ebook img

REFERENCES Abd. Majid, MZ, & McCaffer, R. (1988). PDF

54 Pages·2012·3.53 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview REFERENCES Abd. Majid, MZ, & McCaffer, R. (1988).

REFERENCES Abd. Majid, M. Z., & McCaffer, R. (1988). Factors on non-excusable delays that influence contractors’ performance. Journal of Management in Engineering, Vol. 14, No.3, 42-49. Ahmed SM, Azhae S, Kappagntula P, Gollapudial D (2003). Delays in construction: A brief study of the Florida construction industry. Proceeding of the 39th Annual ASC Conference, Clemson University, Clemson, SC, pp. 257-266. Ali, S.A., Rahmat,I.& Hassan,H.(2008).Involvement of key design participants in refurbishment design process, Facilities. Emerald, UK. Vol. 26 No. 9/10 pp 389- 400 Ali, S.A., Rahmat,I. & Noorhashimah N.(2006). Information in the design process of refurbishment projects. 5th MICRA 2006, Kulliyyah of Architecture and Environmental Design, UIAM, 20-21 June 2006, pp 128-400 Ali, S.A., Rahmat,I. & Noorhashimah, N. (2006).Integrative mechanisms in the design process of refurbishment projects. International Conference of the Built Environment in the 21st Century, Renaissance Hotel Kuala Lumpur, 13-15 June 2006, pp 699-708 Ali, S.A.& Rahmat,I. (2009). Coordination Methods in Managing the Design Process of Refurbishment Projects. Journal of Building Appraisal Palgrave, UK. pp. 87-98 Ali. S.A, Syahrul N. K & Salleh, H. (2009) "The characteristics of refurbishment projects in Malaysia", Facilities, Vol. 27 Iss: 1/2, pp.56 – 65 Al-Momani, A. H. (2000). Construction delay: quantitative analysis. International Journal of Project Management, 18, 51-59. Andi & Minato, T. (2003a). Design documents quality in Japanese construction industry. International Journal of Project Management, Vol. 21, 537-546. Andi & Minato, T. (2003b). Representing causal mechanism of defective designs: a system approach considering human errors. Journal of Construction Management and Economics, Vol. 21, 297-305. Andi, & Minato, T. (2004). Representing causal mechanism of defective designs: Exploration through case studies. Journal of Construction Management and Economics, Vol. 22, 183-192. 145 Arain, F.M. and Low, S.P. (2005), “The potential effects of variation orders on institutional building projects”, Facilities. Emerald, UK. Vol. 23 No. 11/12 pp. 496-510. Arditi, D., & Gunaydin, H. M. 1977. Total quality management in the construction process. International Journal of Project Management, Vol. 14, No.2, 81-87. Arditi, D., Koksal, A., & Kale, S. 2000. Business failure in the construction industry. Engineering, Construction and Architectural Management, Vol. 7, No. 2, 120- 132. Ashley, D.B. (1986), “ new trends in risk management”, paper presented at the internet’s 10th International Expert Seminar on New Approaches in Project Management, Zurich, 10-12 March. Assaf, S. A., Al-Khalil, M., & Al-Hazmi,M. (1994). Causes of delay in large building construction projects. Journal of Managementin Engineering, Vol.11, No.2, 45- 50. Atkinson, R. (1999), “Project management: cost, time and quality, two best guesses and a phenomenon, it’s time to accept other success criteria”, International Journal of Project Management, Vol 17 No, 6, pp, 337-42. Babbie, E. R. (2003). The practice of social research. California: Wadsworth Publishing Company, Inc. Baccarini, D. (1996). The concept of project complexity- a review. International Journal of Project Management, Vol. 14, No. 4, 201-204. Baccarini, D.(1999). The logical framework method for defining project success. Project Management Institute, Vol.30, No 4, 25-32. Baldwin, A. N., Austin, S. A., Hassan, T. M. & Thorpe (1999). Modelling information flow during the conceptual and schematic stages of building design. Journal of Construction Management and Economics, Vol.17, 155-167. Baldwin, J.D., Manthei, J.M., Rothbart, H., & Harris, R.B. (1971). Causes of delay in construction industry. Journal of Construction Division, ASCE, Vol.97, No.C02, 177-187. 146 Bassioni, H.A., Price, A.D.F. & Hassan, T.M. (2005). Building a conceptual framework for measuring business performance in construction: an empirical evaluation. Journal of Construction Management and Economics, Vol. 18, 73-182. Beckmann, P. & Bowels, R. (2004). Structural Aspects of Building Conservation. Elsevier Butterworth-Heinemann Ltd, Oxford. Beger, H., Wolf, H.F. & Ullmann, E. 1989. Handbook der Sozialistischen Forschung. Methodologies, Method, Techniques, Berlin: Academy Verlag. Bennett, J. & Fine, (1980). Measurement of complexity in construction projects. Journal of Construction Management and Economics, Vol.2, 225-263. Bennett, J. (1983). Office Refurbishment: Contracts and Organization. Architects Journal, 178(48), 69-70. Bennett, J. (1991). International construction project management general theory and practice. Butterworth-Heinemann Ltd, Oxford. Bennett, J. (2002). Construction the third way. Butterworth-Heinemann Ltd, Oxford. Bloomberg, I. (1992). Careful renovation-obstacle and possibilities, Proceeding innovations in management, maintenance & modernisation of building, 28-30 Oct. 1992 Rotterdam-Holland, Vol. 4 Theme 6, Paper 6.5. Building Research Establishment (BRE) (2002) Tall Buildings and Sustainability Report, BRE, London, UK. Bouma, G., Atkinson, G. (1995). Social Science Research: a comprehensive and practical guide for students (2nd ed.) Oxford: Oxford University Press. Boyd, D. & Weaver, O.P. (1994). Improving the management and operation of refurbishment projects, Proceedings of the 10th. ARCOM Annual Conference, 14- 16 September, 1994, Loughbrough University of Technology, UK. Brandon, P.S. and Powell, J.A. Quality and profit building design E & F N Spon, London. Pp 339-349 Building And Construction Authority (2010). Contract Administration Public Sector Standard Of Contract For Construction Works. 147 Burati, J.L., Farrington, J.J. & Ledbetter, W.B. (1992). Causes of quality deviation in design and construction. Journal of Construction Engineering and Management Vol. 118, No. 1, 34-49. Casley, D.J., and K. Kumar. 1988. The collection, Analysis and Use of Monitoring and Evaluation Data. Baltimore, MD: Johns Hopkins University Press for the World Bank. Chalabi, A.F., & Camp, D. (1984). Causes of delays and overruns of construction projects in developing countries. Proceedings of the CIB, W65, Vol 3, 723-734. CIDB, (2007). Construction quarterly statistical bulletin- fourth quarter 2006. CIDB, Malaysia. Clancy, B. P. (1995). New building from old: some views of refurbishment projects. Journal of The Structural Engineer. Vol. 73, No. 20/17, 341-346. Clancy, B.P. (1994). The role of the structural engineer in maintaining the built environment. Journal of The Structural Engineer. Vol. 72, No. 21/1, 365-368. Coles, J.E., 1990. Design Management: A study of practice in the building industry. Occasional Paper No. 40. The Chartered Institute of Building, Ascot UK. Cooper, R. & Press, M. (1995). The Design Agenda, A guide to successful design management. John Wiley and Sons, Inc, USA. Creswell, J.W. (1994). Research design: qualitative and quantitative approaches. Thousand Oaks, CA: Sage. Daoud, (1997). The Architect/Engineer’s role in rehabilitation work. Journal of Construction Engineering and Management Vol. 123, No. 1, 1- 5. Diekmann, J. E., & Girard, M.J. (1995). Are contract disputes predictable? Journal of Construction Engineering and Management, Vol. 121, No.4 355-363. Diekmann, J. E., & Nelson, M.C. (1985). Construction claims: frequency and severity. Journal of Construction Engineering and Management, Vol. 111, No.1, 74-81. 148 Dvir, D., Raz, T., & Shenhar, A.J. (2003). An empirical analysis of the relationship between project planning and project success. International Journal of Project Management, 21, 89-95. Economic Review Committee Sub-committee on Domestic Enterprises, 2011 Egan, J. (1998) Rethinking construction. Department of the Environment, Transport and the Regions. Egbu, C.O. (1994). Management education and training for refurbishment work within the construction industry, PhD thesis Department of Civil Engineering, University of Salford, UK. Egbu, C.O. (1995). Perceived degree of difficulty of management tasks in construction refurbishment work. Building research and information Vol. 23, No. 6, 340-344. Egbu, C.O. (1997) Refurbishment management: challenges and opportunities. Building research and information Vol. 25, No. 6, 338-347. Egbu, C.O. (1999) Skills, knowledge and competencies for managing construction refurbishment works. Journal of Construction Management and Economics 17, 29-43. Egbu, C.O., Young, B.A. & Torrance, V.B. (1996). Refurbishment management practices in shipping and construction industries- lesson to be learned. Building Research and Information Vol. 24, No. 6, 329-338. Egbu, C.O., Young, B.A. and Torrance, V.B. (1998). Planning and control processes and techniques for refurbishment management. Journal of Construction Management and Economics, Vol. 16, 315-325. Elinwa, A. U., & Joshua, M. 2001. Time – overruns factors in Nigerian construction industry. Journal of Construction Engineering and Management, Vol. 127, No. 5, 419-425. Erling S. Andersen, David Birchall, Svein Arne Jessen, Arthur H. Money, (2006) "Exploring project success", Baltic Journal of Management, Vol. 1 Iss: 2, pp.127 – 147 Friedman, D. & Oppenheimer, N. (1998). The design of renovations. W. W. Norton & Company New York, London. 149 Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries: Ghana as a case study. International Journal of Project Management, 21, 321-326. Gardiner, P.D., & Simmons, J.E.L. 1992. Analysis of conflict and change in construction projects. Construction Management and Economics, 10, 459-478. Georgy, M.E., Chang, L.M. & Zhang, L. (2005). Journal of Construction Engineering and Management Vol. 131, No. 5, 548-557. Global Construction 2020. (2009). Global Construction Perspectives and Oxford Economics. Griffith, A. F., Gibson Jr., E. G., Hamilton, M. R., Tortora, A. L., & Wilson, C.T.(1999). Project success index for capital facility construction projects. Journal of Performance of Constructed Facilities, Vol. 13, No.1, 39-45. Harris, C.M. (2006). Interior fit out of commercial office space. CPD Talk of The Chartered Institute of Building, November, Malaysia. Hashim, S., Kadir, M. R.A., Lew, Y.L., & Sim, Y.C. (2003). Estimation of minimum working capital for construction projects in Malaysia. Journal of Construction Engineering and Management, Vol. 129, No.4. 369-374. Hong, T.J. (2005). Statistical techniques in business research a practical approach. Pearson Prentice Hall, Malaysia. John, J.A., Whitaker, D. & Johnson, D.G. (2001). Statistical thinking for managers. Chapman and Hall/CRC, United States. Kagioglou, M., Cooper, R, and Aouad, G, 2001, “Performance management in construction: a conceptual framework:, Construction Management and Economics, Vol. 19 No. 1, pp. 85-95. Kaming, P. F., Olomolaiye, P.O., Holt, G. D., & Harris, F, 1997. Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15, 83-94. 150 Krejcie, R.V. & Morgan D.W. 1970. Determining sample size for research activities. Educational and Psychological Measurement, Vol. 30, 607-610. Krippendrof, F. (1980). Content analysis: an introduction to its methodology. Saga, London. Koontz, H. and O’Donnel, C. (1972). Principles of management: an analysis of managerial functions, 5th edition, McGraw-Hill, Tokyo. Pp 199-227 Kometa, S.T. Olomolaiye, P.O. & Frank, C.H. (1994). Attributes of UK clients influencing project consultant’s performance. Journal of Construction Management and Economics, Vol. 12, 433-443. Kumaraswamy, M. M. (1997). Conflicts, claims and disputes in construction. Engineering, Construction and Architectural Management, Vol. 4, No. 2 95-111. Kumaraswamy, M. M., & Chan, D. W. M. (1998). Contributors to construction delays. Construction Management and Economics, 16,17 -29. Latham, M. (1994). Constructing the Team. H.M.S.O. Laufer, A., Shapira, A. and Cohenca-Zall, D. (1993). Pre-bid and pre-construction planning process. Journal of Construction Engineering and Management, Vol. 119, No. 3, 426-443. Laufer, A., Tucker, R.L., Shapira, A., and Shenhar, A.J. (1994). The multiplicity concept in construction project planning, Construction Management and Economics, 11, 53-65. Lee, A., Cooper, R. and Aouad, G. (2000),” A methodology for designing performance measures for UK construction industry”, paper presented at Bizarre Fruit Postgraduate Research Conference on the Built and Human Environment, Salford. Lee, B., Bouchlaghem, D. & Austin, S. (2003). Design management in practice: testing a training initiative to deliver tools ad learning. Construction Innovation, Vol. 3, 217-229. Lee, Jae-Seob. 2007. Delay analysis using linear schedule in construction.AACE International Transactions. 151 Lee, J.H. (1996). Statistical deterioration models for condition assessment of older buildings, PhD thesis. Wayne State University, Nebr. Liaw, S.H. & Goh, K.L. (2002). Statistik asas: konsep & amalan. McGraw-Hill (Malaysia) Sdn. Bhd, Kuala Lumpur. Lind, D.A., Marchal, W.G. and Wathen, S.A. (2003). Basic Statistics For Business and Economics. McGraw Hill, United States. Lin, G. and Shen, Q., (2007). Measuring the performance of value management studies in construction critical review. Journal of Management in Engineering, ASCE, 23(1), 2-9. Liu, A.M.M., & Walker, A.(1998). Evaluation of project outcomes. Construction Management and Economics, 16, 209-219. Long, N.D., Ogunlana, So.O., & Lan, D.T.X. (2004a). A study on project success factors in large construction projects in Vietnam. Journal of Engineering, Construction and Architectural, 11. 404-413. Love, P.E.D. & Edwards, D.F. (2004). Determinants of rework in building construction projects. Journal of Engineering, Construction and Architectural Management, Vol. 11, No. 4, 259-274. Love, P.E.D. & Wyatt, A.D. (1997). Communication and rework: Case studies of construction projects, CSIRO. DBCE DOC 97/38 (B), Australia. Love, P.E.D., Holt, G.D. & Li, H. (2002). Triangulation in construction management research. Journal of Engineering, Construction and Architectural Management, Vol. 9, N0. 4, 294-303. Love, P.E.D., Mandal, & Li, H. (1999), Determine the causal structure of rework influences in construction. Journal of Construction Management and Economics, Vol. 17, 505-517. Love, P.E.D., Mandal, P. Smith, J. & Li, H. (2000). Modelling the dynamics of design error induced rework in construction. Journal of Construction Management and Economics, Vol. 18, 567-574. 152 Love, P.E.D., Skitmore, M. & Earl, G. (1998). Selecting a suitable procurement method for a building project. Journal of Construction Management and Economics, Vol. 16, 221-233. Mahr, W. 1995. Politishe struktur der sozialforschung. Leipzig:Selbstverlag. Manavazhi, M.R. & Xunzhi, Z. (2001). Productivity oriented analysis of design revisions. Journal of Construction Management and Economics, Vol. 19, 379-391. Manavazhi, M.R. (2004). Assessment of propensity for revisions in design projects through the dichotomous characterization of designer effort. Journal of Construction Management and Economics, Vol. 22, 47-54. Mao, Z., Goh, B.H., Shou, Q.W. & Ofori, G. (2003). Total factor productivity growth accounting in the construction industry of Singapore, Construction Management and Economics, 21:7, 707-718. Markus, T.A. (2003). Lesson from the design quality indicator. Building Research and Information, Vol. 31, No. 5, 399-405. Marsh, P. (1983). The refurbishment of commercial and industrial buildings. Construction Press, London. Marsh, P. (1983). The refurbishment of commercial and industrial buildings. Construction Press, London. Mbugua, L. A. Harris, P., Holt, G.D., & Olomalaiye, P.P.(1999, September 15-17). A framework for Determining Critical Success Factors Influencing Construction Business Performance. Paper presented at ARCOM fifteenth Annual Conference, Liverpool, UK. McKim, R., Hegazy, T., & Attala,. M. (2000). Project Performance control in reconstruction projects. Journal of Construction Engineering and Management, Vol, 126, No. 2, 137-141. Meng, Y.C. (1994). Time & cost performance of building contracts in Australia and Malaysia. Unpublished Msc Dissertation, University of South Australia. Meng. Y.C. (1994). Time & Cost performance of building contracts in Australia and Malaysia. Unpublished MSc Dissertation, University of South Australia. 153 Mezher, T., & Tawil. W. (1998). Causes of delays in the construction industry in Lebanon. Engineering, Construction and Architectural Management, Vol. 5, No. 3, 252-260. Ministry of Trade and Industry Singapore. (2010). Economic Survey of Singapore, Second Quarter 2010. Mintzberg, H. (1981). Research notes and communications, what is planning anyway? Strategic Management Journal, 2, 319-24. Moselhi, O. and Nicholas, M.J. 1990. Hybrid expert system for construction planning and scheduling, Journal of Construction Engineering and Management, ASCE, 116(2), 221-38. Munns, A.K and Bjeirmi, B.F, (1996), “The role of project management in achieving success”, International Journal of Project Management, Vol, 14 No2, pp, 81-7. Munns, A.K., & Bjeirmi, B.F. (1996). The role of project management in achieving project success. International journal of Project Management, Vol. 16, No.1 , 1-8. Mustapha, F. H., & Naoum, S. 1988. Factors influencing the effectiveness of construction site managers. International Journal of Project Management, Vol. 16, No.1, 1-8. National Environment Agency. (2011) Guide to Singapore’s weather. Meteorological Services. Neely, A., Adams, C, and Kenerley, M. 2002, “The performance prism; the scorecard for measuring and managing business success”, Financial Times, Prentice-Hall, London. Nachmias, C., & Naclumias, D. (1991). Research Methods in the Social Sciences(2nd ed.). London: St Martin Press Inc. Naoum, S.G. (1998). Dissertation research and writing for construction students. Butterworth-Heinemann, Oxford. Nkado, R. N. (1995). Construction time-influencing factors: the contractor’s perspective. Construction Management and Economics, 13, 81-89. 154

Description:
Abd. Majid, M. Z., & McCaffer, R. (1988). Factors on non-excusable delays Representing causal mechanism of defective designs: a system approach
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.