ebook img

San Francisco Zoological Gardens : infrastructure master plan : final report PDF

352 Pages·1995·21.9 MB·English
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview San Francisco Zoological Gardens : infrastructure master plan : final report

oMtNT3 oert- oOC SAN FRANCISCO PUBLIC LIBRARY REFERENCE BOOK Not U) be taken from the Library DOCUMENTS DEPARTMENT SAN FRANCISCO San Francisco Zoological Gardens Infrastructure Master Plan Final Report City & County of San Francisco Department of Public Works San Francisco Zoological Gardens 930524.03 K/J August 1995 Kennedy/Jenks Consultants, Inc. - AGS, Inc. An Association SANFRANCISCOPUBLICLIBRARY 3 1223 04181 0145 Kennedy/Jenks Consultants — Engineers and Scientists _ ...... „ , Marathon Plaza, Tenth Floor 303Second Street 25 August 1995 San Francisco, California94107 415-243-2150 FAX 415-896-0999 Ms. Karen Kubick City and County of San Francisco Department of Public Works 30 Van Ness, 5th Floor San Francisco, CA 94102 Ms. Maria Jurosek San Francisco Zoological Gardens Zoo Road 1 San Francisco, CA 94132 Subject: San Francisco Zoo Infrastructure Master Plan - Final Report K/J 930524 / AGS 920801 Dear Ms. Kubick and Ms. Jurosek: Enclosed for your use is the San Francisco Zoo Infrastructure Master Plan Final Report. This revised report incorporates your comments on the December 1 994 draft report and includes revised estimates of probable construction costs for the recommended infrastructure improvements. An executive summary is provided to highlight the findings and recommendations for each utility system as well as provide a discussion on the overall implementation of the proposed improvements and their probable construction costs. For each system, a separate section is provided to discuss demands/flows, design criteria and assumptions, modeling assumptions, recommended facilities and their proposed implementation. This final report also contains the following appendices: • Approved Negative Declaration for the Infrastructure Project; • AGS, Inc.'s Zoo Water Resource Feasibility Analysis Report dated September 1994; and • AGS, Inc.'s Infrastructure Geotechnical Study Final Report dated June 1995. For both the water and sewer systems, separate technical binders containing actual model runs and results have been prepared; these are available for your review upon request. Kennedy/Jenks Consultants Ms. Karen Kubick Ms. Maria Jurosek 25 August 1995 Page 2 We have enjoyed working with you on this Master Plan and look forward to our continued involvement with the project. Please call if you have any questions. Very truly yours, KENNEDY/JENKS CONSULTANTS AGS, INC. Fred C. Neal Luis Moura Project Manager, K/J Project Manager, AGS Elizabeth Teien Project Engineer, K/J g\zoo\finalmp\coverttr.doc

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.