ebook img

Production and Inventory Management Journal 1997: Vol 38 Index PDF

7 Pages·1997·1.5 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Production and Inventory Management Journal 1997: Vol 38 Index

INDEX TO VOLUME 38 (1997) AUTHOR LISTING ADAMS, Dennis A., see Anderson, Elizabeth A. Participants’ Attitudes and Job Performance.” ALLEN, Stuart J., Jack L. Martin, and Edmund W. 2Q: 52-57. Schuster. “A Simple Method for the Multi-Item, EVANS, James R. “Beyond QS-9000.”" 3Q: 72-76. Single-Level, Capacitated Scheduling Problem with Setup Times and Costs.” 4Q: 39-47. FIKES, Joyce, see Mercier, Stace. AL-SHAMMARI, Minwir, and Isaam Dawood. FLIEDNER, Gene, and Robert J. Vokurka. ’’ Agility: “Linear Programming Applied to a Production Competitive Weapon of the 1990s and Beyond? Blending Problem: A Spreadsheet Modeling 3Q: 19-24. Approach.” 1Q: 1-7. FONTANA, Frank C. Redesign of Medium ANDERSON, Elizabeth A., and Dennis A. Adams. Industrial Pump Assembly Process.” 2Q: 74-81. Evaluating the Success of TQM Implementation: Lessons from Employees.” 4Q: 1-6. GILES, Christopher Allen, James Jefferson King, Ryan Carl Murphy, and Paul Joseph Roney. ANG, James S. K., see Sum, Chee-Chuong. "Meeting Customer Demand through Mixed- Model Manufacturing.” 2Q: 82-87. BARBAROSOGLU, Giilay, and Tiilin Yazgac. An Application of the Analytic Hierarchy Process to GONSALVEZ, David J. A:, see Inman, Robert R. GRIFFIN, Barry. ‘Using Origami to Teach the Supplier Selection Problem.” 1Q: 14-21. BERNARD, Paul. ’’Three Simple Techniques for Production Management.” 2Q: 1-5. Improving Statistical Forecasts.” 4Q: 65-70. GROUT, John R. ’’Mistake-Proofing Production.” 3Q: 33-37. BOLANDER, Steven F., see Taylor, Sam G. GUPTA, Uma G. ’’The New Revolution: Intranets, BOYD, Lynn H., and James F. Cox III. "A Cause-and- Not Internet.” 2Q: 16-20. Effect Approach to Analyzing Performance Measures.” 3Q: 25-32. BRANNAN, Kenneth M. ’’Total Quality in Health HANSON, Matthew, see Wacker, John G. Care.” 20: 69-73. HAROLD, Joyce E. “Evaluating and Implementing BULLEN, George N. ’’The Mechanization/ EDI at a Small Electronics Manufacturer.” 3Q: 1- Automation of Major Aircraft Assembly Tools.” S. 3Q: 84-87. HARRIS, Terry. ‘Optimized Inventory Management.” 1Q: 22-25. CHAUSSE, Sylvain, see Landry, Sylvain. HOBBS, O. Kermit, Jr. "Managing JIT Toward CHEN, Frederick. ’’Issues in the Continuous Maturity.” 1Q: 47-50. Improvement Process for Preventive HORMOZI, Amir M. ’’Parts Remanufacturing in the Maintenance: Observations from Honda, Automotive Industry.” 1Q: 26-31. Nippondenso and Toyota.” 4Q: 13-16. HORN, G. Scott, and Robert Lorin Cook. ’’Heijunka CHEN, Ronggqiu, see Chen, Shuyong. Transportation Measure: Development and CHEN, Shuyong, and Ronggqiu Chen. ’Manufacturer- Application.’”” 4Q: 32-38. Supplier Relationship in a JIT Environment.” HUNG, Rudy. ’’Annualized Hours and Aggregate 10: 58-64. Planning.” 4Q: 48-50. COOK, Robert Lorin, see Horn, G. Scott. HURLEY, Catherine N., see Lau, R. S. M. COX III, James F., see Boyd, Lynn H. INMAN, Robert R., and David J. A. Gonsalvez. ’’The DAWOOD, Isaam, see Al-Shammari, Minwir. Causes of Schedule Instability in an Automotive DESSOUKY, Yasser, see Schmahl, Karen E. Supply Chain.” 2Q: 26-31. DUGUAY, Claude R., see Landry, Sylvain. IRANI, Zahir, John M. Sharp, and Peter Race. A Case Experience of New Product Introduction ELMUTI, Dean, and Yunus Kathawala. ’ An within a Once-Traditional Subcontract Investigation into the Effects of ISO 9000 on Manufacturing Environment.” 2Q: 47-51. AUTHOR LISTING JACOBS, Raymond A., see Symons, Richard T. MORRIS, John S. ’“A New Approach to Teaching JAYARAM, Jayanth, see Narasimhan, Ram. Production Operations Management in the JONES, David J., see Recardo, Ronald J. Business Core Curriculum.” 2Q: 42-46. MOSCHURIS, Socrates J., see Laios, Lambros G. KATHAWALA, Yunus, see Elmuti, Dean. MOUNTFORD, James R. ’’Empowerment Costing.” 1Q: 65-71. KAYTON, David, Tim Teyner, Christopher Schwartz, MURPHY, Ryan Carl, see Giles, Christopher Allen. and Reha Uzsoy. ’ Focusing Maintenance Improvement Efforts in a Wafer Fabrication NARASIMHAN, Ram, and Jayanth Jayaram. Facility Operating under the Theory of Application of Project Management Constraints.” 4Q: 51-58. Principles in Business Process Reengineering.” KING, James Jefferson, see Giles, Christopher Allen. 3Q: 44-50. KRUPP, James A. G. ’’Troubleshooting Materials Management Systems.” 1Q: 80-84. KRUPP, James A. G. ’’Fundamentals of Materials RACE, Peter, see Irani, Zahir. RECARDO, Ronald J., and David J. Jones. “A Report Management Systems.” 2Q: 37-41. Card on Reengineering.” 3Q: 51-56. KRUPP, James A. G. ’’Safety Stock Management.” 3Q: 11-18. REID, Dan, see Wharton, T. J. KRUPP, James A. G. ’’ROI Analysis for Purchasing RONEY, Paul Joseph, see Giles, Christopher Allen. RUCKER, David, see Schmahl, Karen E Price Breaks.”” 4Q: 28-31. SANDERS, Nada R. ’’Measuring Forecast Accuracy: LAIOS, Lambros G., and Socrates J. Moschuris. ’’A Some Practical Suggestions.” 1Q: 43-46. Decision Support System for Make or Buy in an SANDERS, Nada R. The Status of Forecasting in Aircraft Maintenance Facility.” 4Q: 22-27. Manufacturing Firms.” 2Q: 32-36. LANDRY, Sylvain, Claude R. Duguay, Sylvain SCHMAHL, Karen E., Yasser Dessouky, and David Chaussé, and Jean-Luc Themens. ’’Integrating Rucker. “Measuring the Cost of Quality: A Case MRP, Kanban, and Bar-Coding Systems to Study.” 4Q: 58-64. Achieve JIT Procurement.” 1Q: 8-13. SCHONBERGER, Richard J. ’’Rate-Based Scheduling LAU, R. S. M. ’’Operational Characteristics of at OPW Fueling Components.” 3Q: 6-10. Highly Competitive Manufacturing Firms.” SCHUSTER, Edmund W., see Allen, Stuart J. 4Q: 17-21. SCHWARTZ, Christopher, see Kayton, David. LAU, R. S. M., and Catherine N. Hurley. SHARP, John M., see Irani, Zahir. Outsourcing through Strategic Alliances.”’ 2Q: SHELDON, Donald H. ’Communication of the 6-10. Goals.”” 2Q: 58-62. LESCHKE, John P. ’’The Setup-Reduction Process: SHELDON, Donald H. ’’Documentation-ISO Says Part 1.” 1Q: 32-37. Yes. Should We Do It? 3Q: 38-43. LESCHKE, John P. ’’The Setup-Reduction Process: SIMONS, Jacob V., Jr., see McFeely, Daniel J. Part 2:-Setting Reduction Priorities.” 1Q: 38-42. SIMPSON, Wendell P., see McFeely, Daniel J. SMOLOWITZ, Ira. ’’Reassessing Workplace MAJERUS, Clyde, and Mike Monnig. "Setting Bonuses.” 1Q: 85. Improvement Priorities and Increasing SUM, Chee-Chuong, James S. K. Ang, and Lei-Noy Production Efficiency via a Simple Job-Shop Yeo. ’’Contextual Elements of Critical Success Database.” 4Q: 77-82. Factors in MRP Implementation.” 3Q: 77-83. MARTIN, Jack L., see Allen, Stuart J. SWANSON, Laura. ’” Computerized Maintenance MCFEELY, Daniel J., Wendell P. Simpson III, and Management Systems: A Study of System Jacob V. Simons, Jr. ‘Scheduling to Achieve Design and Use.” 2Q: 11-15. Multiple Criteria in an Air Force Depot CNC SYMONS, Richard T., and Raymond A. Jacobs. Machine Shop.” 1Q: 72-79. “Multi-Level Process Mapping: A Tool for Cross- MERCIER, Stace, and Joyce Fikes. Functional Quality Analysis.’’ 4Q: 71-76. Factors to Consider in the Delivery of Quality Services by Hospitals.” 2Q: 63-68. TAYLOR, Sam G., and Steven F. Bolander. ’’Process MEREDITH, Jack R., see Vineyard, Michael L. Flow Scheduling: Past, Present, and Future.” 2Q: MONNIG, Mike, see Majerus, Clyde. 21-25. 84 AUTHOR LISTING TEYNER, Tim, see Kayton, David. Empirical Results from the Global THEMENS, Jean-Luc, see Landry, Sylvain. Manufacturing Research Group. 3Q: 64-71. WHARTON, T. J., Dan Reid, and Edna M. White. UZSOY, Reha, see Kayton, David. An Empirical Study of Manufacturing Approaches over Time.” 4Q: 7-12. WHITE, Edna M., see Wharton, T.J. VINEYARD, Michael L., E. Seth Wilson, and Jack R. WILSON, E. Seth, see Vineyard, Michael L. Meredith. ’’Inventory and Capacity Management of Natural Gas under Deregulation.” 3Q: 57-63. YAZGAC, Tilin, see Barbarosoglu, Glay. VOKURKA, Robert J., see Fliedner, Gene. YEH, Quey-Jen. ’’A Practical Implementation of Gamma Distribution to the Reordering Decision WACKER, John G., and Matthew Hanson. ’’Some of an Inventory Control Problem.” 1Q: 51-57. Practical Advice to Manufacturing Managers: YEO, Lei-Noy, see Sum, Chee-Chuong. AUTHOR LISTING SUBJECT LISTING Prepared by James A. G. Krupp KRUPP, James A. G. ’’Safety Stock Management.” 3Q: 11-18. Curricula/Education/Academic Interface GRIFFIN, Barry. Using Origami to Teach Just-in-Time Production Management.” 2Q: 1-5. MORRIS, John S. “A New Approach to Teaching CHEN, Shuyong, and Ronggqiu Chen. ’’Manufacturer- Production Operations Management in the Supplier Relationship in a JIT Environment.” Business Core Curriculum.” 2Q: 42-46. 10: 58-64. FONTANA, Frank C. "Redesign of Medium EDI (Electronic Data Interchange) Industrial Pump Assembly Process.” 2Q: 74-81. GILES, Christopher Allen, James Jefferson King, GUPTA, Uma G. ’’The New Revolution: Intranets, Ryan Carl Murphy, and Paul Joseph Roney. Not Internet.”” 2Q: 16-20. Meeting Customer Demand through Mixed- HAROLD, Joyce E. “Evaluating and Implementing Model Manufacturing.” 2Q: 82-87. EDI at a Small Electronics Manufacturer.” 3Q: 1- HOBBS, O. Kermit, Jr. ’ Managing JIT Toward “h Maturity.” 1Q: 47-50. HORN, G. Scott, and Robert Lorin Cook. ’’Heijunka Financial/Accounting Interfaces Transportation Measure: Development and Application.” 4Q: 32-38. MOUNTFORD, James R. ’’Empowerment Costing.” YEH, Quey-Jen. ’’A Practical Implementation of 1Q: 65-71. Gamma Distribution to the Reordering Decision of an Inventory Control Problem.” 1Q: 51-57. Forecasting BERNARD, Paul. Three Simple Techniques for Materials Management (General) Improving Statistical Forecasts.” 4Q: 65-70. SANDERS, Nada R. ’’Measuring Forecast Accuracy: KRUPP, James A. G. Troubleshooting Materials Some Practical Suggestions.” 1Q: 43-46. Management Systems.” 1Q: 80-84. KRUPP, James A. G. ’’Fundamentals of Materials General Management Management Systems.” 2Q: 37-41. FLIEDNER, Gene, and Robert J. Vokurka. ’’ Agility: Competitive Weapon of the 1990s and Beyond? Material Requirements Planning (MRP) 3Q: 19-24. LAU, R. S. M. Operational Characteristics of Highly SUM, Chee-Chuong, James S. K. Ang, and Lei-Noy Competitive Manufacturing Firms.” 4Q: 17-21. Yeo. Contextual Elements of Critical Success LESCHKE, John P. ’’The Setup-Reduction Process: Factors in MRP Implementation.” 3Q: 77-83. Part 1.” 1Q: 32-37. LESCHKE, John P. ’’The Setup-Reduction Process: Process Industry Part 2.” 1Q: 38-42. SANDERS, Nada R. "Measuring Forecast Accuracy: Some Practical Suggestions.”’ 1Q: 43-46. AL-SHAMMARI, Minwir, and Isaam Dawood. SHELDON, Donald H. ’Communication of the “Linear Programming Applied to a Production Goals.”” 2Q: 58-62. Blending Problem: A Spreadsheet Modeling SHELDON, Donald H. ’’Documentation-ISO Says Approach.” 1Q: 1-7. Yes. Should We Do It? 3Q: 38-43. TAYLOR, Sam G., and Steven F. Bolander. ’’Process Flow Scheduling: Past, Present, and Future.” 2Q: Inventory Management 21-25. VINEYARD, Michael L., E. Seth Wilson, and Jack R. HARRIS, Terry. “Optimized Inventory Meredith. Inventory and Capacity Management Management.” 1Q: 22-25. of Natural Gas under Deregulation.” 3Q: 57-63. SUBJECT LISTING Production Planning Surveys HUNG, Rudy. ’’Annualized Hours and Aggregate SANDERS, Nada R. ’’The Status of Forecasting in Planning.” 4Q: 48-50. Manufacturing Firms.’ 2Q: 32-36. INMAN, Robert R., and David J. A. Gensalvez. ’’The SWANSON, Laura. ’ Computerized Maintenance Causes of Schedule Instability in an Automotive Management Systems: A Study of System Supply Chain.” 2Q: 26-31. Design and Use.” 2Q: 11-15. WACKER, John G., and Matthew Hanson. ’’Some Purchasing Interface Practical Advice to Manufacturing Managers: Empirical Results from the Global BARBAROSOGLU, Giilay, and Tiilin Yazgag. An Manufacturing Research Group. 3Q: 64-71. Application of the Analytic Hierarchy Process to WHARTON, T. J., Dan Reid, and Edna M. White. the Supplier Selection Problem.” 1Q: 14-21. An Empirical Study of Manufacturing KRUPP, James A. G. ROI Analysis for Purchasing Approaches over Time.” 4Q: 7-12. Price Breaks.’ 4Q: 28-31. LANDRY, Sylvain, Claude R. Duguay, Sylvain Synchronous Manufacturing/TOC Chaussé, and Jean-Luc Themens. “Integrating MRP, Kanban, and Bar-Coding Systems to KAYTON, David, Tim Teyner, Christopher Schwartz, Achieve JIT Procurement.” 1Q: 8-13. and Reha Uzsoy. ’’ Focusing Maintenance LAU, R. S. M., and Catherine N. Hurley. Improvement Efforts in a Wafer Fabrication Outsourcing through Strategic Alliances.” 2Q: Facility Operating under the Theory of 6-10. Constraints.” 4Q: 51-58. Quality Assurance/Control TQM/Continuous Improvement EVANS, James R. ’’Beyond QS-9000.” 3Q: 72-76. ANDERSON, Elizabeth A., and Dennis A. Adams. GROUT, John R. ’’Mistake-Proofing Production.” 3Q: Evaluating the Success of TQM 33-37. Implementation: Lessons from Employees.” 4Q: SCHMAHL, Karen E., Yasser Dessouky, 1-6. and David Rucker. ’’Measuring the Cost of BRANNAN, Kenneth M. ’’Total Quality in Health Quality: A Case Study.” 4Q: 58-64. Care.”” 20: 69-73. CHEN, Frederick. ’’Issues in the Continuous Remanufacturing Improvement Process for Preventive Maintenance: Observations from Honda, HORMOZI, Amir M. ’’Parts Remanufacturing in the Nippondenso and Toyota.” 4Q: 13-16. Automotive Industry.” 1Q: 26-31. MERCIER, Stace, and Joyce Fikes. LAIOS, Lambros G., and Socrates J. Moschuris. ’” A ‘Factors to Consider in the Delivery of Quality Decision Support System for Make or Buy in an Services by Hospitals.” 2Q: 63-68. Aircraft Maintenance Facility.’” 4Q: 22-27. NARASIMHAN, Ram, and Jayanth Jayaram. ’ Application of Project Management Principles Shop Floor Control/Scheduling in Business Process Reengineering.’’ 3Q: 44-50. RECARDO, Ronald J., and David J. Jones. ’’A Report Card on Reengineering.”’ 3Q: 51-56. ALLEN, Stuart J., Jack L. Martin, and Edmund W. Schuster. ’’A Simple Method for the Multi-Item, SYMONS, Richard T., and Raymond A. Jacobs. ‘Multi-Level Process Mapping: A Tool for Cross- Single-Level, Capacitated Scheduling Problem with Setup Times and Costs.’ 4Q: 39-47. Functional Quality Analysis.’’ 4Q: 71-76. MCFEELY, Daniel J., Wendell P. Simpson III, and Jacob V. Simons, Jr. ‘Scheduling to Achieve Miscellaneous Multiple Criteria in an Air Force Depot CNC Machine Shop.” 1Q: 72-79. BOYD, Lynn H., and James F. Cox III. "A Cause-and- SCHONBERGER, Richard J. ’’Rate-Based Scheduling Effect Approach to Analyzing Performance at OPW Fueling Components.” 3Q: 6-10. Measures.” 3Q: 25-32. SUBJECT LISTING BULLEN, George N. ”The Mechanization/ within a Once-Traditional Subcontract Automation of Major Aircraft Assembly Tools.’ , Manufacturing Environment.” 2Q: 3Q: 84-87. 47-51. ELMUTI, Dean, and Yunus Kathawala. ’’ An MAJERUS, Clyde, and Mike Monnig. "Setting Investigation into the Effects of ISO 9000 on Improvement Priorities and Increasing Participants’ Attitudes and Job Performance.” Production Efficiency via a Simple Job-Shop 2Q: 52-57. Database.” 4Q: 77-82. IRANI, Zahir, John M. Sharp, and Peter Race. ’’A SMOLOWITZ, Ira. “Reassessing Workplace Case Experience of New Product Introduction Bonuses.” 1Q: 85. SUBJECT LISTING

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.