ebook img

Specifications New Airport Traffic Control Tower Hammond Northshore Airport Hammond ... PDF

373 Pages·2012·5.3 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Specifications New Airport Traffic Control Tower Hammond Northshore Airport Hammond ...

Specifications New Airport Traffic Control Tower Hammond Northshore Airport Hammond, Louisiana RFP 14‐04 Construction Documents 12 July, 2013 Note: These specifications accompany drawings dated 9 July, 2013   200 Willard Street Suite 2C Cocoa, Florida 32922 LA CA 5070 REQUESTS FOR BIDS / INVITATION FOR BIDS Construct Airport Traffic Control Tower City of Hammond Louisiana, Hammond Northshore Airport Hammond Louisiana – RFP #14-04 Sealed bids will be received until August 28, 2013, 2PM CST , and then publicly opened and read aloud at the Hammond Northshore Regional Airport, 600 Judge Leon Ford Drive, Hammond, Louisiana 70401, for furnishing all labor, materials and equipment and performing all work necessary to Construct Airport Traffic Control tower and related utilities. One (1) copy of the bid documents including project drawings and technical specifications will be furnished to prime bidders properly licensed by the Louisiana State Licensing Board for Contractors at a cost of $206.42 by check or money order only, credit cards are not accepted. Order bid documents by email to [email protected]. Allow 24 hours processing time, after email confirmation is sent to you, before pick up. Provide evidence of license by the Louisiana State Licensing Board on this email. Bid documents may be picked up at the airport. Shipping of documents shall be processed by the Contractor. Electronic copies are available for download at: http://www.hammond.org/?page_id=610 National plan shops will be working with the City for copies available to their subscribers. A non mandatory prebid conference for this project will be held on August 13 at 2PM CST at the Airport Manager’s Office, 600 Judge Leon Ford Drive, Hammond, LA 70401. To be placed on the bidder’s list please contact Lacy Landrum at 985-277-5653, [email protected]. Each proposal must be accompanied by a bid guaranty in the amount of five (5) percent of the total amount of the bid. The bid guaranty may be by certified check or bid bond made payable to the City of Hammond. The estimated cost for this project is between $1M and $1.3M. Bids may be held by the City of Hammond for a period not to exceed forty five (45) calendar days of receipt of bids to award the contract to the lowest responsible bidder or reject all bids. However, written extensions of thirty calendar days may be mutually agreed to by the City and the lowest responsible bidders. The right is reserved, as the City of Hammond may require, to reject any and all bids and to waive any informality in the bids received as permitted by public bid law. The provisions of Louisiana Law, Revised Statutes, Title 38, RS38:2212 shall not be waived by the City of Hammond. This project is subject to the requirements of the Davis-Bacon Act, as amended. The Contractor is required to comply with wage and labor provisions and to pay minimum wages in accordance with the schedule of wage rates established by the United States Department of Labor. July 12, 2013 Construction Document Specification Book Page 1 Award of contract will be based on the lowest proposal submitted from those bidders that are confirmed as being qualified, responsive and responsible. Award of contract is also subject to the following Federal provisions: Executive Order 11246 and DOL Regulation 41 CFR PART 60 - Affirmative Action to Ensure Equal Employment Opportunity DOL Regulation 29 CFR Part 5 – Davis Bacon Act DOT Regulation 49 CFR PART 29 – Government wide Debarment and Suspension and Government wide Requirements for Drug-free Workplace DOT Regulation 49 CFR PART 30 - Denial of Public Works Contracts to Suppliers of Goods and Services of Countries that Deny Contracts to Suppliers of Goods and Services of Countries that Deny Procurement Market Access to U.S. Contractors (Foreign Trade Restriction). TITLE 49 United States Code, CHAPTER 501 – Buy American Preferences Federal Provisions This project is subject to the following Federal provisions, statutes and regulations; Equal Employment Opportunity - Executive Order 11246 and 41 CFR Part 60: The Bidder’s attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth within the supplementary provisions. The successful Bidder shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, or national origin. Goals for Minority and Female Participation – Executive Order 11246 and 41 CFR Part 60: 1. The Bidder’s attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth within the supplementary provisions. 2. The goals and timetables for minority and female participation, expressed in percentage terms for the contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Timetables: Goals for minority participation for each trade: 26.5% Goals for female participation in each trade: 6.9% These goals are applicable to all of the contractor's construction work (whether or not it is Federal or federally-assisted) performed in the covered area. If the contractor performs construction work in a geographical area located outside of the geographical area where the work is actually performed, with regard to this second area, the contractor also is subject to the goals for both its Federally involved and non-federally involved construction. RFB/IFB Page 2 AJT Engineering, Inc. July 12, 2013 Construction Document Specification Book Page 2 Certification of Nonsegregated Facilities – 41 CFR Part 60: A certification of Nonsegregated Facilities must be submitted prior to the award of a federally-assisted construction contract exceeding $10,000 which is not exempt from the provisions of the Equal Opportunity Clause. Contractors receiving federally assisted construction contract awards exceeding $10,000, which are not exempt from the provisions of the Equal Opportunity Clause will be required to provide for the forwarding of the notice to prospective subcontractors for supplies and construction contracts where the subcontracts exceed $10,000 and are not exempt from the provisions of the Equal Opportunity Clause. The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001. Disadvantaged Business Enterprise – 49 CFR Part 26: The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of this FAA- assisted contracts. In accordance with 49 CFR Part 26.45, the sponsor has established a contract goal of zero (0) percent participation for small business concerns owned and controlled by certified socially and economically disadvantaged enterprise (DBE). The bidder shall make and document good faith efforts, as defined in Appendix A of 49 CFR Part 26, to meet this established goal. Additional goals are set in other sections in these specifications. Davis-Bacon Act, as amended – 29 CFR Part 5: The Contractor is required to comply with wage and labor provisions and to pay minimum wages in accordance with the current schedule of wage rates established by the United States Department of Labor. Current rates are included later in these specifications however it is up to the bidder to verify and conform to the latest published rates. Debarment, Suspension, Ineligibility and Voluntary Exclusion – 49 CFR Part 29: The bidder certifies, by submission of a proposal or acceptance of a contract, that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency. Individuals or companies listed in the General Services Administration’s “Excluded Parties Listing System” will not be considered for award of contract. Foreign Trade Restriction – 49 CFR Part 30 The Bidder and Bidder’s subcontractors, by submission of an offer and/or execution of a contract, is required to certify that it: a. is not owned or controlled by one or more citizens of a foreign country included in the list of countries that discriminate against U.S. firms published by the Office of the United States Trade Representative (USTR); b. has not knowingly entered into any contract or subcontract for this project with a person that is a citizen or national of a foreign country on said list, or is owned or controlled directly or indirectly by one or more citizens or nationals of a foreign country on said list; c. has not procured any product nor subcontracted for the supply of any product for use on the project that is produced in a foreign country on said list. RFB/IFB Page 3 AJT Engineering, Inc. July 12, 2013 Construction Document Specification Book Page 3 Buy American Certificate – Aviation Safety and Capacity Act of 1990: This contract is subject to the “Buy American Preferences” of the Aviation Safety and Capacity Act of 1990. Prospective Bidders are required to certify that steel and manufactured products have been produced in the United States and to clearly identify those items produced or manufactured outside of the United States. Additional Provisions Modification to the project documents may only be made by written addendum by the Owner or Owner’s authorized Representative. The proposal must be made on the forms provided within the bound project manual. Bidders must supply all required information prior to the time of bid opening. Submittal of Proposals Additional information and instruction for submittal of a proposal are provided within the Instructions-to-Bidders. Envelopes containing bids must be sealed and addressed to: Hammond Northshore Airport Manager, 600 Judge Leon Ford Drive, Hammond, LA 70401 The upper left hand corner of the sealed envelope must identify the following information: CONTRACT PROPOSAL Bid of {Name of Contractor} LA License No.: {LA License Number} for construction improvements at {Project Location} Project No. : 14-04 To be opened at: {Time and Date of Bid Opening} RFB/IFB Page 4 AJT Engineering, Inc. July 12, 2013 Construction Document Specification Book Page 4 Hammond Northshore Regional Airport - Construct ATCT Hammond, Louisiana TABLE OF CONTENTS BIDDING PROPOSAL REQUIREMENTS GROUP REQUESTS FOR BIDS / INVITATION FOR BIDS INSTRUCTIONS TO BIDDERS LOUISIANA UNIFORM PUBLIC WORK BID FORM UNIT PRICE FORM BID BOND ACKNOWLEDGEMENTS BY BIDDER REFERENCES ATTESTATION CLAUSE CONTRACT AGREEMENT INSURANCE REQUIREMENTS PAYMENT BOND PERFORMANCE BOND GENERAL PROVISIONS SECTION 50 — CONTROL OF WORK SECTION 70 — LEGAL REGULATIONS AND RESPONSIBILITY TO PUBLIC SECTION 80 — PROSECUTION AND PROGRESS SECTION 90 — MEASUREMENT AND PAYMENT SECTION 100 — CONTRACTOR QUALITY CONTROL PROGRAM SUPPLEMENTARY PROVISIONS WAGE DETERMINATION SPECIFICATIONS GROUP GENERAL REQUIREMENTS SUBGROUP DIVISION 01 - GENERAL REQUIREMENTS Section Title 01 10 00 Summary 01 30 00 Administrative Requirements 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 50 00 Temporary Facilities and Controls 01 60 00 Product Requirements 01 70 00 Execution and Closeout Requirements July 12, 2013 Construction Document Specification Book Page 5 Hammond Northshore Regional Airport - Construct ATCT Hammond, Louisiana TECHNICAL SPECIFICATIONS DIVISION 02 – CIVIL WORKS (Sealed under separate cover by Spangler Engineering) CSI SECTION 02050 CONSTRUCTION LAYOUT 02100 CLEARING AND PREPARING SITE AND SIGNAGE 02110 SITE DEMOLITION 02200 EXCAVATION AND EMBAKNMENT, HUAL-IN BACKFILL 02200A EXCAVATION, TRENCHING AND BACKFILL FOR UTILITIES 02325 EROSION CONTROL 02362 SOIL CEMENT-STABILIZED SUBBASE 02515 MANHOLES, WET WELLS, INLETS, AND CATCH BASINS 02550 DRAINAGE CULVERTS 02556 WATER LINES 02600 PORTLAND CEMENT CONCRETE 02611 AGGREGATE SURFACE COURSE 02730 SANITARY SEWER 02741 HOT ASPHALTIC CONCRETE DIVISION 03 - CONCRETE 03 30 00 Cast-In-Place Concrete 03 45 00 Precast Architectural Concrete DIVISION 04 - MASONRY Not Used DIVISION 05 - METALS 05 12 00 Structural Steel Framing 05 31 13 Steel Decking 05 40 00 Cold-Formed Metal Framing 05 51 00 Metal Stairs DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES 06 41 00 Architectural Wood Casework DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 18 00 Traffic Coatings 07 61 03 Manufactured Sheet Metal Roofing 07 54 23 TPO Roof System 07 84 00 Firestopping DIVISION 08 - OPENINGS 08 11 16 Aluminum Doors 08 12 14 Standard Steel Frames 08 13 14 Standard Steel Doors 08 44 13 Glazed Aluminum Curtain Walls 08 80 00 Glazing DIVISION 09 - FINISHES 09 21 16 Gypsum Board Assemblies 09 24 23 Portland Cement Stucco 09 90 00 Painting and Coating July 12, 2013 Construction Document Specification Book Page 6 Hammond Northshore Regional Airport - Construct ATCT Hammond, Louisiana DIVISION 10 - SPECIALTIES 10 13 00 Beacon 10 14 00 Signage DIVISIONS 14 TO 20 - NOT USED DIVISION 21 - FIRE SUPPRESSION 21 05 00 Common Work Results for Fire Suppression 21 12 00 Fire Suppression Standpipes DIVISION 22 - PLUMBING 22 05 03 Pipes and Tubes for Plumbing Piping and Equipment 22 05 23 General-Duty Valves for Plumbing Piping 22 05 29 Hangers and Supports for Plumbing Piping and Equipment 22 05 53 Identification for Plumbing Piping and Equipment 22 07 00 Plumbing Insulation 22 33 00 Electric Domestic Water Heaters 22 40 00 Plumbing Fixtures DIVISION 23 - 26 - NOT USED DIVISION 26 - ELECTRICAL 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 53 Identification for Electrical Systems 26 41 00 Facility Lightning Protection 26 51 00 Interior Lighting DIVISION 27 – NOT USED DIVISION 28 - ELECTRONIC SAFETY AND SECURITY 28 13 00 Video Intercom and Access Control System 28 31 00 Fire Detection and Alarm DIVISION 29 - NOT USED SITE AND INFRASTRUCTURE SUBGROUP DIVISION 30 - NOT USED DIVISION 31 – EARTHWORK 31 09 19 Pile Dynamic Load Tests 31 62 14 Prestressed Concrete Piles GEOTECHNICAL INVESTIGATION AND REPORT July 12, 2013 Construction Document Specification Book Page 7 INSTRUCTIONS TO BIDDERS Owner and Owner’s Representative The Owner or Sponsor as stated herein refers to the City of Hammond. The Owner’s authorized representative as stated herein refers to the Owner’s Consultant AJT Engineering, Inc. herein referred to as Engineer. Communications with the Owner and Owner’s Representative Any and all questions and comments regarding this project shall be in writing either through letter or email. DO NOT CONTACT THE AIRPORT MANAGER with any questions. All questions or comments shall be sent to [email protected]. NO PHONE CALLS. A listing of registered bidders (bidders list) will be posted on the website shown on the Request for Bids. The airport or the Engineer will not provide this list or directions on how to obtain this list. Bidder Representations By submittal of a proposal (bid), the BIDDER represents the following:  The Bidder has read and thoroughly examined the project documents  The Bidder has a complete understanding of the terms and conditions required for the satisfactory performance of project work.  The Bidder has fully informed themselves of the project site, the project site conditions and the surrounding area.  The Bidder has familiarized themselves of the requirements of working on an operating airport and understands the conditions that may in any manner affect cost, progress or performance of the work  The Bidder has correlated their observations with that of the project documents.  The Bidder has found no errors, conflicts, ambiguities or omissions in the project documents, except as previously submitted in writing to the owner that would affect cost, progress or performance of the work.  The Bidder is familiar with all applicable Federal, State and local laws, rules and regulations pertaining to execution of the contract and the project work.  The Bidder acknowledges that it is required of them to apply for and obtain any and all required local and state permits to construct this building and site.  The Bidder has complied with all requirements of these instructions and the associated bid documents. Bid Documents The bid documents are comprised of the following; Notice-to-Bidders, Instructions-to-Bidders, General Provisions, Supplementary Provisions, Technical Specifications, Project Drawings, Proposal Form with attachments, Form of Contract Agreement, any authorized addenda issued by the Owner and any document incorporated in whole or in part by reference therein. All documents comprising the Bid Documents are complementary to one another and together establish the complete terms, conditions and obligations of the successful bidder. The following documents are to be submitted as the bid proposal: a. Louisiana Uniform Public Works Bid Form; b. Alternates and Unit Cost; c. Bid security; and, d. Corporate resolution All other documentation required to evaluate the bids shall be delivered to the City within 10 calendar days following opening of bids and determination of the low bidder. Modifications to Project Documents Modifications to the project documents may only be made by written addendum issued by the Owner or the Engineer. Verbal explanations, interpretations or comments made by the Owner or Owner’s representative shall not be binding. Addenda will be transmitted to all known official plan holders. Addenda must be delivered to all prime bidders who have requested bid documents within twenty-four hours of issuance either by fax, e-mail, other electronic means or by hand and a copy shall be mailed to all prime bidders who have requested bid documents. If the addendum cannot be transmitted by fax, e-mail, other electronic means or by Instructions to Bidders Page 1 AJT Engineering, Inc. July 12, 2013 Construction Document Specification Book Page 8 hand, the bid opening shall be postponed by at least seven (7) days. Each bidder shall certify at the time of bid submittal that they acknowledge receipt of all issued addenda. Errors and Discrepancies in Project Documents Should Bidder find an error, discrepancy, ambiguity or omission in the project documents prior to submittal of a proposal, the Bidder is obligated to contact the Owner or Engineer with written notice of the error, discrepancy, ambiguity or omission. The written notice shall identify the nature and location of the error, discrepancy, ambiguity or omission. Corrections or modifications to the project documents will only be made by written addendum as prescribed herein. By submittal of a Bid Proposal, Bidder represents that they have thoroughly reviewed the project documents and that they have not identified any error, discrepancy, ambiguity or omission that would affect cost, progress or performance of the project work. Clarifications and Interpretations A bidder requiring a clarification or interpretation of the project documents shall make a written request to the Owner or Engineer. The Owner or Engineer must receive the written request a minimum of seven (7) calendar days prior to the date of the bid opening. Examination of Plans, Specifications and Site Conditions As stated within the “Bidder Representations” and reaffirmed herein, the Bidder is expected to carefully examine the site of the proposed work, the proposal, drawings, specifications, terms and conditions of the proposed agreement and the form of agreement. The Bidder shall satisfy themselves as to the character, quality, and quantities of work to be performed, materials to be furnished and as to the requirements of the proposed contract. The submission of a proposal shall be prima facie evidence that the Bidder has made such examination and is satisfied as to the conditions to be encountered in performing the work and as to the requirements of the proposed contract, plans and specifications. Boring logs and other records of subsurface investigations and tests, as appropriate may be available for inspection by the Bidder. It is understood and agreed that such subsurface information, whether included in the project drawings, specifications or otherwise made available to the Bidder, was obtained and is intended for the owner’s design and estimating purposes only. Such information has been made available for the convenience of all bidders. It is further understood and agree that Bidder is solely responsible for all assumptions, deductions, or conclusions which he or she may make from his or her examination of the boring logs and other records of subsurface investigations and tests that are furnished by the Owner. Issuance of Proposal Forms The Owner reserves the right to refuse to issue a proposal form to a prospective bidder should the bidder be in default for any of the following reasons: a. Failure to comply with any pre-qualification regulations of the owner, if such regulations are cited or otherwise included, in the proposal as a requirement for bidding. b. Failure to pay, or satisfactory settle, all bills due for labor and materials on former contracts in force (with the owner) at the time the owner issues the proposal to a prospective bidder. c. Contractor default under previous contracts with the owner d. Unsatisfactory work on previous contracts with the owner Form of Proposal All bid proposals shall be made on the forms provided by the Owner. No bidder may submit more than one proposal. All proposals are to be written in ink and shall be clearly legible. All blank spaces in the proposal forms shall be legibly completed for each and every bid item. The Bidder shall not qualify any bid item. The Bidder shall initial any erasures and alterations made on the proposal form by the bidder. The Bidder shall state the price of their bid in U.S. dollars and cents in both written and numeral format. In the event of a discrepancy, the written value will take precedence. Signature of Proposal The proposal shall be signed and dated by an authorized representative of the Bidder. All signatures shall be made with an ink pen. The Bidder’s representative shall have the legal authority to obligate and bind the Bidder to the terms and conditions of the contract.  For bids by corporations, an officer of the corporation shall sign the bid, the State of incorporation shall be identified and the corporate seal affixed. Instructions to Bidders Page 2 AJT Engineering, Inc. July 12, 2013 Construction Document Specification Book Page 9

Description:
Low-Voltage Electrical Power Conductors and Cables. 26 05 53. Identification for .. If the proposal contains unit prices that are obviously unbalanced. 6. If the proposal is not .. (c) Extortion (R.S. 14:66). (b) Corrupt influencing (R.S.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.