Salt Lake Mosquito Abatement District 2215 N. 2200 W. Salt Lake City, Utah February 2018 SLC Mosquito Abatement District SECTION 00 01 02 PROJECT INFORMATION PART 1 GENERAL 1.01 PROJECT IDENTIFICATION A. Project Name: Salt Lake Mosquito Abatement District, located at 2215 North 2200 West, Salt Lake City, Utah. B. SLC Mosquito Abatement District's Project Manager: Construction Control Corporation. 1. Address: 307 West 200 South, Suite 4006. 2. City, State, Zip: Salt Lake City, Utah 84101. 3. Phone/Fax: 801-578-1201. 4. E-mail: ________. 1.02 NOTICE TO PROSPECTIVE BIDDERS A. These documents constitute an Invitation to Bid to General Contractors for the construction of the project described below. 1.03 PROJECT DESCRIPTION A. Summary Project Description: 6 buldings of various size to include, Administation, Vehicle Stoage, Vehicle Maintenance, and material storage. B. Contract Terms: Lump sum (fixed price). 1.04 PROJECT CONSULTANTS A. The Architect, hereinafter referred to as Architect: Architectural Design West. 1. Address: 795 N 400 W. 2. City, State, Zip: Salt Lake City, Utah 84103. 3. Phone/Fax: 801-539-8221. 1.05 PROCUREMENT TIMETABLE A. Last Request for Substitution Due: 8 days prior to due date of bids, Wednesday, Febuary 28, 2018. B. Last Request for Information Due: 8 days prior to due date of bids, Wednesday, February 28, 2018. C. Bid Due Date: March 8, 2018, before 1:00 pm local time. D. Bid Opening: closedbid. E. Bids May Not Be Withdrawn Until: 60 days after due date. F. Contract Time: To be stated in bid documents. G. Desired Construction Start: Not later than April 2, 2018. H. Desired Substantial Completion Date: April 3, 2019. _____. I. The SLC Mosquito Abatement District reserves the right to change the schedule or terminate the entire procurement process at any time. 1.06 PROCUREMENT DOCUMENTS A. Availability of PDF Documents: Complete sets of procurement documents may be obtained: 1. From SLC Mosquito Abatement District at the Project Manager's address listed above. 1.07 BID SECURITY A. Bids shall be accompanied by a security deposit as follows: 1. Bid Bond of a sum no less than 5 percent of the Bid Amounton AIA A310 Bid Bond Form. PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) END OF SECTION 00 01 02 815065 00 01 02 - 1 PROJECT INFORMATION SLC Mosquito Abatement District 815065 00 01 02 - 2 PROJECT INFORMATION SLC Mosquito Abatement District SECTION 00 01 10 TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS 1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 01 02 - Project Information B. 00 01 10 - Table of Contents C. 00 21 13 - Instructions to Bidders D. 00 03 00 - Available Project Information E. 00 50 00 - Contracting Forms and Supplements F. 00 72 00 - General Conditions SPECIFICATIONS 2.01 DIVISION 01 -- GENERAL REQUIREMENTS A. 01 10 00 - Summary B. 01 20 00 - Price and Payment Procedures C. 01 22 00 - Unit Prices D. 01 23 00 - Alternates E. 01 30 00 - Administrative Requirements F. 01 32 16 - Construction Progress Schedule G. 01 40 00 - Quality Requirements H. 01 50 00 - Temporary Facilities and Controls I. 01 58 13 - Temporary Project Signage J. 01 60 00 - Product Requirements K. 01 70 00 - Execution and Closeout Requirements L. 01 74 19 - Construction Waste Management and Disposal M. 01 78 00 - Closeout Submittals 2.02 DIVISION 02 -- EXISTING CONDITIONS 2.03 DIVISION 03 -- CONCRETE A. 03 24 00 - Macromesh Reinforcement B. 03 24 01 - Micromesh Reinforcement C. 03 25 10 - Expansion, Construction and Control Joints D. 03 30 00 - Cast-in-Place Concrete E. 03 70 00 - Precast Concrete Vaults, Manholes, and Boxes F. 03 93 60 - Water Leakage Test for Concrete Structures 2.04 DIVISION 04 -- MASONRY 2.05 DIVISION 05 -- METALS A. 05 12 00 - Structural Steel Framing B. 05 21 00 - Steel Joist Framing C. 05 31 00 - Steel Decking D. 05 40 00 - Cold-Formed Metal Framing E. 05 51 00 - Metal Stairs F. 05 53 05 - Metal Gratings and Floor Plates 2.06 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES 815065 00 01 10 - 1 TABLE OF CONTENTS SLC Mosquito Abatement District A. 06 20 00 - Finish Carpentry B. 06 41 00 - Architectural Wood Casework C. 06 61 00 - Simulated Stone Fabrications D. 06 83 16 - Fiberglass Reinforced Paneling 2.07 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION A. 07 05 33 - Fire and Smoke Assembly Identification B. 07 11 13 - Bituminous Dampproofing C. 07 19 00 - Water Repellents D. 07 21 00 - Thermal Insulation E. 07 25 00 - Weather Barriers F. 07 41 13 - Metal Roof Panels G. 07 42 13.23 - Metal Composite Material Wall Panels H. 07 54 00 - Thermoplastic Membrane Roofing I. 07 62 00 - Sheet Metal Flashing and Trim J. 07 72 00 - Roof Accessories K. 07 92 00 - Joint Sealants 2.08 DIVISION 08 -- OPENINGS A. 08 11 13 - Hollow Metal Doors and Frames B. 08 14 16 - Flush Wood Doors C. 08 17 00 - Integrated Door Opening Assemblies D. 08 31 00 - Access Doors and Panels E. 08 33 23 - Overhead Coiling Doors F. 08 42 29 - Automatic Entrances G. 08 43 13 - Aluminum-Framed Storefronts H. 08 51 13 - Aluminum Windows I. 08 62 00 - Unit Skylights J. 08 71 00 - Door Hardware K. 08 80 00 - Glazing L. 08 91 00 - Louvers M. 08 92 00 - Louvered Equipment Enclosures 2.09 DIVISION 09 -- FINISHES A. 09 21 16 - Gypsum Board Assemblies B. 09 22 16 - Non-Structural Metal Framing C. 09 30 00 - Tiling D. 09 51 00 - Acoustical Ceilings E. 09 65 00 - Resilient Flooring F. 09 68 13 - Tile Carpeting G. 09 84 30 - Sound-Absorbing Wall and Ceiling Units H. 09 91 23 - Interior Painting I. 09 97 23 - Concrete and Masonry Coatings 2.10 DIVISION 10 -- SPECIALTIES 815065 00 01 10 - 2 TABLE OF CONTENTS SLC Mosquito Abatement District A. 10 11 01 - Visual Display Boards B. 10 14 00 - Signage C. 10 21 13.13 - Metal Toilet Compartments D. 10 22 39 - Folding Panel Partitions E. 10 26 01 - Wall and Corner Guards F. 10 28 00 - Toilet, Bath, and Laundry Accessories G. 10 44 00 - Fire Protection Specialties H. 10 71 13.43 - Fixed Sun Screens I. 10 75 00 - Flagpoles 2.11 DIVISION 11 -- EQUIPMENT A. 11 52 13 - Projection Screens B. 11 53 00 - Laboratory Equipment 2.12 DIVISION 12 -- FURNISHINGS A. 12 93 13 - Bicycle Racks 2.13 DIVISION 13 -- SPECIAL CONSTRUCTION 2.14 DIVISION 14 -- CONVEYING EQUIPMENT 2.15 DIVISION 21 -- FIRE SUPPRESSION 2.16 DIVISION 22 -- PLUMBING A. 22 05 00 - Common Work Results for Plumbing B. 22 05 17 - Sleeves and Sleeve Seals for Plumbing Piping C. 22 05 18 - Escutcheons for Plumbing Piping D. 22 05 19 - Meters and Gages for Plumbing Piping E. 22 05 23 - General-Duty Valves for Plumbing Piping F. 22 05 29 - Hangers and Supports for Plumbing Piping and Equipment G. 22 05 48 - Vibration and Seismic Controls for Plumbing Piping and Equipment H. 22 05 53 - Identification for Plumbing Piping and Equipment I. 22 07 00 - Plumbing Insulation J. 22 11 13 - Water Distribution Utilities K. 22 11 16 - Domestic Water Piping L. 22 11 19 - Domestic Water Piping Specialties M. 22 13 13 - Facility Sanitary Sewers N. 22 13 16 - Sanitary Waste and Vent Piping O. 22 13 19 - Sanitary Waste Piping Specialties P. 22 14 11 - Disinfecting Water Supply System Q. 22 14 13 - Facility Storm Drainage Piping R. 22 14 23 - Storm Drainage Piping Specialties S. 22 15 13 - General Service Compressed Air Piping T. 22 15 19 - General Service Packaged Air Compressors and Receivers U. 22 31 00 - Domestic Water Softeners V. 22 34 00 - Fuel-Fired Domestic Water Heaters 2015-09-01 W. 22 40 00 - Plumbing Fixtures 815065 00 01 10 - 3 TABLE OF CONTENTS SLC Mosquito Abatement District X. 22 45 00 - Emergency Plumbing Fixtures Y. 22 47 00 - Drinking Fountains and Water Coolers 2.17 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) A. 23 01 00 - Mechanical Requirements B. 23 05 00 - Common Work Result for HVAC C. 23 05 14 - Variable Frequency Motor Drives D. 23 05 16 - Expansion Fittings and Loops for HVAC Piping E. 23 05 17 - Sleeves and Sleeve Seals for HVAC Piping F. 23 05 18 - Escutcheons for HVAC Piping G. 23 05 19 - Meters and Gages for HVAC Piping H. 23 05 23 - General-Duty Valves for HVAC Piping I. 23 05 29 - Hangers and Supports for HVAC Piping and Equipment J. 23 05 48 - Vibration and Seismic Controls for HVAC Piping and Equipment K. 23 05 50 - Operation and Maintenance of HVAC Systems L. 23 05 53 - Identification for HVAC Piping and Equipment M. 23 05 93 - Testing, Adjusting, and Balancing for HVAC N. 23 07 13 - Duct Insulation O. 23 07 19 - HVAC Piping Insulation P. 23 09 00 - Building Automation System Q. 23 09 93 - Sequence of Operations for HVAC Controls R. 23 11 23 - Facility Natural-Gas Piping S. 23 13 23 - Above Ground Fuel Storage Tanks T. 23 21 13 - Hydronic Piping U. 23 21 16 - Hydronic Piping Specialties V. 23 25 13 - Water Treatment for Closed-Loop Hydronic Systems W. 23 30 01 - Common Duct Requirements X. 23 31 13 - Metal Ducts Y. 23 33 00 - Air Duct Accessories Z. 23 34 23 - HVAC Power Ventilators AA. 23 34 33 - Air Curtains AB. 23 36 00 - Air Terminal Units AC. 23 37 13 - Diffusers_ Registers_ and Grilles AD. 23 37 14 - Fixed Louvers AE. 23 37 23 - HVAC Gravity Ventilators (1) AF. 23 52 14 - Finned Water-Tube Boilers AG. 23 52 16 - Condensing Boilers AH. 23 54 00 - Furnaces AI. 23 55 23 - Gas Fired Radiant Heaters AJ. 23 55 24 - Gas Fired Radiant Tube Heaters AK. 23 72 00 - Air-To-Air Energy Recovery Equipment AL. 23 73 10 - AAON Roof-top Air Conditioners AM. 23 74 13 - Packaged Outdoor Central-Station Air-Handling Units 815065 00 01 10 - 4 TABLE OF CONTENTS SLC Mosquito Abatement District AN. 23 76 13 - Direct Evaporative Air Coolers AO. 23 81 26 - Split System Air-Conditioners AP. 23 82 39.19 - Wall and Ceiling Unit Heater AQ. 23 83 20 - Underfloor Heating System 2.18 DIVISION 26 -- ELECTRICAL A. 26 05 19 - Low-Voltage Electrical Power Conductors and Cables B. 26 05 26 - Grounding and Bonding for Electrical Systems C. 26 05 29 - Hangers and Supports for Electrical Systems D. 26 05 33 - Raceways and Boxes for Electrical Systems E. 26 05 36 - Cable Trays for Electrical Systems F. 26 05 39 - Underfloor Raceways for Electrical Systems G. 26 05 44 - Sleeves and Sleeve Seals for Electrical Raceways and Cabling H. 26 05 48.16 - Seismic Controls for Electrical Systems I. 26 05 53 - Identification for Electrical Systems J. 26 09 23 - Lighting Control Devices K. 26 12 00 - Medium-Voltage Transformers L. 26 13 00 - Medium-Voltage Switchgear M. 26 22 13 - Low-Voltage Distribution Transformers N. 26 24 16 - Panelboards O. 26 27 26 - Wiring Devices P. 26 28 13 - Fuses Q. 26 28 16 - Enclosed Switches and Circuit Breakers R. 26 31 00 - Photovoltaic Collectors S. 26 32 13.17 - Gaseous Engine Generators T. 26 36 00 - Transfer Switches U. 26 51 19 - LED Interior Lighting V. 26 52 13 - Emergency and Exit Lighting W. 26 56 13 - Lighting Poles and Standards X. 26 56 19 - LED Exterior Lighting 2.19 DIVISION 27 -- COMMUNICATIONS A. 27 05 26 - Grounding and Bonding for Communications Systems B. 27 05 28 - Pathways for Communications Systems C. 27 05 29 - Hangers and Supports for Communications Systems D. 27 05 36 - Cable Trays for Communications Systems E. 27 05 43 - Underground Pathways and Structures for Communication Systems F. 27 05 44 - Sleeves and Sleeve Seals for Communications Pathways and Cabling G. 27 0548.16 FL - Seismic Controls for Communications Systems H. 27 05 53 - Identification for Communications Systems I. 27 11 00 - Communications Equipment Room Fittings J. 27 11 16 - Communications Racks_ Frames_ and Enclosures 2.20 DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY 815065 00 01 10 - 5 TABLE OF CONTENTS SLC Mosquito Abatement District A. 28 15 00 - Access Control Hardware Devices B. 28 20 00 - Video Surveillance C. 28 46 21 - Addressable Fire-Alarm Systems 2.21 DIVISION 31 -- EARTHWORK A. 31 07 00 - General Site Construction Requirements B. 31 20 00 - Earth Moving 2.22 DIVISION 32 -- EXTERIOR IMPROVEMENTS A. 32 12 16 - Asphalt Paving B. 32 13 13 - Concrete Paving C. 32 13 73 - Concrete Paving Joint Sealants D. 32 20 00 Site Signage E. 32 31 13 - Chain Link Fences and Gates F. 32 84 00 - Planting Irrigation G. 32 91 13 - Soil Preparation H. 32 92 00 - Turf and Grasses I. 32 93 00 - Plants 2.23 DIVISION 33 -- UTILITIES A. 33 05 00 - Common Work Results for Utilities B. 33 4111 - Site Storm Utility Drainage Piping 2.24 DIVISION 46 -- WATER AND WASTEWATER EQUIPMENT END OF SECTION 00 01 10 815065 00 01 10 - 6 TABLE OF CONTENTS
Description: