HN F -SD -W M-TS R-006 Volume 1 Tank Farms Technical Safety Requirements Volume I : Engineering Change Notices Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management CH2MHILL Hanford Group, Inc. Richland, Washington Contractor for the U.S. Department of Energy, Office of River Protection under Contract DE-AC27-99RL14047 Approved for public release; further dissemination unlimited HNF-SD-WM-TSR-006 Volume 1 3 CD 3 rc v1 CH2MHILL Henford Gmp, Inc. HNF-SD-WM-TSR-006 Volume 1 Tank Farms Technical Safety Requirements Volume 1 : Engineering Change Notices R. J. Cash CH2M HILL Hanford Group, Inc. Date Published December 2000 Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management CH2MHIL L Hanford Group, Inc. P. 0. Box 1500 Richland, Washington Contractor for the U.S. Department Jf Energy, Office of River Protection under Contract DE-AC27-99RL14047 Approved for public release; further dissemination unlimited LEQM DISCLAIMER This report was praparad as an account of work sponsorad by an agency of the Unitad States Government. Neither the United Statas Govarnment nor any aganoy thereof. nor any of thair amployees, nor any of their contractors, subcontractors or thair amploysea, makes any warranty, express or impliad, or assumes any legal liability or responsibility for tha accuracy, completanass, or any third party's usa or tha rasults of such use of any information. apparatus, product, or process disclosed. or represents that its use would not infrinoe privately owned rights. Referenca harein to any specific commarcial product, procass, or service by trade name, tradamark, manufacturer, or otherwise, does not necessarily constituta or imply its endorsement, racommendation. or favoring by the United States Govarnmant or any agancy tharsof or its contractors or subcontractors. Tha views and opinions of authors axpressad harein do not necessarily state or reflact those of tha United States Govarnment or any agency thareof. This report has baen reproduced from the bast available copy. Availabla in paper copy and microfiche. Availabla elactronically at httD://m.doe.eov/bri&. Availabla for a processing fee to the US. Department of Energy and its contractors, in paper, from: US. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831-0062 phone: 865-576-8401 fax: 865-576-5728 email: ~~k3adoNs.osti.e~(4527?6-)8 401 Available for saia to the public, in paper, from: US. Department of Commarce National Technical Information Sarvica 5285 Port Royal Road Springfield, VA 221 61 Phone: 800-553-6647 fax: 703-605-6900 amail: [email protected] online ordering: htto://~.ntis.~ov/oov/ordering.htm Primed in thU nRed States d Amisa S 658664 ENQINEERINQ CHANQE NOTICE ...................................... Pam 1 Of - E01 A h W.6 2. ECN Category (mark one) 3. Originator's Name, Organization, MSIN. and Telephone No. 4. USQ Required? 5. Date 0 Supplemental G. W. Ryan, NS&L, 84-47, 376-5114 UNO [XIYes 12/21/00 Direct Revision [XI 0 6. Project TitlelNo.Mlork Order No. 7. 8ldg.lSys.lFac. No. 8. Approval Designator Change ECN 0 RPP RPP SQD Temporary Standby 9. Document Numbers Changed by this ECN (includes IO. Related ECN No(s). 11. Related PO No. Supersedure 0 sheet no. and rev.) 0 CancelNoid See Box 13a. N /A N/A 12a. Modification Work 12b. Work Package No. 12c. Modification Work Completed 124. Restored to Or' inal Condition (Temp. or Standby ECko nly) Yes (fill out Blk. 12b) N/A N/A N/A IxI NO NABlks.12b. 42c, 12d) Design AuthoritylCo Engineer Signature 8 Design AuthoritylCo Engineer Signature & Bite Bite 14a Justification (mark one) t4b. Justification Details < 'qrh- le 0 See Block 13a above. IxI r ign iprovement 0 Enviro, neni 0 Facility DeaLL,.ation 0 As-Found 0 FaLIIiL 'e .onst 0 Luust. r:rroc. :iisston 0 Design .3ror,dmission .- I 11. ECN fuse no. from w. 1) I ENGINEERING CHANGE NOTICE Page~of 4 ~ ~ ~ 6 4 8. Design Verification 17. cost Impact 18. Schedule Impact (days) Required ENGINEERING CONSTRUCTION 1 I 0 0 0 0 Yes Addkional $ N/A Additional $ N/A lmpmvement N/A No Savings 0 $ N/A Savings 5 N/A Delay 0 N/A - SDDIDD 0 Seimlc‘Stress Analysis 0 Tank Calibration Manual 0 Functional Design Crlteria 0 StresdDesign Report 0 Health Physics Procedure 0 Operating Specihtion 0 Interfam Contml Drawing Spans Multlple Unit Listing 0 0 0 0 Criticality Spedktiin Calibration Procedure Test PrwduradSpecification Conceptual Design Report 0 lnstallatlon Procadure 0 Component Index 0 Equipment Spec. Maintenance Procedure 0 ASME Coded Item 0 0 0 0 Const. Spec. Engineering Procedure Human Fador Conslderetion Procurement Spec. 0 Operating instruction 0 Computar Software 0 0 0 0 Vendor Information Operating Procedure Eledrlc Circuit Schedule 0 0 0 OM Manual Operational Safety’ Requirement ICRS Procedure 0 0 0 FSAR/SAR IEFD Drawing Proceas Control ManualIPlan Safety’ Equipment List 0 Cell Arrangement Drawing 0 Process Flow Chart 0 0 0 0 Radlatlon Work Permlt Essentlai Materlai Spedkation Purchasa Requisltlon Environmental Impact Statement 0 Fac. Proc. Samp. Schedule 0 ncklcr FIC 0 Environmental Report 0 lnspectlon Pian 0 HNF-IP-1266 E4 0 0 0 Envlronmental Permit Inventory Adjustment Request 0. Other Alfected Documents: (NOTE: Documents listed below will not be revlsed by this ECN.) Signatures below indicate that the signing organkatlon has been notined of other afided documents IYed below. Document Number/Revi&n Document NumberlRevision Document NumberIRevision See page 4 of this ECN. Slgnature Date Signature Date Design Agent PE QA QA See ~aqe3 of this ECN Safely Safety See paqe 3 of this ECN Design Environ. Envlmn. Other Signature or a Control Number that tracks the ADDmMI Sinnatw A-7900-013 -3 (1O B7 SCN 658664 Page 3 Subject: CY2000 Authorization Basis Annual Update Date: 12/1/00 '-+- This sign-off sheet documents the Tie I review of the AB documents. I Minimum Review I Position Criteria' Signature Date Director, Nudear Safety 8 Licensing CE Leach 12/27 00 Manager, Operational Safety SK Alexander 2,3.g I Manager, ESHBQ EE Mayer 3. a-e, (L j Director, SST Interim Closure JJ Badden 2.a-f, B i Director, DST and Waste Feed RA Dodd 2.a-f. B i Delively Operations Director, SST Interim Closure JW Hobbs 3.j) and ESHBQ Director, DST ESHBQ SJ Eberiein I Chief Engineer MDHasty 4 I Manager, SST interim Closure JJBadden 4 Engineering Manager, DST Engineering HR Hopkins Director. Safety 6 Health RE Debusk 4.a-i ~~ Director, Quality Assurance GL Faust I Director, Radiological Control EE Bickel. 3.a Director, Environmental interfacing Fadiity - A TA Campbell 242-A Evaporator ' From HNF-IP-0842, Vol IV, Section 5.14, Attachment B. I I I Engineering Change Notice Continuation Sheet ECN-658664 I FSAR FSAR Description of Change Page Section TSR TSR Description of Change Page Siction Block 20. Other Affected Documents fcont'd) "F-IP-1266, "Tank Farm Operations Administrative Controls" . . HN F -SD-WM-TSR-006 I Volume 2 Tank Farms Technical Safety Requirements Volume 2: Technical Safety Requirements R. J. Cash CH2M HILL Hanford Group. Inc Date Published December 2000 Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management CH2MHlLL tianford Group, Inc. P. 0. Box 1500 Richland. Washington Contractor for the U.S. Department of Ener y Office of River Protection under Contract D!-LC27-99RL14047 Approved for public release; further dissemination unlimited LEGAL DISCIAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors or their employees, makes any warranty. express or implied, or assumes any legal liability or responsibility for the accuracy. completeness, or any third party's use or the results of such use of any information, apparatus, product. or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product. process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof or its contractors or subcontractors. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. This report has been reproduced from the best available COPY. Available in paper copy and microfiche. Available electronically at httv:Nwww.doe.eovhidee. Available for a processing fee to the US. Department of Energy and its contractors. in paper, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831-0062 phone: 885-576-6401 fax: 865-576-5728 email: [email protected](423I 576-6401 Available for sale to the public, in paper. from: U.S. Department of Commerce National Technical Information %Nice 5285 Port Royal Road Springfield, VA 22161 Phone: 800-553-6847 fax: 703-605-6900 email: [email protected] online ordering: httu://www.ntis.cov/orderinE.htm hinted in the United Slates Of America