project report on planning and scheduling of rob project a case study PDF

70 Pages·2017·3.35 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview project report on planning and scheduling of rob project a case study

PROJECT REPORT ON PLANNING AND SCHEDULING OF ROB PROJECT A CASE STUDY: MUMBRA ROB Submitted in fulfillment of the requirement of the degree of Bachelor of Engineering By Mr. Khan Mohd Saif Israr Ahmed (13CES23) Mr. Sayyad Maaz Mansur Ahmed (13CES46) Mr. Shaikh Imran Mohammed Shahid (13CES50) Mr. Choudhary Azim Naseem (13CES15) Under guidance of Prof. Umesh V. Jadhav Department of Civil Engineering Anjuman-I-Islam’s Kalsekar Technical Campus (Mumbai University) 2016-2017 i Certificate This is to certify that the project entitled “Planning and Scheduling of ROB project (A case study :Mumbra ROB)” is a bonafide work of “Mr. Khan Mohd Saif Israr Ahmed” (13CES23), “Mr. Sayyad Maaz Mansur Ahmed” (13CES46), “Mr. Shaikh Imran Mohammed Shahid” (13CES50), “Mr. Choudhary Azim Naseem” (13CES15) submitted to the University of Mumbai in partial fulfillment of the requirement for the award of the degree of “Undergraduate” in “Bachelor of Engineering”. Mr. Umesh V. Jadhav (Guide) Dr. R.B. Magar Dr. Abdul Razak Honnutagi (Professor & Head, Civil, Dept.) (Director) ii Project Report Approval for B.E. This project report entitled by “Planning and Scheduling of ROB project( A case study: Mumbra ROB)” by Mr. Khan Mohd Saif Israr Ahmed (13CES23), Mr. Sayyad Maaz Mansur Ahmed (13CES 46), Mr. Shaikh Imran Mohammed Shahid (13CES50), Choudhary Azim Naseem (13CES15) is approved for the degree of “Bachelor of Engineering” in “Department of civil Engineering”. Examiners 1 _________________________ 2 _________________________ Supervisors 1 _________________________ 2 _________________________ Chairman (Director) __________________________ Date: Place: iii Declaration We declare that this written submission represents our ideas in our own words and where other ideas or word have been included; we have adequately cited and referred the original sources. We also declare that we have adhered to all principles of academic honesty and integrity and have not misrepresented or fabricated or falsified any idea/data/fact/source in my submission. We have understand that any violation of the above will be cause for disciplinary action by the institute and can also evoke panel action from the source which have thus not been properly cited or from whom proper permission has not been taken when needed. Khan Mohd Saif Israr Ahmed (13CES23) Sayyad Maaz Mansur Ahmed (13CES46) Shaikh Imran Mohammed Shahid (13CES50) Choudhary Azim Naseem (13CES15) iv ACKNOWLEDGEMENT It is our privilege to express our sincerest regards to our project guide, Mr. Umesh V. Jadhav, their valuable inputs, able guidance, encouragement, whole-hearted cooperation and constructive criticism throughout the duration of project. We deeply express our sincere thanks to our head of department Dr. R. B. Magar and our Director Dr. Abdul Razak Honnutagi for encouraging and allowing us to present the project on the topic ‘Planning and Scheduling of ROB project( A case study: Mumbra ROB)’ in fulfillment of the requirements leading to the award of Bachelor of Engineering degree. We take this opportunity to thank all our professor and non-teaching staff who have directly helped our project, especially, Mr Rajiv Verma (Dy. CPM, MRVC), Mr. Mohan (Sr. Engineer, MRVC), Mr. Anil (Site Engineer, D Thakkar Const. Pvt. Ltd), Mr. Tejas(Site Engineer, MRVC). We pay our respect and love to our parents and all other family members and friends for their love and encouragement throughout our career. Mr. Khan Saif Israr Ahmed Mr. Sayyad Maaz Mansur Ahmed Mr. Shaikh Imran Mohamed Shahid Mr. Choudhary Azim Naseem (Semester-VIII, B.E. Civil) AIKTC-New Panvel Navi Mumbai v ABSTRACT This study deals with the scheduling of ROB project which is under construction. Due to increase in number of passengers from Mumbra, the Mumbai Railway Vikas Corporation Ltd is constructing two new railway lines to decrease the passenger traffic. Hence for this road over bridge is being constructed at the proposed site. The ROB construction started in August 2013 and has not been completed yet due to various delays. However it was estimated that the project will be completed in 18 months. The original project was scheduled using traditional methods of construction management. This study is scheduled using the project management software “PRIMAVERA”. Primavera is an appropriate technology for managing construction projects and can improve the construction planning and design efficiency by integrating locations and thematic information in a single environment. In this study the various activities were linked together and their duration was assigned, the software scheduled the activities and thereby estimated the duration of the project accordingly. According to the scheduling done by the software the project duration comes out to be less than the original estimated duration of the project which was 18 months. Keywords: ROB; Primavera; Scheduling; Construction Planning; Construction Management. vi LIST OF FIGURES Figures Name Page No 1 ROB in Germany 2 2 Project Planning 9 3 AOA Diagram 12 4 Forward pass 12 5 Backward pass 13 6 S-S Relationship 13 7 F-F Relationship 14 8 S-F Relationship 14 9 F-S Relationship 14 10 CPM network 15 11 Bar chart 17 12 Aerial view of proposed bridge site 19 13 Plan of ongoing ROB project 19 14 Ongoing ROB project at Mumbra 20 15 Slab construction of ROB at Mumbra 20 16 Steel Girder for trial launching 21 17 Enterprise project structure 25 18 Organizational breakdown structure 26 19.1-19.6 WBS of ROB project 28-34 20.1-20.4 Activities of ROB project 35-38 21 Calendar of ROB project 38 22.1-22.19 Bar chart of ROB project 40-49 23 Original scheduling done by MRVC 50 vii 24.1-24.4 Logic report of ROB project 51-54 24.5-24.6 Activity report of ROB project 55-56 viii Contents 1.INTRODUCTION 1.1 Introduction 1 1.2 Road Over Bridge 2 1.3 Scope of Project 3 1.4 Objective 3 1.5 Methodology 3 2. LITERATURE REVIEW 2.1 Introduction 4 2.2 Literature Survey 4-8 3. STUDY AREA 3.1 Planning 9 3.2 Scheduling 10 3.2.1 Why schedule project 10 3.2.2 Schedule as a monitor of project success 11 3.2.3 Advantages of construction schedule 11 3.3 Network diagram and calculation 12 3.3.1 Forward pass 12 3.3.2 Backward pass 12 3.3.3 Floats 13 3.4 Relationship types 13 3.5 CPM 15 3.5.1 Basic techniques in CPM 15 3.6 Bar chart 16 3.6.1 Advantages 17 3.7 Case study: Mumbra ROB 18 3.7.1 Project feature 18 3.7.2 Geographical location 19 3.7.3 Construction details 21 ix 3.8 Introduction to Primavera 22 3.8.1 Application of Primavera 22 3.8.2 Advantages of Primavera 23 4. METHODOLOGY 24 4.1 Introduction 24 4.2 Creating Enterprise project structure 24 4.3 Creating Organisational breakdown structure 26 4.4 Creating work breakdown structure 27 4.5 Creating calendar and activities 35 4.6 Scheduling 39 4.6.1 Introduction 39 5. RESULT AND DISCUSSION 51 6. CONCLUSION 57 7. SCOPE OF FUTURE STUDY 58 8. REFERENCES 59 x

Description:
Anjuman-I-Islam's Kalsekar Technical Campus. (Mumbai University) Keywords: ROB; Primavera; Scheduling; Construction Planning; Construction. Management. 4.2 Creating Enterprise project structure. 24 . Managing concurrent construction projects using knowledge management and set-based