ebook img

REIA Report for Almas Ayurvedic Resort, Purathur PDF

140 Pages·2015·5.06 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview REIA Report for Almas Ayurvedic Resort, Purathur

REIA Reportfor Almas Ayurvedic Resort, Purathur Table of Contents INTRODUCTION.....................................................................................................................8 1.1. Purpose of the Report.............................................................................................................8 1.2. Profile of Project Proponent...................................................................................................8 1.3. Contact Details of the Project Proponent...............................................................................9 1.4. Project Implementing Organization........................................................................................9 1.5. Project Consultants.................................................................................................................9 1.6. Description of Land...............................................................................................................10 1.7. Environmental Regulations Applicable to the Project..........................................................10 1.7.1. Environmental Regulations of Government of India....................................................10 1.7.2. Environmental Regulations of StateGovernment........................................................11 1.8. National Environmental Standards Relevant to the Project.................................................11 1.9. Details of Litigations Pending against the Project................................................................15 PROJECT DESCRIPTION......................................................................................................16 2.1. Objective of the Project........................................................................................................16 2.2. Significance of the Project....................................................................................................16 2.3. Overall Suitability of Site.......................................................................................................16 2.4. Need for the Study................................................................................................................17 2.5. Project Location....................................................................................................................17 2.5.1. Description of Environmental Sensitive Areas around Project Site..............................24 2.6. Land Use Profile of Project Region........................................................................................26 2.7. Topographical Features of the Proposed Site.......................................................................26 2.8. Project Description................................................................................................................28 2.8.1. Administrative Block.....................................................................................................32 2.8.2. Second Block.................................................................................................................35 2.8.3. Restaurant Building.......................................................................................................35 2.8.4. Other Supporting Facilities...........................................................................................39 2.8.4.1. Badminton Court...................................................................................................39 2.8.4.2. Pool.......................................................................................................................41 2.8.4.3. Boat Jetty..............................................................................................................42 2.8.4.4. Parking Facilities....................................................................................................42 2.8.4.5. Landscape..............................................................................................................42 2.8.4.6. Sewage Treatment................................................................................................43 \\Datalibrary-1\2014-15\DP-753 1 REIA Reportfor Almas Ayurvedic Resort, Purathur 2.8.5. Natural Resources Requirement...................................................................................47 2.8.6. Manpower Requirement...............................................................................................48 2.8.7. Project Implementation Schedule................................................................................48 DESCRIPTION OF THE ENVIRONMENT..........................................................................51 3.1. Study Area.............................................................................................................................51 3.2. Baseline Environmental Profile of Project Region................................................................53 3.2.1. Land Environment.........................................................................................................53 3.2.1.1. Physiography.........................................................................................................53 3.2.1.2. Soil.........................................................................................................................56 3.2.2. Water Environment.......................................................................................................57 3.2.2.1. Drainage................................................................................................................57 3.2.2.2. Hydrogeology........................................................................................................57 3.2.2.3. Seismicity..............................................................................................................60 3.2.3. Air Environment............................................................................................................61 3.2.3.1. Rainfall and Climate..............................................................................................61 3.2.3.2. Temperature.........................................................................................................62 3.2.3.3. Relative Humidity..................................................................................................63 3.2.3.4. Wind Speed and Wind Direction...........................................................................63 3.2.3.5. Ambient Air Quality...............................................................................................63 3.2.4. Noise Environment........................................................................................................64 3.2.5. Biological Environment.................................................................................................64 3.2.6. Socio Economic Environment.......................................................................................65 3.2.7. Solid Waste...................................................................................................................66 IMPACT ANALYSIS AND MITIGATION MEASURES.....................................................67 4.1. Activities during Construction Phase....................................................................................67 4.2. Activities during Operation Phase........................................................................................67 4.3. Identification of Impacts of Onsite Activities on Various Environmental Attributes............67 4.3.1. Land Environment.........................................................................................................68 4.3.2. Water Environment.......................................................................................................69 4.3.3. Air Environment............................................................................................................73 4.3.4. Noise Environment........................................................................................................74 4.3.5. Biological Environment.................................................................................................75 4.3.6. Socio Economic Environment.......................................................................................76 4.3.7. Solid Waste Management.............................................................................................77 \\Datalibrary-1\2014-15\DP-753 2 REIA Reportfor Almas Ayurvedic Resort, Purathur 4.4. Identification of Impacts of Offsite Activities............................................................................78 ALTERNATIVE TECHNOLOGIES......................................................................................80 ENVIRONMENTALMONITORING PLAN.........................................................................81 6.1. Block Cost Estimate for Implementing EMP.........................................................................83 ADDITIONAL STUDIES.......................................................................................................86 7.1. Introduction..........................................................................................................................86 7.2. Disaster Management Plan in India......................................................................................86 7.3. Disaster Management for Almas..........................................................................................88 7.3.1. Risk Assessment............................................................................................................88 7.3.2. Objective of Disaster Management Plan......................................................................89 7.3.3. Various Stakeholders in Disaster Management............................................................90 7.3.4. InstitutionalResponsibility............................................................................................90 7.3.5. InstitutionalArrangements...........................................................................................91 7.3.5.1. Pre-DisasterPreparedness....................................................................................91 7.3.5.2. Emergency Management System during Disaster................................................92 7.3.5.3. Post Disaster Management...................................................................................97 7.3.6. Plan update and Review................................................................................................97 7.3.7. Training & Drills.............................................................................................................97 PROJECT BENEFITS.............................................................................................................98 ENVIRONMENTAL MANAGEMENT PLAN....................................................................100 SUMMARY AND CONCLUSIONS....................................................................................114 DECLARATION BY EXPERTS..........................................................................................116 ANNEXURES.......................................................................................................................126 Annexure I. Soil Monitoring Results.......................................................................................127 Annexure II. Water Quality Monitoring Results.....................................................................130 Annexure III. Air Quality Monitoring Results...........................................................................135 AnnexureIV. Noise Quality Monitoring Results.......................................................................138 \\Datalibrary-1\2014-15\DP-753 3 REIA Reportfor Almas Ayurvedic Resort, Purathur List of Tables Table 1.1. Details of the Project Proponent........................................................................................9 Table 1.2. Details of the EIA consultancy Organization.......................................................................9 Table 1.3. Details of Land Proposed for Development of Resort......................................................10 Table 1.4. Rules and Acts Applicableto the Proposed Project..........................................................10 Table 1.5. Ambient Air Quality Standards.........................................................................................11 Table 1.6. Ambient Noise Quality Standards.....................................................................................12 Table 1.7. Indian Standard Specifications for Drinking Water...........................................................12 Table 1.8. General Standards for Discharge of Environmental Pollutants........................................13 Table 2.1. Administrative Setting of Proposed Ayurvedic Resort Location.......................................18 Table 2.2. CRZ Categorization of Project Area...................................................................................24 Table 2.3 Area Statement for the Resort..........................................................................................30 Table 2.4. List of Facilities Provided in the Administrative Block......................................................32 Table 2.5. Area Statement for Proposed Administrative Block.........................................................32 Table 2.6. List of facilities provided in Second Block.........................................................................35 Table 2.7. Area Statement of Proposed Second Block......................................................................35 Table 2.8. Area Statement of Proposed Restaurant..........................................................................35 Table 2.9. Characteristics of Combined Raw Sewage and Treated Water........................................43 Table 2.10. Water and Material Quantity during Construction Phase............................................47 Table 2.11. Abstract of Manpower Requirement for Construction Phase......................................48 Table 2.12. Abstract of Manpower Requirement for Operation Phase..........................................48 Table 3.1. Descriptionof Monitoring Locations................................................................................53 Table 3.2. Soil Quality Monitoring Result..........................................................................................57 Table 3.3. Water Monitoring Results.................................................................................................59 Table 3.4. Ambient Air Quality Monitoring Results...........................................................................63 Table 3.5 Noise Monitoring results...................................................................................................64 Table 3.6. Vegetation Cover Observed in Project Area.....................................................................64 Table 4.1. Proposed Solid Waste Handling Plan for Construction and Operation Phases................77 Table 4.2. Environmental Factors Affected and Outcome of the Proposed Project Site..................79 Table 6.1. Environmental Monitoring Plan........................................................................................81 Table 6.2. Cost Estimate of Implementing Environmental Monitoring for Construction and Initial Three Years of Operation......................................................................................................................83 Table 6.3. Block Cost Estimate for Implementing EMP.....................................................................85 Table 7.1. Proposed Emergency Management Team for Almas Resort............................................93 Table 7.2. Emergency Contact List to be maintained by Resort........................................................96 Table 9.1. Environmental Management Plan..................................................................................102 \\Datalibrary-1\2014-15\DP-753 4 REIA Reportfor Almas Ayurvedic Resort, Purathur List of Figures Figure 2.1. Location Map of the Proposed AyurvedicResort.........................................................18 Figure 2.2. Project Site with Immediate Surroundings...................................................................19 Figure 2.3. View of the Project Site from the North West Corner..................................................19 Figure 2.4. View of the Project Site from the South West Corner..................................................20 Figure 2.5. View of the Project Site from the Centre to the Eastern Side......................................20 Figure 2.6. View of the river from the South East Corner...............................................................21 Figure 2.7. View of the Project Site from the North East Corner...................................................21 Figure 2.8. View of the Project Site from the South East Corner....................................................22 Figure 2.9. CRZ Map of Project Area prepared by NIES, Trivandrum.............................................23 Figure 2.10. Map showing the sensitive areas around the 1km of the project boundary...............25 Figure 2.11. Land Use Map of the Project Area................................................................................26 Figure 2.12. Contour Map of Proposed Location..............................................................................27 Figure 2.13 Layout of ProposedResort............................................................................................29 Figure 2.14 Area Occupied by Various Components of Resort........................................................31 Figure 2.15. Elevation and Ground Floor Plan of Proposed Administrative Block...........................33 Figure 2.16. Section and First Floor Plan of Proposed Administrative Block....................................34 Figure 2.17. Section Plan of Proposed Second Block........................................................................36 Figure 2.18. Section and Ground Floor Plan of the Proposed Restaurant........................................37 Figure 2.19. Elevation and First Floor Plan of the Proposed Restaurant..........................................38 Figure 2.20. Sectional View and Plan ofProposed Badminton Court................................................40 Figure 2.21. Front View, Sectional View and Plan Proposed Swimming Pool..................................41 Figure 2.22. Elevation and Plan of Proposed Boat Jetty...................................................................42 Figure 2.23. Flow Diagram of Proposed STP.....................................................................................45 Figure 2.24 Proposed Rain Water Harvesting Facility......................................................................47 Figure 2.25. Project Schedule of the Construction of the Proposed Ayurvedic Resort....................50 Figure 3.1. Google Map showing 500 mRadius of the Proposed Site.............................................52 Figure3.2. MonitoringLocations in the Proposed Site...................................................................53 Figure 3.3. Relief and Slope of the Project location at Purathur....................................................55 Figure 3.4. Soils of the Project Location at Purathur......................................................................56 Figure 3.5. Irrigation and Hydrogeology of the Project Location at Purathur................................58 Figure 4.1. Water Balance Statement for Construction Phase.......................................................70 Figure 4.2. Water Balance Statement for Operation Phase...........................................................71 Figure 7.1. Structure of Emergency Management Team................................................................93 Figure 7.2. Responsibility Allocation within EMT during Emergency.............................................95 \\Datalibrary-1\2014-15\DP-753 5 REIA Reportfor Almas Ayurvedic Resort, Purathur ABBREVIATIONS BOD - Biochemical Oxygen Demand COD - Chemical Oxygen Demand CPCB - Central Pollution Control Board CRZ - Coastal Regulation Zone dB - Decibel DG - Diesel Generator DMP - Disaster Management Plan EGSB - ExpandedGranular Sludge Bed EIA - Environmental Impact Assessment EMC - Electronic Manufacturing Cluster EMP - Environmental Management Plan EMT - Emergency Management Team ERC - Emergency Response Center GRIHA - Green Rating for Integrated Habitat Assessment HTL - High Tide Line KSEB - Kerala State Electricity Board KSPCB - Kerala State Pollution Control Board kV - Kilo Volt MoEF - Ministry of Environment and Forests NDMA - National Disaster Management Authority NDZ - Non developmentZone PCB - Pollution Control Board PIO - Project Implementing Organization PIZ - Project Impact Zone PUC - Pollution-under–check R.O - Reverse Osmosis Plant \\Datalibrary-1\2014-15\DP-753 6 REIA Reportfor Almas Ayurvedic Resort, Purathur RCC - Reinforced Cement Concrete RWH - Rain Water Harvest SPCB - StatePollution Control Board STP - Sewage Treatment Plant \\Datalibrary-1\2014-15\DP-753 7 REIA Reportfor Almas Ayurvedic Resort, Purathur 1 INTRODUCTION 1.1. Purpose of the Report Almas Ayurvedic Hospitals and Research Center Private Ltd., with head quarters at Kottakkal, Malappuram district, Kerala, proposes to develop a resort in their available land of 2.1ha at Purathur Grama Panchayath, Tirur, Malappuram District. The land parcel is ideally suited for developing a resort within a village setting having direct access to back water and the sea shore in close proximity. The project proposal is to establish a resort with facilities for rejuvenation for the inmates in the Ayurvedic system. Though the project involves development of buildings of 5056.87sqm with a total capacity of 138 inmates and staff at a time, the construction and operation phase can have direct and indirect impacts on the environment. Since the project area falls within Coastal Regulation Zone III, as per the CRZ Notification 2011, S.O .19 (E), an environmental impact assessment study is carried out to support the application for environmental clearance under the said notification. The main objectives of the EIA Report are as below:  To document the baseline environmental and social profile of the Project Impact Zone (PIZ) based on primary and secondary data.  To identify and evaluate the impacts on the baseline environmental and social profile of the Project Impact Zone due to the proposed project activities during pre-construction, construction and operation phases.  To identify the requirements of various environmental regulations applicable to the project.  To prepare an Environmental Management Plan (EMP) to mitigate or minimize the adverse impacts of the project and an Environmental Monitoring Plan to quantify the impacts during construction and operation. 1.2. Profile of Project Proponent M/s. Almas Ayurvedic Hospitals and Research Center is a Private Limited company having its Head Office at Kottakkal, Malappuram district, Kerala, is the project proponent. The project proponent has been in the services with health care sector and has established a hospital at Kottakkal. The existing hospital at Kottakkal has both the facilities for Allopathic and Ayurvedic Treatment. Taking in to consideration of the increased choice of the visitors from abroadfor holidaying in Kerala, and looking \\Datalibrary-1\2014-15\DP-753 8 REIA Reportfor Almas Ayurvedic Resort, Purathur for traditional herbal wellness centers, M/s. Almas proposes to develop a resort in the available land in Purathur Grama Panchayath. M/s KITCO Ltd, an accredited organization under QCI-NABET MoEF is entrusted by M/s. Almas, the task of carrying out Environmental scheme and Social Impact Assessment for the proposed Ayurvedic Resort. 1.3. Contact Details of the Project Proponent The proposed project is at Malappuram District in Kerala. The proponent has registered office at Kottakkal, Malappuram. Table1.1. Details of the Project Proponent Sl. No. Particulars Description 1 Contact Address Dr.AhamedKabeer Chairman &Managing Director # 1/215 D, Al Madeena Institute of Medical Science, Changuvetty, Kottakkal (P.O) Malappuram district 676503 2 Phone 0483-2809100 3 E-mail ID [email protected] 1.4. Project Implementing Organization The project proponent willact as the Project Implementing Organization (PIO) in this project. As this is aresort project which takes onlyabouttwo years to complete, the proponent will assign the work to local contractors who can complete the construction work of buildings and related facilities. 1.5. Project Consultants KITCO Ltd. is the consultancy organization for conducting an EIA study for obtaining clearance under CRZ Notification, 2011for the project. Table1.2provides the contact details of the project consultant. Table1.2. Details of theEIA consultancy Organization Sl. No. Particulars Description 1 Contact Address KITCO Ltd, Femith’s, P.B No:4407, Puthiya Road, NH Bypass, Vennala, Kochi-682028 2 Phone (0484)4129000 3 Fax (0484)2805066 4 E-mail ID [email protected] \\Datalibrary-1\2014-15\DP-753 9 REIA Reportfor Almas Ayurvedic Resort, Purathur 1.6. Description of Land Land details as per the revenue records are presented in Table 1.3. Table 1.3. Details of Land Proposed for Development of Resort Sl.No Item Details 1. Survey Numbers 8/1A9, 8/1A10, 8/1B2 2. Village Purathur 3. Tehsil Tirur 4. District Malappuram 5. State Kerala 6. Total area of land 2.1ha 7. GPS Coordinates of Boundaries NWCorner 10°49’30.71” N, 75°54’17.02”E SW Corner10°49’27.55”N, 75°54’17.65” E NE Corner 10°49’31.39”N, 75°54’24.45” E SE Corner 10° 49’29.89”N, 75°54’25.96”E 1.7. Environmental Regulations Applicable to the Project A review of the project relevant legal policies, regulations and institutions relevant to the project at National and State levels are presented in this Section. Applicable clearances required for the project under various regulations and role of various institutions in implementing various regulations and environmental managementmeasuresare enlisted. 1.7.1.Environmental Regulations of Government of India The Indian constitution makes environmental protection an explicit duty for every citizen by the statement, “It shall be duty of every citizen of Indiato protect and improve the environment including forests, lakes, rivers, wild life, etc. and to have compassion for living creatures”. In addition, Government of India has laid out various policy guidelines, acts and regulations pertaining to sustenance of environment. As per the Indian environmental acts and regulations, following acts and regulations are applicable for the project. Acts such as The Forest (Conservation) Act, 1980, Wetland Conservation Act 2010 and EIA Notification, 2006 are not applicable to this project. The Acts and Regulations applicable are enlisted inTable 1.4. Table 1.4. Rules andActsApplicable to theProposed Project Sl.No Applicability of Acts / Guidelines Compliance Criteria 1. Coastal Regulation Zone Prior clearance to be obtained from MoEF Notification, 2011 through recommendation from Kerala State Coastal Zone Management Authority. 2. The Water (Prevention & Control of Consent to Establish and Consent to Operate to Pollution) Act, 1974 be obtained from Kerala State Pollution \\Datalibrary-1\2014-15\DP-753 10

Description:
Malappuram district, Kerala, proposes to develop a resort in their available land of 2.1ha at Purathur. Grama Panchayath, Tirur Table1.2provides the contact details of the project consultant. Table 1.2. Details of the EIA consultancy Organization. Sl. No. Particulars. Description. 1. Contact Addre
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.