ebook img

Production and Inventory Management Journal 1991: Vol 32 Index PDF

7 Pages·1991·1.2 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Production and Inventory Management Journal 1991: Vol 32 Index

INDEX TO VOLUME 32 (1991) AUTHOR LISTING ADELSBERGER, Heimo H. and Kanet, John J., “The CHENG, T. C. E., “An EOQ Model with Learning Leitstand—A New Tool for Computer- Effect on Setups,’”” 1Q, pp. 83-84. integrated Manufacturing,” 1Q, pp. 43-48. CHOI, Moo-Jin and Riggs, Walter E., “GT Coding AGARWAL, Sunil K., see Bhadury, Bikash. and Classification Systems for Manufacturing AROGYASWAMY, Bernard and Simmons, Ronald Cell Design,” 1Q, pp. 28-32. P., “Thriving on Interdependence: The Key to COLLINS, Joseph J., Sparks, Richard A., Tarrant, JIT Implementation,” 3Q, pp. 56-60. Ken, and Sumichrast, Robert T., “A Decision- Support System for Strip Inventory Consolidation,” 4Q, pp. 64-68. BALASHANMUGAM, Bala, see Sounderpandian, COX, James F., see Crawford, Karlene M. Jayavel. CRAWFORD, Karlene M. and Cox, James F., BHADURY, Bikash and Agarwal, Sunil K., “Addressing Manufacturing Problems through “Development of a Production Planning and the Implementation of Just-in-Time,” 1Q, pp. Control System for a Leaf-Spring 33-36. Manufacturing Facility, 2Q, pp. 1-6. BILLESBACH, Thomas J., “A Study of the DENTON, D. Keith, “Lessons on Competitiveness: Implementation of Just-in-Time in the United Motorola’s Approach,” 3Q, pp. 22-25. States,”’ 3Q, pp. 1-4. DOMNICK, Frederick A., “On-Hand Balances in BOLANDER, Steven F., see Taylor, Sam G. Secondary Locations,” 4Q, pp. 32-37. BOYLE, Darby, Ray, Beverly A., and Kahan, Gerald, DUBOIS, Frank L. and Oliff, Michael D., “Aggregate “Work Standards—The Quality Way,” 2Q, pp. Production Planning in Practice,” 3Q, pp. 26- 67-73. 30. BREGMAN, Robert L., “Selecting among MRP Lot- Sizing Methods for Purchased Components FAWCETT, Stanley E., see Wisner, Joel D. when the Planning Horizon is Limited,” 2Q, FAWCETT, Stanley E. and Pearson, John N., pp. 32-39. “Understanding and Applying Constraint BROWN, Robert G., “Profits from Prophets: A Management in Today’s Manufacturing Note,” 3Q, pp. 87-88. Environments,” 3Q, pp. 46-55. BULLEN, George N., “Calculating the Economic FELDMAN, Larry H., see Wasco, W. Calvin. Equilibrium Point for Tape Proofing in the NC FINCH, Byron J. and Luebbe, Richard L., “Risk Machining Cell,” 2Q, pp. 62-66. Associated with Learning Curve Estimates,” BULLINGTON, Kimball E. and Bullington, Stanley 3Q, pp. 73-76. F., ‘Working Toward World-Class FORST, Frank G., see Chaudhry, Sohail S. Manufacturing Prior to Top Management FREELAND, James R., “A Survey of Just-in-Time Commitment,” 3Q, pp. 31-34. Purchasing Practices in the United States,” 2Q, BULLINGTON, Stanley F., see Bullington, pp. 43-50. Kimball E. BYRD, Terry Anthony and Hauser, Richard D., Jr., “Expert Systems in Production and Operations GOLANY, Boaz, Yadin, Micha, and Learner, Oded, Management: Possible Human Side Effects in “A Goal Programming Inventory Control Implementation,” 4Q, pp. 53-57. Model Applied at a Large Chemical Plant,” 1Q, pp. 16-24. GORDON, Geoffrey L. and Marino, Paulette, ““The CARTER, Joseph R., “Implementing Supplier Bar Use of Production Information in Test Market Codes,” 4Q, pp. 42-47. Decisions,” 2Q, pp. 27-31. CHAUDHRY, Sohail S., Forst, Frank G., and GRAY, Clifford and Hoesada, Melani, “Matching Zydiak, James L., “A Multicriteria Approach to Heuristic Scheduling Rules for Job Shops to the Allocating Order Quantity Among Vendors,” Business Sales Level,” 2Q, pp. 12-17. 3Q, pp. 82-86. GREENWOOD, Frank, see Kobu, Bulent. AUTHOR LISTING INDEX TO VOLUME 32 (1991) AUTHOR LISTING ADELSBERGER, Heimo H. and Kanet, John J., “The CHENG, T. C. E., “An EOQ Model with Learning Leitstand—A New Tool for Computer- Effect on Setups,’”” 1Q, pp. 83-84. integrated Manufacturing,” 1Q, pp. 43-48. CHOI, Moo-Jin and Riggs, Walter E., “GT Coding AGARWAL, Sunil K., see Bhadury, Bikash. and Classification Systems for Manufacturing AROGYASWAMY, Bernard and Simmons, Ronald Cell Design,” 1Q, pp. 28-32. P., “Thriving on Interdependence: The Key to COLLINS, Joseph J., Sparks, Richard A., Tarrant, JIT Implementation,” 3Q, pp. 56-60. Ken, and Sumichrast, Robert T., “A Decision- Support System for Strip Inventory Consolidation,” 4Q, pp. 64-68. BALASHANMUGAM, Bala, see Sounderpandian, COX, James F., see Crawford, Karlene M. Jayavel. CRAWFORD, Karlene M. and Cox, James F., BHADURY, Bikash and Agarwal, Sunil K., “Addressing Manufacturing Problems through “Development of a Production Planning and the Implementation of Just-in-Time,” 1Q, pp. Control System for a Leaf-Spring 33-36. Manufacturing Facility, 2Q, pp. 1-6. BILLESBACH, Thomas J., “A Study of the DENTON, D. Keith, “Lessons on Competitiveness: Implementation of Just-in-Time in the United Motorola’s Approach,” 3Q, pp. 22-25. States,”’ 3Q, pp. 1-4. DOMNICK, Frederick A., “On-Hand Balances in BOLANDER, Steven F., see Taylor, Sam G. Secondary Locations,” 4Q, pp. 32-37. BOYLE, Darby, Ray, Beverly A., and Kahan, Gerald, DUBOIS, Frank L. and Oliff, Michael D., “Aggregate “Work Standards—The Quality Way,” 2Q, pp. Production Planning in Practice,” 3Q, pp. 26- 67-73. 30. BREGMAN, Robert L., “Selecting among MRP Lot- Sizing Methods for Purchased Components FAWCETT, Stanley E., see Wisner, Joel D. when the Planning Horizon is Limited,” 2Q, FAWCETT, Stanley E. and Pearson, John N., pp. 32-39. “Understanding and Applying Constraint BROWN, Robert G., “Profits from Prophets: A Management in Today’s Manufacturing Note,” 3Q, pp. 87-88. Environments,” 3Q, pp. 46-55. BULLEN, George N., “Calculating the Economic FELDMAN, Larry H., see Wasco, W. Calvin. Equilibrium Point for Tape Proofing in the NC FINCH, Byron J. and Luebbe, Richard L., “Risk Machining Cell,” 2Q, pp. 62-66. Associated with Learning Curve Estimates,” BULLINGTON, Kimball E. and Bullington, Stanley 3Q, pp. 73-76. F., ‘Working Toward World-Class FORST, Frank G., see Chaudhry, Sohail S. Manufacturing Prior to Top Management FREELAND, James R., “A Survey of Just-in-Time Commitment,” 3Q, pp. 31-34. Purchasing Practices in the United States,” 2Q, BULLINGTON, Stanley F., see Bullington, pp. 43-50. Kimball E. BYRD, Terry Anthony and Hauser, Richard D., Jr., “Expert Systems in Production and Operations GOLANY, Boaz, Yadin, Micha, and Learner, Oded, Management: Possible Human Side Effects in “A Goal Programming Inventory Control Implementation,” 4Q, pp. 53-57. Model Applied at a Large Chemical Plant,” 1Q, pp. 16-24. GORDON, Geoffrey L. and Marino, Paulette, ““The CARTER, Joseph R., “Implementing Supplier Bar Use of Production Information in Test Market Codes,” 4Q, pp. 42-47. Decisions,” 2Q, pp. 27-31. CHAUDHRY, Sohail S., Forst, Frank G., and GRAY, Clifford and Hoesada, Melani, “Matching Zydiak, James L., “A Multicriteria Approach to Heuristic Scheduling Rules for Job Shops to the Allocating Order Quantity Among Vendors,” Business Sales Level,” 2Q, pp. 12-17. 3Q, pp. 82-86. GREENWOOD, Frank, see Kobu, Bulent. AUTHOR LISTING HAHN, Chan K., Watts, Charles A., and Kim, Ki OLIFF, Michael D., see DuBois, Frank L. Joo, ‘“Order-launching and Delivery Sequencing for an Automotive Manufacturer,” 1Q, pp. 49- PEARSON, John N., see Fawcett, Stanley E. 53. PEGELS, C. Carl, “Japanese Management Practices HANSEN, Leon, see South, John B. in Japanese Overseas Subsidiaries,” 3Q, pp. HART, Marilyn K., “Quality Control Training for 67-72. Manufacturing,” 3Q, pp. 35-40. PERRY, James H., “The Impact of Lot Size and HAUSER, Richard D., Jr., see Byrd, Terry Anthony. Production Scheduling on Inventory HILL, Arthur V., see Petroff, John N. Investment in a Remanufacturing HOESADA, Melani, see Gray, Clifford. Environment,” 3Q, pp. 41-45. PETROFF, John N. and Hill, Arthur V., “A INMAN, R. Anthony and Mehra, Satish, “JIT Framework for the Design of Lot-Tracing Applications for Service Environments,” 3Q, Systems for the 1990s,” 2Q, pp. 55-61. pp. 16-21. PTAK, Carol A., “MRP, MRP II, OPT, JIT, and CIM—Succession, Evolution, or Necessary JOHNSON, Dale and LaBarre, James, ‘‘Inventory Combination,” 2Q, pp. 7-11. Control: A Target for MIS Support,” 1Q, pp. PUTTMAN, Michiel T., “Logistics in Process 62-66. Industries: Is It a Specific Problem?” 3Q, pp. JURCEWSKY, James L., see Neeley, Parley S. 61-66. KAHAN, Gerald, see Boyle, Darby RABY, David J., Yanke, Tracey, and Silver, Edward KANET, John J., see Adelsberger, Heimo H. A., “Inventory Management of Chemical KIM, Ki Joo, see Hahn, Chan K. Supplies at Alberta Wheat Pool,” 1Q, pp. 1-6. KOBU, Bulent and Greenwood, Frank, “Continuous RAY, Beverly A., see Boyle, Darby Improvement in a Competitive Global REIDELBACH, Mark A., “Engineering Change Economy,” 4Q, pp. 58-63. Management for Long-Lead-Time Production KRUPP, James A. G., “JIT in Distribution and Environments,” 2Q, pp. 84-88. Warehousing,” 2Q, pp. 18-21. REIMER, Glenn, “Material Requirements Planning KRUPP, James A. G., “Strategic Issues in Software and Theory of Constraints: Can They Coexist? Evaluation for Manufacturing Firms,” 1Q, pp. A Case Study,” 4Q, pp. 48-52. 11-15. RICE, James W., “Zero Defects Through Modular Sort Matching,” 4Q, pp. 11-14. LABARRE, James, see Johnson, Dale. RIGGS, Walter E., see Choi, Moo-Jin. LEARNER, Oded, see Golany, Boaz. ROMERO, Bernardo Prida, ““The Other Side of JIT LUEBBE, Richard L., see Finch, Byron, J. in Supply Management,” 4Q, pp. 1-3. RONEN, Boaz, see Schragenheim, Eli. MARINO, Paulette, see Gordon, Geoffrey L. ROSS, David F., “Aligning the Organization for MEHRA, Satish, see Inman, R. Anthony World-class Manufacturing,” 2Q, pp. 22-26. MEYER, Harry, “An Eight-Step Approach to Inventory Accuracy: A Case Study at Leviton SARKIS, Joseph, “Production and Inventory Control Manufacturing Company,” 2Q, pp. 40-42. Issues in Advanced Manufacturing Systems,” MILLER, Tan C., “Integrating Current End-Item 1Q, pp. 76-82. Inventory Conditions into Optimization-Based SCHRAGENHEIM, Eli and Ronen, Boaz, “Buffer Long-Run Aggregate Production and Management: A Diagnostic Tool for Production Distribution Planning,” 4Q, pp. 74-80. Control,” 2Q, pp. 74-79. MIN, Hokey, see Shin, Dooyoung. SHAFER, Scott M., “A Spreadsheet Approach to Aggregate Scheduling,” 4Q, pp. 4-10. NATARAJAN, R., “Inventory Management—The SHELDON, Don, Jr., “MRP II—What It Really Is,” Big Picture,” 4Q, pp. 29-31. 3Q, pp. 12-15. NEELEY, Parley S. and Jurcewsky, James L., SHIN, Dooyoung and Min, Hokey, “Flexible Line “Chaining the Beast: Limiting the Damage of Balancing Practices in a Just-in-Time Long MRP Run Times with Postmortem and Environment,” 4Q, pp. 38-41. Pro Forma Analyses,” 3Q, pp. 77-81. SILVER, Edward A., see Raby, David J. AUTHOR LISTING SIMMONS, Ronald P., see Arogyaswamy, Bernard. TAYLOR, Sam G. and Bolander, Steven F., “Process SOUNDERPANDIAN, Jayavel and Flow Scheduling Principles,” 1Q, pp. 67-71. Balashanmugam, Bala, ‘‘Multiproduct, Multifacility Scheduling Using the VAN DER WALDE, Elissa, “Computer Simulation in Transportation Model: A Case Study,” 4Q, pp. Manufacturing,” 2Q, pp. 80-83. 69-73. SOUTH, John B. and Hansen, Leon, “Large WALKER, William T., “Master Planning Simulator Inventories as a Competitive Strategy,”’ 2Q, pp. Provides Real-time Feedback on Plan 51-54. Effectiveness,” 1Q, pp. 54-61. SPARKS, Richard A., see Collins, Joseph J. WASCO, W. Calvin, Stonehocker, Robert E., and SPENCER, Michael S., ‘Using ‘The Goal’ in an Feldman, Larry H., “Success with JIT and MRP MRP System,” 4Q, pp. 22-28. II in a Service Organization,’ 4Q, pp. 15-21. STEIN, Robert E., “Beyond Statistical Process WATTS, Charles A., see Hahn, Chan K. Control,” 1Q, pp. 7-10. WILSON, Glenn T., “Industrial Robots for Smaller STONEHOCKER, Robert E., see Wasco, W. Calvin. Firms,” 1Q, pp. 25-27. SUMICHRAST, Robert T., see Collins, Joseph J. WISNER, Joel D. and Fawcett, Stanley E., ‘Linking SUTTON, Sharon G., “A New Age of Accounting,” 1Q, pp. 72-75. Firm Strategy to Operating Decisions through Performance Measurement,” 3Q, pp. 5-11. TARRANT, Ken, see Collins, Joseph J. YADIN, Micha, see Golany, Boaz. TATIKONDA, Lakshmi U. and Tatikonda, Rao J., “Overhead Cost Control—through Allocation YANKE, Tracey, see Raby, David J. or Elimination?” 1Q, pp. 37-42. TATIKONDA, Rao J., see Tatikonda, Lakshmi U. ZYDIAK, James L., see Chaudhry, Sohail S. AUTHOR LISTING SUBJECT LISTING Prepared by James A. G. Krupp DENTON, D. Keith, ‘Lessons on Competitiveness: Motorola’s Approach,” 3Q, pp. 22-25. Artificial Intelligence GORDON, Geoffrey L. and Marino, Paulette, “The Use of Production Information in Test Market BYRD, Terry Anthony and Hauser, Richard D., Jr., Decisions,” 2Q, pp. 27-31. “Expert Systems in Production and Operations KOBU, Bulent and Greenwood, Frank, “Continuous Management: Possible Human Side Effects in Improvement in a Competitive Global Implementation,” 4Q, pp. 53-57. Economy,” 4Q, pp. 58-63. PEGELS, C. Carl, “Japanese Management Practices Bar Coding in Japanese Overseas Subsidiaries,” 3Q, pp. 67-72. CARTER, Joseph R., “Implementing Supplier Bar PTAK, Carol A., “MRP, MRP II, OPT, JIT, and Codes,” 4Q, pp. 42-47. CIM—Succession, Evolution, or Necessary Combination,” 2Q, pp. 7-11. CIM (Computer Integrated Manufacturing) ROSS, David F., “Aligning the Organization for World-class Manufacturing,” 2Q, pp. 22-26. ADELSBERGER, Heimo H. and Kanet, John J., “The WISNER, Joel D. and Fawcett, Stanley E., “Linking Leitstand—A New Tool for Computer- Firm Strategy to Operating Decisions through integrated Manufacturing,” 1Q, pp. 43-48. Performance Measurement,” 3Q, pp. 5-11. Distribution /Logistics /Warehousing Inventory Management KRUPP, James A. G., “JIT in Distribution and MEYER, Harry, “An Eight-Step Approach to Warehousing,” 2Q, pp. 18-21. Inventory Accuracy: A Case Study at Leviton Manufacturing Company,” 2Q, pp. 40-42. Financial / Accounting Interfaces NATARAJAN, R., “Inventory Management—The Big Picture,” 4Q, pp. 29-31. SUTTON, Sharon G., “A New Age of Accounting,” RABY, David J., Yanke, Tracey, and Silver, Edward 1Q, pp. 72-75. A., “Inventory Management of Chemical TATIKONDA, Lakshmi U. and Tatikonda, Rao J., Supplies at Alberta Wheat Pool,” 1Q, pp. 1-6. “Overhead Cost Control—through Allocation or Elimination?” 1Q, pp. 37-42. Just-in-Time/Zero Inventory: Theory /Philosophy Forecasting AROGYASWAMY, Bernard and Simmons, Ronald P., “Thriving on Interdependence: The Key to BROWN, Robert G., ‘Profits from Prophets: A JIT Implementation,” 3Q, pp. 56-60. Note,” 3Q, pp. 87-88. CRAWFORD, Karlene M. and Cox, James F., “Addressing Manufacturing Problems through General Management the Implementation of Just-in-Time,” 1Q, pp. 33-36. BOYLE, Darby, Ray, Beverly A., and Kahan, Gerald, INMAN, R. Anthony and Mehra, Satish, ‘JIT “Work Standards—The Quality Way,” 2Q, pp. Applications for Service Environments,” 3Q, 67-73. pp. 16-21. BULLINGTON, Kimball E. and Bullington, Stanley F., “Working Toward World-Class Just-in-Time/Zero Inventory: Case Studies Manufacturing Prior to Top Management Commitment,” 3Q, pp. 31-34. HAHN, Chan K., Watts, Charles A., and Kim, Ki CHOI, Moo-Jin and Riggs, Walter E., “GT Coding Joo, “Order-launching and Delivery Sequencing and Classification Systems for Manufacturing for an Automotive Manufacturer,” 1Q, pp. 49- Cell Design,” 1Q, pp. 28-32. 53. SUBJECT LISTING Lot /Order Sizing PUTTMAN, Michiel T., “Logistics in Process Industries: Is It a Specific Problem?” 3Q, pp. BREGMAN, Robert L., “Selecting among MRP Lot- 61-66. Sizing Methods for Purchased Components TAYLOR, Sam G. and Bolander, Steven F., “Process when the Planning Horizon is Limited,” 2Q, Flow Scheduling Principles,” 1Q, pp. 67-71. pp. 32-39. Production Planning Materials Management (General) BHADURY, Bikash and Agarwal, Sunil K., COLLINS, Joseph J., Sparks, Richard A., Tarrant, “Development of a Production Planning and Ken, and Sumichrast, Robert T., “A Decision- Control System for a Leaf-Spring Support System for Strip Inventory Manufacturing Facility,” 2Q, pp. 1-6. Consolidation,” 4Q, pp. 64-68. DUBOIS, Frank L. and Oliff, Michael D., “Aggregate GRAY, Clifford and Hoesada, Melani, ‘Matching Production Planning in Practice,’’ 3Q, pp. 26- Heuristic Scheduling Rules for Job Shops to the 30. Business Sales Level,”’ 2Q, pp. 12-17. MILLER, Tan C., “Integrating Current End-Item KRUPP, James A. G., “Strategic Issues in Software Inventory Conditions into Optimization-Based Evaluation for Manufacturing Firms,” 1Q, pp. Long-Run Aggregate Production and 11-15. Distribution Planning,” 4Q, pp. 74-80. REIDELBACH, Mark A., “Engineering Change SHAFER, Scott M., “A Spreadsheet Approach to Management for Long-Lead-Time Production Aggregate Scheduling,” 4Q, pp. 4-10. Environments,” 2Q, pp. 84-88. SHIN, Dooyoung and Min, Hokey, “Flexible Line SARKIS, Joseph, “Production and Inventory Control Balancing Practices in a Just-in-Time Issues in Advanced Manufacturing Systems,” Environment,” 4Q, pp. 38-41. 1Q, pp. 76-82. SOUNDERPANDIAN, Jayavel and SCHRAGENHEIM, Eli and Ronen, Boaz, ‘Buffer Balashanmugam, Bala, “Multiproduct, Management: A Diagnostic Tool for Production Multifacility Scheduling Using the Control,” 2Q, pp. 74-79. Transportation Model: A Case Study,” 4Q, pp. SOUTH, John B. and Hansen, Leon, “Large 69-73. Inventories as a Competitive Strategy,” 2Q, pp. 51-54. WALKER, William T., “Master Planning Simulator Provides Real-time Feedback on Plan Effectiveness,”’ 1Q, pp. 54-61. Manufacturing Resources Planning (MRP II) SHELDON, Don, Jr., “MRP Il—What It Really Is,” Purchasing Interface 3Q, pp. 12-15. SPENCER, Michael S., “Using ‘The Goal’ in an CHAUDHRY, Sohail S., Forst, Frank G., and MRP System,” 4Q, pp. 22-28. Zydiak, James L., “A Multicriteria Approach to Allocating Order Quantity Among Vendors,” Materials Requirements Planning (MRP) 3Q, pp. 82-86. ROMERO, Bernardo Prida, “The Other Side of JIT NEELEY, Parley S. and Jurcewsky, James L., in Supply Management,” 4Q, pp. 1-3. “Chaining the Beast: Limiting the Damage of Long MRP Run Times with Postmortem and Pro Forma Analyses,” 3Q, pp. 77-81. Quality Assurance /Control Process Industry HART, Marilyn K., “Quality Control Training for Manufacturing,” 3Q, pp. 35-40. GOLANY, Boaz, Yadin, Micha, and Learner, Oded, RICE, James W., “Zero Defects Through Modular “A Goal Programming Inventory Control Sort Matching,” 4Q, pp. 11-14. Model Applied at a Large Chemical Plant,” 1Q, STEIN, Robert E., “Beyond Statistical Process pp. 16-24. Control,” 1Q, pp. 7-10. SUBJECT LISTING Remanufacturing REIMER, Glenn, ‘Material Requirements Planning and Theory of Constraints: Can They Coexist? PERRY, James H., “The Impact of Lot Size and A Case Study,” 4Q, pp. 48-52. Production Scheduling on Inventory Investment in a Remanufacturing Miscellaneous Environment,” 3Q, pp. 41-45. BULLEN, George N., “Calculating the Economic Equilibrium Point for Tape Proofing in the NC Surveys Machining Cell,” 2Q, pp. 62-66. CHENG, T. C. E., “An EOQ Model with Learning BILLESBACH, Thomas J., “A Study of the Effect on Setups,” 1Q, pp. 83-84. Implementation of Just-in-Time in the United DOMNICK, Frederick A., “On-Hand Balances in States,” 3Q, pp. 1-4. Secondary Locations,” 4Q, pp. 32-37. FREELAND, james R., “A Survey of Just-in-Time FINCH, Byron J. and Luebbe, Richard L., “Risk Purchasing Practices in the United States,” 2Q, Associated with Learning Curve Estimates,” pp. 43-50. 3Q, pp. 73-76. JOHNSON, Dale and LaBarre, James, “Inventory PETROFF, John N. and Hill, Arthur V., “A Control: A Target for MIS Support,” 1Q, pp. Framework for the Design of Lot-Tracing 62-66. Systems for the 1990s,” 2Q, pp. 55-61. VAN DER WALDE, Elissa, ‘Computer Simulation in Synchronous Manufacturi/nOgPT Manufacturing,” 2Q, pp. 80-83. WASCO, W. Calvin, Stonehocker, Robert E., and FAWCETT, Stanley E. and Pearson, John N., Feldman, Larry H., “Success with JIT and MRP “Understanding and Applying Constraint II in a Service Organization,” 4Q, pp. 15-21. Management in Today’s Manufacturing WILSON, Glenn T., “Industrial Robots for Smaller Environments,” 3Q, pp. 46-55. Firms,” 1Q, pp. 25-27. SUBJECT LISTING

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.