups live under poor economical and physical conditions (Ataöv and Osmay, 2007). JOURNAL OF CONTEMPORARY URBAN AFFAIRS, 3(2), 114-123 / 2019 When we take a look at the path of 1. It's objective is to change the nature of transformation in Turkey and legislative an area (space) and to involve the residents of regulations made in parallel with this we see the area and the other actors who have a say that urban transformation is defined as in the future of that area. 'regeneration' but with the applications seen in 2. It covers various objectives and time, the concept varied within itself and activities that intersects with basic functional gained new dimensions. In order to have responsibilities of the state depending on successful outcomes in urban transformation specific problems and potential of the area. projects, it is necessary to carry out the 3. Special corporate structure of this transformation in a coordinated manner with partnership may change however it includes a all stakeholders. Multiple actors from local structure that generally works among different government to centralized management, and stakeholders. strategic decisions have a role in the Urban transformation practices now have a transformation process. The approaches that multi-actor structure different than the previous these actors bring in throughout the urban years. It is a multi-dimensional action process transformation process, their relations and where a wide range of actors act together, partnerships are the topics explored in this rather than the applications involving only the study. public or private sector. The tree basic To analyze the relations of the actors in elements referred above can be listed as planning and implementation processes of the engagement, roles and responsibilities of the urban transformation projects carried out in the public and partnerships. study area, Fikirtepe neighborhood and its vicinity, in-depth interviews were made using 2.2. Actors, Associations And Engagements In one of the qualitative research methods, the The Urban Transformation semi-structured interview technique. Multi-actor Main actors involved in the urban structure of the transformation projects in and transformation process are the public sector around Fikirtepe makes it possible to determine (centralized and local government), private urban transformation actors and the way sector, local residents, voluntary sector and actors are included in the process and to map other relevant groups (Turok 2005, Mccarthy the relations of these actors. 2005). The members of the parties of the urban transformation projects, their qualities, 2. Literature Review quantities may vary according to the quality of 2.1. Definition and Sacope of Urban the transformation project, the objectives, Transformation spatial scale (approach for districts or the entire Urban transformation is defined as city) and may shape according to the purpose comprehensive vision and action which leads of transformation and other conditions ( Turok, to the resolution of urban problems and which 2005). The term "partnership" that emerged seeks to bring about a lasting improvement in according to the agreement reached as the economic, physical, social and environmental result of political interests in UK draws the conditions of an area that has been subject to conclusion that a closer bond between the change (Roberts/Sykes 2000). Urban area that public and private sector and direct undergoes a change may be a historical engagement of the local communities are settlement, an industrial zone that lost its required (Mccarthy, 2005). function or a housing zone with a lot of social Basically four main reasons stand out in and location related problems. The process response to the question why partnerships are that involves interventions made to required: first of all a multi-actor partnership is economically, socially and physically resolve able to cover all aspects of the problem. This the problems of the region is generally referred will help an efficient and fair distribution of the to as "urban transformation". An urban funding where all sectors are engaged, which transformation project should be based on makes it the second reason of the partnership detailed analysis of urban area's condition and approach. And third of all, vertical and effort should be made to reach an agreement horizontal engagement of all actors and with best possible engagement and organizations results with coordination of cooperation of all related stakeholders in activities, funds and efforts planned for the regeneration of the area (Roberts / Sykes 2000). same purpose. The fourth reason is to ensure, In its UK experience, Turok (2005) associates contrary to the top-to-bottom centralization urban transformation concept with three basic approach, the engagement of the local attributes. community with a more extensive role, since it Tuba Sari Haksever, Candan Çinar Çitak 115 JOURNAL OF CONTEMPORARY URBAN AFFAIRS, 3(2), 114-123 / 2019 is the most affected party from the order to have a long-term transformation, the transformation. Partnerships made in the urban residents who live in the area must own the transformation with engagement of actors and process and engagement of the local large-scale engagement of actors that work in community must be ensured in order to win coordination, in an integrated way, by creating trust of the resident of the area. financial resources and versatile strategies in 4) Voluntary agencies are extensive in order to resolve the multi-dimensional and content and functional terms, and they are complex structure of urban problems play an formed of civil society structures who play the important role in urban transformation efforts. role of independently handling the non-profit The partnership is formed with both the organizations, voluntary organizations like organizational structure and the structure foundations and groups that provide funds to created to set policies and the actors that the society and various issues of the community enable achieving the common targets. Based and enlighten the public. (Turok, 2005). on this, to begin with it is necessary to define Efficient urban transformation should be based the roles of the actors that stand out in urban on engagement and cooperation of numerous transformation processes (Beswick, 2001). actors and stakeholders including local 1) Public sector; In the transformation municipalities, states, national governments, efforts, there is a strong public sector landowners, investors and corporations and engagement that is managed by relevant organizations at all levels. The idea behind the public institutions. It is composed of local partnership is that it gathers together different authorities (generally the representatives of actors and participants in the urban various units), economic development transformation process in order to create a institutions, university and colleges, synergic effect. In its widest sense, a representatives of regional and national partnership can be defined as a coalition of administrations depending on the targets set. interest regulated officially, which includes (Turok, 2005). Beswick (2001). Beswick suggest actors from different sectors (public and that the public sector, which we can define as private) and which creates a common policy the fundamental actor of the urban and common agenda and action plan (Lang transformation process, generally leads the 2005). urban transformation projects with its As urban problems have a multi-dimensional supervisory and regulatory role in this and complex nature, it may help coordinating partnership process. Another important partnership activities and exceeding beyond function of the public sector is its ability to boundaries of traditional policies (Roberts/Sykes minimize the private sector risks by making the 2000). Partnerships for urban regeneration is spatial planning of the area and generating based on risk sharing by transferring the liability information about political requirements in the of the public sector to private sector (Davies area (Mccarthy, 2005). It is one of the most 2004). In the urban transformation process, important qualities that enables the private mainly three types of public-private sector sector to be part of the transformation process. partnership interventions are cited (Split, 2005): (Özden, 2008). Public sector managed leadership model: This 2) The most important quality of the model is composed of political actors and private sector and what sets it apart from the planning experts in the government and local public sector is its fast operation power, design governments. It is the model where the most skills and professionalism, which improves the authoritarian interventions take place in the quality of urban transformation. Private sector urban transformation process both in looking for attractive opportunities to operational and spatial terms. undertake urban transformation activities, In the public sector managed leadership usually pays attention to the physical and model, basically the public sector provides economic aspects of the transformation work regulative scope in the decision process, to be carried out. The biggest contribution of develops corporate/legal frames regarding private sector to urban transformation efforts is incentives and restrictions and this way the about resources and areas of expertise. public interest is maximized. (Alp, 2012) 3) Local actors are individuals like residents It is the type of cooperation formed generally in the area who will be directly affected from by the centralized government and local the project, members of social groups and municipality, and sometimes by more than one large landowners. Turok (2005) stated that local municipality. In this model, municipalities act as engagement may be easier in urban entrepreneurs in regards to land services. transformation projects with a social aspect. In Private sector does not have a very extensive Tuba Sari Haksever, Candan Çinar Çitak 116 JOURNAL OF CONTEMPORARY URBAN AFFAIRS, 3(2), 114-123 / 2019 role in this partnership structure it only carries structural transformations in the rural areas (Isik, out some construction works on contractual 2005). and commission basis. In short, municipalities In Turkey, partnerships made with private sector have the total control and power in this are mostly seen in areas where the land value process (Split, 2004). is high. Today, metropolitan cities where the real estate market is highly active have Public-private sector partnership model: Public- become the center of attraction for investors. private sector partnerships have emerged as a Transformation projects carried out at areas partnership model that followed the where the land value is high, appear before us privatization policies in 1980s and found itself as projects that are self-financing and that can an execution area very rapidly. The objective generate profit with the development rights of this application is to meet the housing needs and functions of use that are changing. by making use of public lands and taking It is seen that organization among actor groups advantage of the private sector experiences. and form of relations develop and become Public private sector partnership model is different within the scope of unforeseen composed of actors from both sectors and problems. Public sector that is much superior in semi-public representatives. It is considered as legal terms due to the powers it possesses, the most efficient, productive and balanced requires the experience of the private sector in partnership model in the urban transformation issues like workforce and organization and two process. In this type of partnership model, sectors complement one another and speed actors form sector-based partnership coalitions up the projects. However planning and and develop regeneration strategies specific managing this relation accurately is the most to the process. In this type of partnership important criteria for successful completion of a models, actors form sector-based partnership transformation project. coalitions and develop required regeneration Urban transformation model organized by strategies (Alp, 2012). Ministry of Environment and Urbanization at General characteristic of this type of Fikirtepe and its vicinity reveals out that the partnership model may be defined as having partnership structure between the private and the strong financial means of the private sector public sector has not been fully developed yet, and the efficient function of public sector, the project process was not planned which is guidance and regulation (as required). accurately with decisions reached throughout What sets this type of partnership apart from the process, and the parties continue to find the others is that the cooperation with private the accurate execution by trying to sector continues not only on the construction understand the problems encountered in phase but also throughout the operation phase implementation and reaching new decisions. and a construction and operational Urban transformation project for Fikirtepe and partnership is formed with the private sector its vicinity is analyzed by breaking it down to (Split, 2004). stages in order to understand which roles the public, private, and civil sector and local Private sector-managed leadership model; are community actors should play in which stages composed of investors in private sector, land of an urban transformation project. owners and/or semi-public representatives. This model is dissimilar to all other models in the 3.1 Site urban transformation project as the most liberal Fikirtepe is located at Anatolian side of Istanbul, type of strategies both on operational and at the center of Kadikoy country, at the point spatial level are developed with this model of intersection of Bosporus Bridge and D-100 (Alp, 2012). highway and is very close to TEM access roads. Also it is easily accessible with public 3. Case Study transportation. Despite its central position, we When we analyze the development of can say that it is a shanty settlement made up urbanization movements in Turkey, we may of unplanned structures deviating from public divide it into two periods: before and after housing laws, its population is high, level of 1950. Country's urban population that income and life quality is low and it is deprived demonstrated a very slow increase until 1950 of municipal services. Buildings are generally (with its own dynamics) has entered a stage of old, two and three story buildings without very rapid increase after this date as the result construction permit. Project site is defined as of the immigration to the cities arising from the special project site under 1/5000 master plan Tuba Sari Haksever, Candan Çinar Çitak 117 JOURNAL OF CONTEMPORARY URBAN AFFAIRS, 3(2), 114-123 / 2019 and is declared as an urban transformation site parts into ownerships with larger parts. The plan by the Istanbul Metropolitan Municipality. allows individual settlements as well. However the main approach of the plan is to realize structural regeneration and transformation in line with granting extensive development rights by expanding the parcels. It is believed that when development rights are granted to larger parcels, title holders will start to merge and eventually a structural transformation will start. As the new master plan grants the structures in the form of city blocks, the right to use 100% additional floor area ratio, a lot of construction companies tried to make agreements with the local community on flat for land basis and tried to collect parcels to Figure 1: The location of Fikirtepe in Istanbul form a city block. Construction companies that made an agreement with the land owners on flat for land basis, are giving the land owners Fikirtepe, elected as the study site was used as flats under the new project according to a picnic area until 1950s and after that square meter of their lands, and the companies unplanned urbanization occurred due to also cover their rental fees until the end of the immigration after 1950s and in 1970s, the project and pay their moving in costs. number of this unplanned structures increased and due to expansion of the city, the area is no in a central location and became a topic on the agenda of urban transformation process. This project has a special spot among transformation projects being carried out in Istanbul both due to its scale and the new transformation approach envisaged. Fikirtepe area is composed of 60 city blocks. Each one of these blocks with an approximate area of 20 decare have 100-120 parcels and houses 300-400 households. With the new master plan, the structures in the form of city Figure 2: Current Structure in Fikirtepe blocks are granted the right to use 100% additional floor area ratio, and the objective was to follow a gradual construction system and to turn the ownerships formed of very small Figure 3: The Structure in Fikirtepe following transformation Tuba Sari Haksever, Candan Çinar Çitak 118 JOURNAL OF CONTEMPORARY URBAN AFFAIRS, 3(2), 114-123 / 2019 Fikirtepe and its vicinity is explored in 3 phases transformation process: in terms of efficiency of the actors in the Table 1: Fikirtepe Urban Transformation Process Fikirtepe Urban Transformation Process Stage Actors 22.02.2011 Implementary Development 1st Stage Isyanbul Metropolitan Municipality- Plan 2011-2013 Kadiköy Municipality Ministry Of Environment And 2nd Stage Urbanization- 2013-2016 28.02.2013 Cancellation Of Plan Istanbul Metropolitan Municipality 3rd Stage Ministry Of Environment And Urbanization 28.12.2016 Plan Note Amendment 2016-2018 1. Stage: 2011-2013; The period from the To begin with, documentations regarding time the transformation process was initiated Fikirtepe Urban Transformation project were by Istanbul Metropolitan Municipality with the examined in-depth by taking into consideration cooperation of Kadikoy Municipality until the the roles, responsibilities and perspectives of Ministry of Environment and Urbanization various stakeholders. Then in order to analyze declared the area as risky in 2013, the approach of the stakeholders to the 2. Stage: 2013-2016; The period until partnerships and the transformation process, Ministry of Environment and Urbanization has from the perspective of engagement, been authorized as the sole authority of the interviews that were semi-structured as 3 stages new process that was initiated by Istanbul were made from 2016 to 2018 with 45 actors Metropolitan Municipality and Ministry of who were directly or indirectly involved in the Environment and Urbanization, the public project. authorities for the area that had been The interview questions were envisaged to declared as risky, underline any challenges that had been 3. Stage: 2016-2018; The new process encountered to date, to discuss the ways to initiated with the partnership of Ministry of resolve these and to examine the strategies for Environment and Urbanization and Kiptas and facilitating engagement and partnerships of Ilbank; the private and public sector. 4. Methodology 5. Findings In this study, in order to accomplish the Different options of implementation for the objectives of the study, semi-structured face-to- transformation envisaged under Fikirtepe face interviews were made with the actors Implementary Development Plan and project playing a role in the urban transformation implementation methods that require process at Fikirtepe and its vicinity. Separate arrangements like increase of floor area ratio forms were issued depending on the depending on parcel combinations etc. had participants and actor groups interviewed. caused the implementation process of the plan Semi-structured in-depth interviews were made to differ from the implementation processes with the actors at determined stages and that were carried out until then. Many title questions and answer method is used in the holders in the area preferred to unite their process. parcels with the other title holders, instead of In this study, as the determinative feature of the acting individually, in order to benefit from the qualitative researches is to discover the highest floor area ratio granted to city blocks perspectives of the persons interviewed with, in under the plan. order to explain the process that took place in the area and to understand the actors and 5.1 First Stage relations, semi-structured interview technique Within the scope of the study regarding the composed of open and closed end questions transformation process, 1st stage starts upon was used as the data collection method. approval of the 1/1000 scale plan by Istanbul Accordingly stages and actors were Metropolitan Municipality in 2011. As the actor determined. Afterwards in-depth interviews that started the Urban Transformation Process, were analyzed with the help of these stages IBB followed the strategy of monitoring the and titles. Tuba Sari Haksever, Candan Çinar Çitak 119 JOURNAL OF CONTEMPORARY URBAN AFFAIRS, 3(2), 114-123 / 2019 process rather than being involved in the Environment and Urbanization started to process. At the beginning IBB had the authority manage the process as the sole actor at the to make the planning required to resolve the beginning. Then the plan was amended and problems in the area but later it refrained from the Ministry shared this authority with being part of the implementation process. At Metropolitan Municipality. Due to problems like that stage, Istanbul Metropolitan Municipality urban and social reinforcement areas not who was the only authority under the plan, did being sufficient, sustainability of reinforcement not take part in the process and land areas not being maintained as spatial acquisitions were made based on the distribution of reinforcement areas to be contracts made between the title holders and acquired from the areas to be assigned to the investors. public, is not configured with a holistic The people interviewed stated that major approach, and the administration to whom the challenges were experienced at this stage as reinforcement areas will be assigned to not the floor area ratio determined was high and being clear, it was decided to increase the as the agreements were being made between ratio of the reinforcement area to be assigned the title holders and the contractors, and they to the public from 20% to 25% and to assign said “contractors should be inspecting the these areas to the treasury. process, the local community incurs loss as the Interviewed person with code CSB1 states the awareness raising was insufficient and that following “the ministry was involved in the most people had to sell their land share due to project process in order to clear the way for the extension of time„. process that faced a bottleneck „ ; interviewed In the settlement process, the content of the person with code CSB3 says “the main target is contract concluded between the title holders to expedite and facilitate the process „; and companies was configured entirely in line The Ministry holds the authority for the with their demands and no public institution amendment of the plan and building permits had any control or guidance at this stage. and has granted the authority to approve the Interviewed person with code YH1 mentioned project to Istanbul Metropolitan Municipality. As that contracts were not sufficient, and the one officially Kadıköy Municipality is no longer part with code GK3 stated “we do not trust the of the transformation works. Another important investors„. step taken to expedite the agreements was 1st stage is carried out under the supervision of the Urgent Expropriation Decree enforced by the Metropolitan and Kadıkoy Municipalities, the Ministry. This way the state would have the with the title of authorized institutions, and the authority for expropriation in respect of the city stage ends after the plan for the process is blocks on which an agreement could not be cancelled and Ministry of Environment and reached and the process will progress more Urbanization is authorized within the scope of rapidly. However the expropriation process the law no. 6306 on transformation of areas lasted much longer than estimated so shortly under Disaster Risk. 1st stage is mostly the after it was decided to annul the decree for period when first impressions about the expropriation. transformation process in the area starts to Another important development in the process, shape. in respect of organization among the actors, was the formation of Fikirtepe Platform by 17 5.2 Second Stage members of Fikirtepe Urban Transformation 2nd stage is in fact an important first step taken Association that continue their Urban to find solutions for the challenges Transformation studies in Fikirtepe, with the encountered with the plan in the 1st stage. First purpose of ensuring secure and regular housing of all, there was a requirement at the in the area. Platform Member with code ÖS1 beginning to have approval of 100% of the title states his opinion; holders for applications to be made on city “Urban transformation at Fikirtepe block basis which lead to substantial problems gained outstanding speed with the and later with law no. 6306, 2/3 majority was support of Ministry of Environment and considered acceptable, which paved the way Urbanization”. for these applications. At the Preliminary One of the most important problems in this Project and building permit stages, both process was the lack of a reconciliation municipalities (IBB and Kadiköy Municipality) platform where actors could meet. That’s why were authorized, the time of approval contractors’ platform has become very processes extended, so the Ministry of efficient in determining the common problems Tuba Sari Haksever, Candan Çinar Çitak 120 JOURNAL OF CONTEMPORARY URBAN AFFAIRS, 3(2), 114-123 / 2019 of the private sector and communicating the “this amendment was made to achieve problems to relevant authorities. progress in the process”. IBB and Ministry of Environment and Urbanization acted unofficially as problem Likewise interviewed person with code OS11 resolution units. Title holders and contractors states that “The Ministry should be part of the participated in meetings at Metropolitan transformation process exercising its control Municipality and Ministry premises from time to authority”; time in order to both explain their problems Ministry of Environment and Urbanization and to reach a consensus. continues its activities to complete the Another important development in terms of transformation in the area rapidly by providing expediting the process was the omnibus bill interim solutions, while negotiating for enacted in 2016. By including the provision partnership with companies in the area that permitting sales on city block basis, urgent are facing financial difficulties. To avoid expropriation cases were dropped and share suffering of the public due to projects that sales started. could not have been completed by the Companies informed the Ministry of companies because of the financial difficulties Environment and Urbanization about the they face, the Bank of Provinces running under agreement ratio in the city blocks they are the Ministry and Kiptaş, an affiliate of Istanbul interested in and the Ministry evaluates Metropolitan Municipality, formed a whether these city blocks are subject to sale. In partnership to complete the 2 projects that case an agreement of 2/3 is reached, the were suspended. In this partnership protocol rights of the remaining 1/3 is sold to the other signed by Ministry of Environment and residents of the city block. This omnibus bill Urbanization, the Bank of Provinces and Kiptas, paved the way for permitting sale of the rights the Bank of Provinces is responsible of the of 1/3rd of the title holders, which was an financing and Kiptas is responsible for the important development that expedited the construction. process. However since city block based agreements 6. Discussion took long and evacuations on area basis were Urban transformation process being made and as the contractors had to pay rent implemented at Fikirtepe area chosen as the for a long term as public institutions could not site for this study, was explored to uncover the reach a settlement among themselves which role of the actors in the transformation process caused delay of required documents, they and engagement among actors and faced financial difficulties. At this stage some partnerships. The findings suggest that companies declared bankruptcy and tried to transformation works should be carried out in reach settlements with foreign partners. At this coordination with all stakeholders in order to point it was highlighted that as a right granted have a successful outcome and that a more under the law “rent fees should be paid by the efficient and productive relation is required public„. between the private and public sector (Roberts and Sykes, 2000). It is specifically anticipated 5.3 Third Stage that the effects of partnership structures of the One of the most important phase of urban actors will become evident in the long term transformation process of Fikirtepe and its (Garcia, 2004). vicinity is the addition of the decision In order to have a feasible urban “preliminary project approval will be cancelled transformation, long term planning should be and implementation will be done only made and partnership and cooperation according to the architectural project to be between actors should be ensured by taking approved by the Ministry of Environment and into consideration all the transformation Urbanization” with the amendment of the plan factors. Solid coordination and strong in 2016. With this decision, Istanbul Metropolitan communication network among the parties is Municipality that was included in the required to realize the partnership model, it transformation process as required by its should not be just an economic agreement. authority, is no longer an actor in the process In the study exploring the urban transformation as required by the plan note. And this project for Fikirtepe and its vicinity, some of the amendment of the plan is the start of the 3rd major issues that arise as problems in the urban stage. The interviewed person with code CS4 transformation processes in our country are emphasizes that; elaborated. These are; Tuba Sari Haksever, Candan Çinar Çitak 121 JOURNAL OF CONTEMPORARY URBAN AFFAIRS, 3(2), 114-123 / 2019 The members of the parties of the urban transformation and should determine the transformation projects, their qualities, responsibilities. Multi-actor partnership structure quantities may vary according to the quality of has the ability to cover all aspects of an urban the transformation project, the objectives, problem. spatial scale (approach for districts or the entire As Scharpf (1997) says each actor in the urban city) and may shape according to the purpose transformation process has its own strategy and of transformation and other conditions ( Turok, style. Each actor is in fact an institution on its 2005). Actors and their roles in the own. However since the result of the selected transformation area should be determined. strategy depends on the strategies of the other, Authorities and responsibilities in the the objectives are interdependent. Also we management and organization of urban should not forget that people always act in the transformation area should be defined clearly. interest of their own so it is not possible to The public sector, the actor initiating the explain the interactions purely objectively. transformation projects, needs to take the (Scharpf, 1997). Actor groups that can organize leadership role throughout the process. The take decisions much easily. The size of the authority and task sharing among public group show that people are controlled by the institutions must be clarified as a priority. It is group they are part of and their actions are considered that the public sector, which we limited accordingly. (Douglas, 2007). may describe as the main actor of the urban transformation process, needs to take on 7. Conclusion supervisory and regulatory role in the Models that involve all actors in the planning partnership process and in general the and implementation process are required to leadership role in the urban transformation figure out the multi-dimensional and complex projects (Split, 2005). Public sector should be structure of urban transformation projects. able to minimize the private sector risks by These models should be formed under the generation of knowledge regarding spatial leadership of the public sector and planning and political requirements in the area engagement of all relevant actors in the (Mccarthy, 2005). transformation process should be ensured. The If the local community does not clearly primary role of the public sector should be to understand the methods and reasons of guide, supervise and regulate. transformation, the expectations of the target In Turkey, a multi-actor partnership approach group will vary and this will lead to loss of trust. should be adopted with participation of The project scenario should be developed private sector, voluntary sector and local together with the residents of the area and the community along with the public sector. As community must take an active role in the actors take more roles in urban transformation project and its implementation. projects, economic, social and managerial It is observed that organization among actor aspects will develop. To incorporate the private groups and relation patterns listed under sector in urban transformation projects, some unforeseen problems are developing and of the incentives expected by the private changing. Public sector that is much superior in sector should be given and attractive terms legal terms due to the powers it possesses, should be provided. Local community should requires the experience of the private sector in be incorporated in the transformation process issues like workforce and organization and two at the planning phase and must be informed sectors complement one another and speed about updates at each stage of the process up the projects. However planning and and their engagement should be ensured. managing this relation accurately is the most Urban transformation projects should be clearly important criteria for successful completion of a configured and planned right from the start transformation project. and partnership structures that will follow-up Public wants to be a part of the negotiation the changing conditions and keep these under process among title holders and contractors control needs to be developed. until an agreement is reached between the parties (contract based) just like in Fikirtepe References case. However it’s role should be to balance Alp, J. (2012). Urban projects in the context of the relations between actors and to control the organizing capacity Istanbul Kartal transformation project. Government should example, (Doctoral Dissertation), Mimar protect the rights of the actors, encourage Sinan Fine Arts University, İstanbul. Retrieved engagement of various organizations that will from: make significant contributions to urban Tuba Sari Haksever, Candan Çinar Çitak 122 JOURNAL OF CONTEMPORARY URBAN AFFAIRS, 3(2), 114-123 / 2019 https://tez.yok.gov.tr/UlusalTezMerkezi/3285 http://www.irs- 16 net.de/download/wp_insights.pdf Ataöv, O. and Osmay, S. (2007). Mccarthy, J., (2005). Kentsel Dönüşümde Methodological approach to urban Ortaklık Pratiği [Partnership Practice in transformation in Turkey, Middle East Urban Transformation], International Technical University Journal of the Faculty Symposium on Urban Transformation, D. of Architecture, 2007/2, (24:2), 57-82. Özdemir, P. Özden, S. Turgut, International http://jfa.arch.metu.edu.tr/archive/0258- Symposium on Urban Transformation, 99- 5316/2007/cilt24/sayi_2/57-82.pdf 107. Küçük Çekmece Municipality Beswick, C. Ann (2001). Public-Private Publications, Istanbul 2004 proceedings Partnerships In Urban Regeneration: The book, İstanbul . Case of London Docklands, (Master http://dergipark.gov.tr/tojdac/issue/34578/ Dissertation), Calgary University Faculty of 381850 Enviromental Design, Calgary. Ozden, P. P. (2008). Urban Renewal. Istanbul, https://scholar.google.com.tr/scholar?q=Pu Turkey: Imge . blicPrivate+Partnerships+In+Urban+Regener http://www.onuracar.com/wp- ation:+The+Case+of+London+Docklands&h content/uploads/2014/02/5320_odev.pdf l=tr&as_sdt=0&as_vis=1&oi=scholart Roberts P.W., & Sykes, H. (2000). Urban Davies, Jonathan (2004). Conjuncture or Regeneration. A Handbook. London. SAGE. disjuncture? : An institutionalist analysis of Retrieved from local regeneration partnerships in the http://dx.doi.org/10.4135/9781446219980 UK. International Journal of Urban and Scharpf, F (1997). Games Real Actors Play. Regional Research, Vol.28 (No.3). pp. 570- Actor-Centered Institutionalism in Policy 585. http://dx.doi.org/10.1111/j.0309- Research. Oxford: Westview Press. 1317.2004.00536.x Retrieved from Douglas, M. (1966). Purity and danger: an https://epdf.tips/queue/games-real-actors- analysis of the concepts of pollution and play-actor-centered-institutionalism-in- taboo, London: Routledge. policy-research-theore.html https://monoskop.org/images/7/7d/Dougla Spit, T., (2004). Public-private partnerships: a s_Mary_Purity_and_Danger_An_Analysis_of_ tense relationship in the context of urban Concepts_of_Pollution_and_Taboo_2001.pd restructuring: Dutch experience, D. f Özdemir, P. Özden, S. Turgut, International Garcia, B. (2004). Cultural policy and urban Symposium on Urban Transformation, 108- regeneration in Western European cities: 116. Küçük Çekmece Municipality Lessons from experience, prospects for the Publications, Istanbul 2004 proceedings future. Local Economy, 19(4), pp. 312-326. book, İstanbul. Retrieved from http://www.academia.edu/1367335/Kentse https://doi.org/10.1080/02690940420002868 l_D%C3%B6n%C3%BC%C5%9F%C3%BCmde 28 _Kamu_%C3%96zel_Ortakl%C4%B1klar%C4% Isik, S. (2005). Urbanization and Urbanization B1_ve_%C3%96zel_Giri%C5%9Fimin_D%C3% Model in Turkey. Aegean Geographical B6n%C3%BC%C5%9F%C3%BCmdeki_Varl%C Journal: 14, s. 57-71. Retrieved from 4%B1%C4%9F%C4%B1_Konya_%C3%96rne% http://dergipark.gov.tr/download/article- C4%9Fi file/56792 Turok, I., (2005). Cities, Competition and Kalağan, G., Çiftçi, S. (2012). Public-Private Competitiveness: Identifying New Sector Cooperation in Urban Space Connections, Changing Cities. Retrieved Reflections: Urban Transformation Example from http://25-43. doi:10.1007/978-0- and New Actors, Journal of Social and 23021203-9_2 Humanities, Volume 4, No 2, 2012 ISSN:1309- 8012. Retrieved from http://dergipark.gov.tr/sobiadsbd/issue/113 54/135702 Lang, Thilo (2005). Insights in the British Debate about Urban Decline and Urban Regeneration, Working Paper, Erkner, Leibniz-Institute for Regional Development and Structural Planning. Retrieved from Tuba Sari Haksever, Candan Çinar Çitak 123