ebook img

Proposed SRA Project By M/s. Raj Arcades Homes Pvt. Ltd. FORM-1A 1 FORM-1A PDF

24 Pages·2017·0.26 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Proposed SRA Project By M/s. Raj Arcades Homes Pvt. Ltd. FORM-1A 1 FORM-1A

Proposed SRA Project ByM/s. Raj Arcades Homes Pvt. Ltd. FORM-1A FORM-1A (OnlyforConstruction Projectslisted underItem8 of Schedule) ChecklistofEnvironmental Impacts 1. Land Environment(Attach panoramic view of the project site & the vicinity) Requirement Compliance 1.1. Will the existing land use get 1. The Proposed project isSRAProject. significantly altered from the project that is 2. The site is under Jurisdiction of MCGM. not consistent with the surroundings? 3. The project land is in the Residential & (Proposed land use must conform to the commercialzone. approved Master Plan/Development Plan of the area. Change of land use if any and Enclosed: the statutory approval from the competent 1. Google Image. (ANNEXURE I) authority are submitted). Attach Maps of (i) 2. Layout Plan. (ANNEXURE II) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. 1.2. List out all the major project Name & Location: requirements in terms of the land area, built ‘JAIBHARAT KANDIVALI SRA CHS.LTD. up area, water consumption, power & SAI DARSHAN SRA SAHAKARI requirement, connectivity, community GRUHNIRMAN SANSTHA MARYADIT’ facilities, parking needs etc. A. Residential & Commercial Project at Plot bearing CTS No. 471-A (Pt.) of village - Kandivali, Lalji Pada New Link Road, Kandivali (W) Mumbai-400067. B. ProposedBuilding Details: 2 Buildings 1 Sale with 4 wings and 1 Rehab Buildings with 2 Wings Configuration of Buildings: Building Details Configuration Rehab Wing A Ground +23(pt)Floors Enviro Analysts and Engineers Pvt. Ltd 1 Proposed SRA Project ByM/s. Raj Arcades Homes Pvt. Ltd. FORM-1A Bldg. Wing B Ground +23(pt)Floors Sale Wing A Stilt + 1-23 (Pt) Floors Bldg. Wing B Stilt + 1-23 Floors Wing C Stilt + 1-23 Floors Wing D Stilt + 1-23 Floors Area Statement : (i)Land Area: Plot Area :5885.00m2 F.S.I Area :23540.00m2 Fungible Area: :6685.12m2 Non FSI area :12480.80m2 Total Built UpArea :42705.92 RG provided :483.00m2 C. Parking Statement : 4-Wheelers:- Parking required:185no. Parkingprovided: 185no. 2-Wheelers:- Parking provided: 52no. D. OccupancyLoad:3630Nos. E. Water requirement : Construction phase : Workers 8KLD Construction 12KLD Source: Tanker (depending upon construction activity) OperationPhase: Source of Water supply:-MCGM/Recycled water Total water demand-468KLD Enviro Analysts and Engineers Pvt. Ltd 2 Proposed SRA Project ByM/s. Raj Arcades Homes Pvt. Ltd. FORM-1A Domestic-308KLD Flushing-158KLD Landscaping-2KLD F. Power Requirement : Construction Phase:50KVA Source: Reliance Energy Operation Phase:  Sr. POWER REQUIREMENT No. 1  Source of power supply : Reliance Energy 2  Connected Load 4906KW   Maximum Demand 2983KW 3  DG set as Power Back Rehab = 250 –up during operation KVA Sale = 320 phase KVA DG Set for above will be proposed as back up during power failure. Low Sulphur diesel (LSD) will be used as fuel to run standby D.G. sets. 1.3. What are the likely impacts of the 1. The proposed activity will improve the basic proposed activity on the existing facilities infrastructure facilities of the area. Open spaces, adjacent to the proposed site? (Such as community facilities are simultaneously being open spaces, community facilities, details augmentedin the surroundings. of the existing landuse, disturbance to the 2. Impact on air/noise pollution due to proposed local ecology) project: The impact due to the proposed project may be increase in the traffic loads, increase in the noise levels during construction activities, and dust emissions emanating from various construction activities. Enviro Analysts and Engineers Pvt. Ltd 3 Proposed SRA Project ByM/s. Raj Arcades Homes Pvt. Ltd. FORM-1A 1.4.Will there be anysignificantland There will be no significant land disturbance due to distribution resulting in erosion, subsidence the project. The existing land and surrounding area & instability? (Details of soil type, slope is flat/table land without having any undulations. analysis, vulnerability to subsidence, The existing terrain will be retained. seismicity etc may be given) 1.5. Will the proposal involve alteration of Natural Drainage System will not be altered. natural drainage systems? (Give details on There will be no alteration of natural drainage a contour map showing the natural however in the site proper storm water drainage will drainage near the proposed project site) be provided to prevent flooding. Water storage tanks also proposed. 1.6. What are the quantities of earthwork The cutting and filling is required. The excavated involved in the construction activity- material will be used for refilling, excess quantity if cutting, filling, reclamation etc. (Give any will be used for Landscaping, and to level the details of the quantities of earthwork low lying area. involved, transport of fill materials from outside the siteetc.) 1.7. Give details regarding water supply, Construction phase:- It is expected to house about waste handling etc. during the construction 80-90 labours at site; period. SOURCE: Tanker (Depending upon construction activity) Total Water Required 20KLD Domestic usage 8KLD Construction 12KLD The waste water generated from human settlements will be collected in a septic tank and soak pits. Construction debris will be collected and suitably used on site as per construction waste management plan. The waste water generated from human settlement will be collected in septic tank and soak pits. 1.8. Will the low lying areas & wetlands No low lying area, no wetlands within 500m around get altered? (Provide details of how low the site. Enviro Analysts and Engineers Pvt. Ltd 4 Proposed SRA Project ByM/s. Raj Arcades Homes Pvt. Ltd. FORM-1A lying and wetlands are getting modified from the proposed activity) 1.9. Whether construction debris & waste The construction debris will include sand, soil during construction cause health hazards? bricks and tiles. All this material will be utilized on (Give quantities of various types of wastes the same site or used for land fillings or other generated during construction including the development sites. No hazardous waste is involved. construction labour and the means of disposal) 2. Water Environment Requirement Compliance 2.1. Give the total quantity of water Total water requirement 468KLD requirement for the proposed project with Domestic usage 308KLD the break-up of requirements for various Gardening 2KLD uses. How will the water requirements Flushing 158KLD met? State the sources & quantities and furnish a water balance statement. Sewage Generation: Descript Quantity Treatment/ Disposal ion of Sewage generated (m3/day) Constru 16 Septic Tank and Soak pit ction orportable STP. phase Operatio 434 Treated sewage will be nal usedFor Flushing and Phase gardening. Excess treated sewage will bedisposed to existing sewer line. Sr.No PARTICULARS TOTAL 1 Expected population 3630 (Nos.) 2 Domestic Water 308KLD Requirement Enviro Analysts and Engineers Pvt. Ltd 5 Proposed SRA Project ByM/s. Raj Arcades Homes Pvt. Ltd. FORM-1A 3 Flushing Water 158KLD Requirement 4 R.G water requirement 2 KLD 5 Total Water Demand 468KLD 6 Total Sewage Generation 434KLD 7 Total Capacity of STP 470KLD 8 Total Recycled Water 160KLD 9 Treated Waste water 391KLD 10 Excess water to Drainage 231KLD 2.2. What is the capacity (dependable flow For water supply the project will be dependent on or yield) of the proposed source of water? MCGM and recycled water. The Recycled water will be used for gardening, flushing and other washingpurpose. 2.3. What is the quality of water required, Watersupply for the projectwill befromMCGM. in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) 2.4. How much of the water requirement Total Recycled water 160 KLD will be used at can be met from the recycling of treated maximum extentfor: wastewater? (Give the details of quantities, Flushing 158KLD sources and usage) Gardening 2KLD 2.5. Will there be diversion of water from Nodiversion anticipated. other users? (Please assess the impacts of the project on other existing uses and quantities of consumption) 2.6. What is the incremental pollution load The sewage generation from the proposed project from wastewater generated from the will be 434KLD. STP capacity 470 KLD will be proposed activity? (Give details of the provided for treating the waste water. quantities and composition of wastewater Give details of sewage specification. generated from the proposed activity). Expected Characteristics of Raw Sewage Enviro Analysts and Engineers Pvt. Ltd 6 Proposed SRA Project ByM/s. Raj Arcades Homes Pvt. Ltd. FORM-1A Untreated sewage Characteristics: Description values units PH 6–8.5 Total Suspended 180-250 mg/lit Solids BOD (270c) 250-400 mg/lit 3 COD 600-800 mg/lit Treated Sewage Characteristics. Description values units PH 6.5–8.5 Total Suspended Less than 10 mg/lit Solids BOD (270c) 20 mg/lit 3 COD Less than 30 mg/lit 2.7. Give details of the water requirements Rainwater from the roofs will be lead to storage met from water harvesting? Furnish details tanks. The overflow from these tanks will be of the facilities created. diverted to recharge pits to recharge ground water table. Water available by Terrace RWH during Monsoon is for Rehab = 266 cum & Sale = 226 cum.(2 days water holding capacity) 2.8. What would be the impact of the land The run-offs will be channelized properly through use changes occurring due to the proposed storm water drain and will be diverted to recharging project on the runoff characteristics pits. The overflow of this pit will be diverted to the (Quantitative as well as qualitative) of the storm water drain. area in the post construction phase on a Management plan for Flood is as follows: long term basis? Would it aggravate the • Storm water drain shall be cleaned at regular problems of flooding or water logging in interval. any way? • Demarcating the areas within or leading in or out of the building that will be water logged, flooded or isolated due to the flood. The areas will be marked after completion of the project (as final ground levels etc. will be available aftercompletion). Enviro Analysts and Engineers Pvt. Ltd 7 Proposed SRA Project ByM/s. Raj Arcades Homes Pvt. Ltd. FORM-1A • Dewatering pumps shall be installed at vulnerable locations. 2.9. What are the impacts of the proposal There will be no ground water extraction. Hence, on the ground water? (Will there be tapping recharging of ground water will be done by rain of ground water; give the details of ground water harvesting system. water table, recharging capacity, and approvals obtained from competent authority, if any) 2.10. What precautions/measures are taken The run-off during construction phase is expected to to prevent the run-off from construction carry heavy amount of silt and the other material activities polluting land and aquifers? from the site, which may result in contamination of (Give details of quantities and the measures land and the ground water aquifer. The following taken to avoid the adverse impacts) measures will be adopted. Speciallyduring rainy seasons: Construction material will be stored at the earmarked places and will be covered with a temporary shed ensuring that no leachates or spoilage of land occurs.  The construction waste will be stored at the earmarked place to ensure that the same is not carried away with the storm water.  The rain water entering into the pit will be screened for the removal of heavy silt and other materials.  Diverting up-slope water with turf and not mixing mortar in locations that will drain into storm water system.  Preventing wastewater from brick cutting activities and stockpiles entering the storm water system.  Excavation work will not be carried out during monsoon season. Enviro Analysts and Engineers Pvt. Ltd 8 Proposed SRA Project ByM/s. Raj Arcades Homes Pvt. Ltd. FORM-1A  Cleaning all mud and dirt deposited on roads from construction-related activities. 2.11. How is the storm water from within Storm water drain of adequate size will be provided the site managed?(State the provisions to manage storm water from within the site. Proper made to avoid flooding of the area, details rainwater harvesting structure will be developed and of the drainage facilities provided along storm water will be used for recharging ground with a site layout indication contour water. levels).  Natural water drainage pattern:N to S  Quantity of storm water:  0.013cum / sec.(Actual discharge)  0.18cum/sec.(Design Capacity) Size of SWD:0.30 x 0.30 mt. 2.12. Will the deployment of construction During construction phase the sewage generated will labourers particularly in the peak period be around 16 KLD and will be treated in septic tank lead to unsanitary conditions around the and soak pit. project site (Justify with proper Hence it will not lead to unsanitary conditions explanation) around the project site.  Proper sanitation facilities will be provided at site for construction labours and staff.  There will be no stagnant water at site, as the runoff will be systematically drained into the storm water line.  Temporary toilets with septic tank and soak pit will be provided considering peak labour force.  Composting pit will be provided to take care of food wastes. 2.13. What on-site facilities are provided The quantity of wastewater (434 KLD) generated for the collection, treatment & safe disposal from the project will be treated in STP (capacity470 of sewage? (Give details of the quantities KLD) and used for gardening and flushing purpose. of wastewater generation, treatment 231KLDwater will be released into sewer line. capacities with technology & facilities for STP Technology & its details in brief: recycling and disposal) (MBBR) Moving Bed Bio reactor: Developed at the patrons end with utmost precision, these plants are built using high-grade raw material along with Enviro Analysts and Engineers Pvt. Ltd 9 Proposed SRA Project ByM/s. Raj Arcades Homes Pvt. Ltd. FORM-1A other components procured from the effective sources of the market. Besides, these products are used to for quick & convenient sewage for various water drainages. Appreciated for corrosion resistance, this range is available at competitive prices. Other details: It is a continuous operating non- clogging bio film reactor  Noback washing  Requires low head loss  High specific bio film surface area  Achieved by having the biomass to move along with the water in the reactor  The movement within the reactor is generated by aeration in the aerobic reactor  These bio-film carriers are made of special grade plastic with density close to that of water  The overall efficiencies are 85 to 90%. Sewage specification after treatment in STP. Parameter Value Before After Treatment Treatment pH 7–8.5 7.0–7.5 BOD 250–400 Less than 5 Mg / (Mg / L) L Suspended 200–450 Less than 50 Mg / Solids L (Mg / L) COD 600–800 Less than 10 Mg / (Mg / L) L Oil & Grease Up to 20 Less than 5 Mg / (Mg / L) L 2.14. Give details of dual plumbing system There will be separate pipelines for the supply of if treated wastewater is used for flushing of treated water from STP and the fresh water. Treated toilets or any other use. water will be used for the flushing purposes and landscaping purposes, while the fresh water will be Enviro Analysts and Engineers Pvt. Ltd 10

Description:
'JAIBHARAT KANDIVALI SRA CHS.LTD. & SAI DARSHAN SRA SAHAKARI. GRUHNIRMAN SANSTHA MARYADIT'. A. Residential & Commercial Project at Plot bearing CTS No. 471-A (Pt.) of village -. Kandivali, Lalji Pada New Link Road, Kandivali. (W) Mumbai -400067. B. Proposed Building Details:.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.