ebook img

ruidp sor 2013 PDF

520 Pages·2013·5.02 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview ruidp sor 2013

Government of Rajasthan Local Self Government Department RAJASTHAN URBAN INFRASTRUCTURE DEVELOPMENT PROJECT (RUIDP) INTEGRATED SEPTEMBER - 2013 SCHEDULE Of RATES Project Management Unit (PMU) Rajasthan Urban Infrastructure Development Project, Rs. 1000/- AVS Building, Jawahar Circle, Malviya Nagar, Jaipur-17 GOVERNMENT OF RAJASTHAN RAJASTHAN URBAN INFRASTRUCTURE DEVELOPMENT PROJECT (RUIDP) INTEGRATED SCHEDULE OF RATES SEPTEMBER - 2013 Issued By Project Director RUIDP JAIPUR (Raj) Price : Rs. 1000/- RUIDP ii SOR SEPTEMBER 2013 FOREWORD RUIDP has prepared an updated comprehensive integrated SoR for year 20013. This has been prepared as per need assessment of the ADB in the project approval of RUIDP Phase– II. It was a challenge for the team of RUIDP to collect market rates for the basic materials and work out the rate analysis for each item to be incorporated in the SoR. The market rates of the basic material has changed substantially in last two years; so it became necessary to update the existing SoR– 2011 with incorporation of items required for the estimation and other uses for urban sector works implemented under RUIDP. Unban sector needs typical nature of infrastructure works, which requires extensive Schedule of Rates catering all the sectors. Engineers of RUIDP through its learning and experience has made an effort by accommodating various items for the different nature of works. Sewerage items are not available in any of the Schedule of Rates; separate chapter is added with exhaustive items to be useful for the agencies working in this sector. Heritage sector has also been made part of this SoR, 2013. I hope that SoR, Sep- 2013 would be equaly useful in the other department of the state. This Schedule Rates has been prepared by M/s Ojasvi Software New Delhi under the supervision and over all guidance of Er. G.L. Agarwal, Additional Project Director and chairman Technical Committee. I would like to put on record my appreciation for the dedicated and untiring efforts made by the Team RUIDP associated in preparation of RUIDP Integrated SoR, Sept- 2013. Schedule of Rates, 2013 is approved by the RUIDP and is made effective form 01- 10-2013. Project Director RUIDP, Jaipur RUIDP iii SOR SEPTEMBER 2013 PREFACE The Rajasthan Urban Infrastructure Development Project (RUIDP) has prepared Integrated Schedule of Rates Sept – 2013, for the works to be implemented under its umbrella with the intention to accommodate various items related to multi-sector urban infrastructure works considering larger interest of urban sector development works under UDH & LSGD. It was also intended that the estimation based on this SOR will provide the updated cost estimates for the benefit of analysis’s and guidance to different stakeholders in their assessments. The updating/modification of earlier SoR, 2011 was primarily required due to substantial increase in rates of basic material; labour; steel; petroleum products; transportation and other materials. There had been learning’s of RUIDP during its use; and accordingly new separate chapters for sewerage and Heritage works has been incorporated apart from addition of some new items which are generally required for use during execution of such works. The team of engineer’s having sectoral experiences were constituted to assess the market rate by approaching the vendor’s personally or on phone/mail, receiving quotations, price lists etc. to the maximum possible extent. The present basic rates of material/ equipments/ labour etc. have been procured from the various sources i.e. available schedule of rates of different departments i.e. PWD, MORTH, Archeological, CPWD & codes of Bureau of India standard and Delhi Schedule of Rates (DSR) etc. The support of Manufacturers/venders/suppliers has made us comfortable to reach at reasonable rates of the materials by providing their rates/catalogues. Though best efforts has been made to procure the present basic rates of every item; however few vendors were reluctant to provide any written document for the support of rates and accordingly rates of some items could not be directly received from the market. Such items have been arrived on the basis of earlier BSR rates & experience with suitable adjustments. Regular meetings were held with all RUIDP engineers and consultants working with RUIDP for detailed discussions & to freeze the rates of basic material and nomenclature of the items. The Electrical BSR has been adopted with modification in the existing Electrical BSR of State PWD-2012 considering the major changes prevailing in the rates of metals / materials. The rates of items has been arrived after due consideration of the likely overheads including financial charges for execution and reasonable contractor’s profit in their rate analysis. The basic rates have been collected from various sources generally in between April -2013 to June- 2013. These rates are therefore likely to reflect the rates actually prevailing in the market in June-2013. However the future trend in costs is to be watched by all concern for preparation of their updated estimates. I am gratified for the input of Sh. O.M. Rajotiya, Financial Advisor & Er. S. K. Asopa, Dy. PD (T) and subject expert consultant’s working with RUIDP for their valuable suggestions and refinement of SoR. This attempt had been successful only due to the extensive efforts of Engineers of RUIDP working in different sectors by ensuring RUIDP v SOR SEPTEMBER 2013 incorporation of related sectoral items & their proper nomenclature in the SoR namely; Superintending Engineers - Er. B.M. Lakwal, Er. Anil Sharma, Er. Ashok Choudhary, Er. Laduram Vishnoi and Executive Engineers - Er. Praveen Ankodia, Er. D. R. Jangid supported by the team of engineers. The task have been completed for its substantial revision in true sprit with the extensive work of supporting colleagues; Er. Rakesh Garg, Er. S. S. Khiria, Er. D K Mittal, Er. K. C. Agarwal, Er. Mahesh Garg, Er. Anil Vijayvargiya, Er. Anil Sharma, Er. L. S. Shekhawat apart from enthusiasm of participation by new Engineer’s recently joined the team RUIDP. The M/s Ojasvi Software, New Delhi with its experience of preparation of SoR for different states/departments has also made valuable contribution in understanding of items, rate analysis, market rates for basic materials and designing of the Integrated SOR-2013 for RUIDP. This Integrated Schedule of Rates, Sept-2013 has been prepared to cater the needs of Urban Infrastructure Development to accommodate the various schedules of rates for estimation, evaluation etc. Although every care has been taken, yet in such complex work like this, it is possible that typographical or other error or omissions have crept in; suggestion for improvement and corrections in this integrated SOR / future modifications will be most welcomed from all quarters. This Integrated Schedule of Rates 2013 has been prepared successfully under valuable guidance of Dr. Prithvi, Project Director RUIDP, Jaipur. This work has been made possible due to the earnest efforts of persons who have also helped directly or indirectly to complete this work are also thankfully acknowledged. (Er. G. L. Agarwal) Chief Engineer cum Addl. Project Director RUIDP, Jaipur RUIDP vi SOR SEPTEMBER 2013 CONTENTS PAGE S. No NAME OF CHAPTER/ SUBHEAD NO. COMMON WORKS 1 CARRIAGE OF MATERIALS 1 2 SITE CLEARANCE 3 3 DISMANTLING 7 4 EARTH WORK 11 SURVEY, TESTING, INVESTIGATION AND SITE 5 OFFICE 17 6 MORTARS 23 ROAD WORKS 7 ROAD WORKS (Sub-base/ Bases) 25 8 ROAD WORKS (Bituminous Bases) 27 9 CEMENT CONCRETE PAVEMENTS 33 TRAFFIC SIGNS, MARKINGS & OTHER ROAD 10 APPURTENANCES 37 11 PIPE CULVERTS 41 12 MAINTENANCE OF ROADS 43 BRIDGE WORKS 13 FOUNDATIONS 45 14 SUB-STRUCTURE & SUPER-STRUCTURE 55 15 RIVER TRAINING & PROTECTION WORKS 65 16 REPAIR & REHABILITATION 67 RUIDP vii SOR SEPTEMBER 2013 PAGE S. No NAME OF CHAPTER/ SUBHEAD NO. 17 SEWER LINE WORKS 69 18 STP (Sewage Treatement Plant) 97 19 WATER SUPPLY 107 20 TUBE WELL 139 BUILDING WORKS 21 CONCRETE WORK 141 22 FORM WORK 145 23 REINFORCED CEMENT CONCRETE 147 24 BRICK WORK 151 25 STONE WORK (Masonry) 155 26 STONE WORK (Slabs) 157 27 MARBLE WORK 161 28 WOOD AND PVC WORK 163 29 STEEL WORK 183 30 FLOORING 187 31 ROOFING 193 32 FINISHING 201 33 REPAIRS TO BUILDINGS 209 34 WATER SUPPLY (Building) 217 35 DRAINAGE (Building) 231 36 SANITARY INSTALLATIONS 237 37 ALUMINIUM WORK 249 38 WATER PROOFING 253 39 HORTICULTURE 259 40 HERITEGE WORK 265 RUIDP viii SOR SEPTEMBER 2013

Description:
level precast pre/post-tensioned specified grade girders complete as per drawing and clause 1800 & 2300 of MoRT&H specifications including all material cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.