REPUBLIC OF ALBANIA HIGH STATE CONTROL DEPARTMENT OF PERFORMANCE AUDIT Adresa: Bulevardi “Dëshmorët e Kombit”, nr. 3, Tiranë; Tel-Fax: 0693067738 E-mail: [email protected]; Web-site: www.klsh.org.al P A R ERFORMANCE UDIT EPORT Procedures of Public Procurement in Albania Report audit performance Auditimi “Procedures of Public Procurement in Albania” Was drafted after the audit carried out on the basis of the audit program approved by the Chairman of the Supreme Audit Institution no. 1226/1, dated 02.12.2016. The report has been drafted by the audit team in accordance with the standards and guidelines for performance audit, namely: INTOSAI Auditing Standards and Field Experience, Performance Audit Guide ISSAI 3000-3100, Performance Audit Department Manual, Performance Indicators, Also the Institutional Interior Regulation. The drafting of the program, audit, draft report and report of this audit was carried out with the assistance and collaboration of SNAO (Sweden), ECA (European Court of Accounts) specialists based on the regional PPA performance audit project II on "Public Procurement", where SAI engaged with SAI of the region (Bosnja, Kosova, Maqedonia, Mali i Zi, Serbia, Turqia) in order to carry out joint audits as an excellent opportunity to advance in performance audits to further deepen regional co-operation and profitability From common experiences to improve the quality of this audit. HIGH STATE CONTROL DEPARTMENT OF PERFORMANCE AUDIT PPA II / REPORT “PROCEDURES OF PUBLIC PROCUREMENT IN ALBANIA” CONTENT 1. BACKGROUND, MOTIVES AND MAIN MESSAGE ................................................................ 4 1.1 AUDIT PROBLEM ....................................................................................................................................... 5 1.2 AUDIT OBJECTIVE..................................................................................................................................... 5 1.3 AUDIT SCOPE ......................................................................................................................................... 5 1.4 AUDIT CRITERIA ....................................................................................................................................... 5 1.5 AUDIT METHODOLOGY ................................................................................................................... 5 1.6 AUDIT INCLUDED INSTITUTIONS AUDIT AREA ......................................................................... 6 2. QUESTIONS…………………………………………………………………………………………………………………………………………..6 3. EXPLANATION OF QUESTIONS/FINDINGS/CONCLUTIONS / RECOMMENDATIONS ... 7 3.1. DOES APP HAS IMPLEMENTED MONITORING FUNCTION PROPERLY FOLLOWED THE PROCEDURES OF PUBLIC PROKUREMENT? ................................................................................................................................ 7 3.1.1. Does APP has monitored technical criteria set by competitive procurement Authority which have passed the pricedure (negotiated without prior puplication of a contact notice), before and after the transition? ................................................................................................................................................... 7 3.1.2. Does APP has monitored argument “emergency” use of negotiated procedure without prior publication of a contact notice? ................................................................................................................ 28 3.1.2.1. Does APP has proven in field emergency for this procedure? ....................................................... 28 3.1.2.2. Is there a legal basis leading to creating fictitious emergency for this procedure?........................... 36 4. REFERENCE/ANEX .................................................................................................................... 53 4.1. REFERENCE ........................................................................................................................................... 53 4.2. ANEX ..................................................................................................................................................... 57 5. AUDIT TEAM ............................................................................................................................... 62 2 HIGH STATE CONTROL DEPARTMENT OF PERFORMANCE AUDIT PPA II / REPORT “PROCEDURES OF PUBLIC PROCUREMENT IN ALBANIA” LISTA E SHKURTIMEVE SAI High State Control INTOSAI The International Organization of High Audit Institutions EUROSAI European Higher Institutions ISSAI International Standards of Supreme Audit Institutions PPA Public Procurement Agency MOH Ministry Healthy MTI Ministry of Transport and Infrastructure UHT University Hospital "Mother Teresa" Tirana ARA The Albanian Road Authority INSTAT Institute of Statistics MSA Stabilization and Association Agreement BB World Bank UNESCO United Nations Educational, Scientific and Cultural Organization USAID United States Agency for International Development UNDP United Nations Development Programme OECD Organization for Economic Co-operation and Development BE European Union NS National Strategy SDI Strategy for Development and Integration NPEI National Plan for European Integration CMD The Council of Ministers Decision LPP Law on Public Procurement PM Procurement Manual PA Procurement Advocate PPC Public Procurement Commission CA Contracting Authority OE Economic Operator STD Standard Tender Documents PAB Public Announcement Bulletin TI Tender Invitation PO Procurement Order TS Technical Specification EPS Electronic Procurement System BEC Bid Evaluation Commission 3 HIGH STATE CONTROL DEPARTMENT OF PERFORMANCE AUDIT PPA II / REPORT “PROCEDURES OF PUBLIC PROCUREMENT IN ALBANIA” 1. BACKGROUND, MOTIVES AND MAIN MESSAGE Nowadays, the challenge in drafting effective procedures in public procurement has to do with the growing need for more transparency, public trust and minimum abuse potential, because in many cases the performance of public procurement is measured in figures, thus forgetting the real thing, which is how the contracting authorities deliver the procurement of goods, services and public works. HSC is engaged in this specific performance audit to generate recommendations on how to improve and modernize the system of public procurement procedures, using the least amount of public funds and avoiding abuse in favor of private operators, because the current system does not fully reflect the selection criteria of winners in line with: 1. Non discriminating and equal treatment policies of private operators; 2. Transparency in the public procurement procedures, and; 3. Equality in treating the demands and responsibilities of applicants. The main pillars of public procurement, stated in our Law, are: competitiveness, equal access, nondiscrimination and transparency, in order to guarantee that the optimal public goods, services and works are delivered with the best prices, not affecting their quality. Although these changes have been for the best, still a lot of issues remain present, like: Frequent changes of the law on public procurement; Opportunity to interpret the law in different ways, thus affecting the responsibility of civil servants engaged in the process; Using different procedures when procuring the same goods in different time-periods for the same institutions or in different institutions but for the same time-period; Problems in deciding the upper spending limit; The professionalism of staff appointed to set up the technical criteria and the staff who evaluates the offers against those criteria; The lack of expertise in planning and executing the tender procedures; High turnover of staff throughout public administration; Managing the electronic public procurement system; Training of civil servants engaged in public procurement procedures. Main message of this audit is: "The Public Procurement Agency, in cooperation with field specialists, legislative institutions and interest groups, has to creates confidence through the dynamic process of drafting the policy of public procurement process" Negotiation without prior notice of contract notice "for the reduction of abuses and guarantee of public funds. 4 HIGH STATE CONTROL DEPARTMENT OF PERFORMANCE AUDIT PPA II / REPORT “PROCEDURES OF PUBLIC PROCUREMENT IN ALBANIA” 1.1 AUDIT PROBLEM Is the performance assessment of the public procurement procurement procedure without the announcement of the contract notice, the modernization and standard setting, the increase of public confidence, business and other stakeholders for this public service. 1.2 AUDIT OBJECTIVE It is an objective analysis of the instruments that state structures have available to increase institutional and personal responsibilities in the public sector to stimulate free economic initiative and fair competition. 1.3 AUDIT SCOPE Is to improve transparency in using the negotiation procedure without prior announcement of the contract notice by ensuring compliance with public procurement procedures in accordance with the law and ensuring optimal use of the budget in the public interest. 1.4 AUDIT CRITERIA Political criteria: The Constitution of the Republic of Albania; The law "On the organization and functioning of the Supreme State Control"; Law "On public procurement"; Decisions; Instructions; etc. Monitoring and reporting criteria: Analysis of the activity of the Public Procurement Agency; regulation; manual; Guidance on the selection of public contracts; Public Procurement Manual; Guidelines and Performance Audit Manual of SAI and SAI; Technical criteria: Monitoring reports; methodology, technique, monitoring the use of electronic procurement system; Other criteria/best practices: Indicators of Performance, SNAO, ECA; Reports with the best international experience; SAI audit reports, the Ministry of Finance and Internal Audit 1.5 AUDIT METHODOLOGY In this performance audit, the audit team selected as the most appropriate audit oriented approach to the outcome. Consequently, the methodology used is normative and contains evaluation, comparative, analytical and recommendation elements. The methods used to support the selected methodology are as follows: Collecting and reviewing documentation and physical evidence; Study of organization and the whole process; Study of domestic and foreign legislation, as well as regulations, manuals referred to; Interviews and open questions, qualitative and quantitative analysis and analysis of their responses; Verbal interviews with managerial staff and employees, getting their opinions; Direct observations in public procurement units; Closed questionnaire; Processing and qualitative and quantitative analysis of the answers to the questionnaires; Evaluating the public procurement system provided and comparing with national standards or best practices; 5 HIGH STATE CONTROL DEPARTMENT OF PERFORMANCE AUDIT PPA II / REPORT “PROCEDURES OF PUBLIC PROCUREMENT IN ALBANIA” 1.6 AUDIT INCLUDED INSTITUTIONS AUDIT AREA o Public Procurement Agency; o Albanian Road Authority and Regional Directorates; o General Directorate of the "Mother Teresa" Hospital Center Tirana; o Regional hospitals (Shkodra, Kukës, Debar, Berat, Saranda,); o Municipalities with the largest funds procured and the most prominent phenomena encountered during the audit and specifically (Lezha, Vlora, Fier, Korça, Gjirokastra) 2. QUESTIONS 1. Main Question: Does APP has implemented monitoring function properly followed the procedures of public procurement? (Case study: Albanian Road Authority and the Regional Directorates, the Directorate General Hospital Center "Mother Teresa" of other regional hospitals, municipalities with larger funds procured). 1.1 Does APP has monitored technical criteria set by Competitive Procurement Authority which have passed the procedure (negotiated without prior publication of a contract notice), before and after the transition? 1.2 Does APP has monitored argument "emergency" use of the negotiated procedure without prior publication of a contract notice? 1.2.1 Does APP has proven in field emergency for this procedure? 1.2.2 Is there a legal basis leading to creating fictitious emergency for this procedure? 6 HIGH STATE CONTROL DEPARTMENT OF PERFORMANCE AUDIT PPA II / REPORT “PROCEDURES OF PUBLIC PROCUREMENT IN ALBANIA” 3. EXPLANATION OF QUESTIONS / FINDINGS / CONCLUTIONS / RECOMANTIONS 3.1. Does APP has implemented monitoring function properly followed the procedures of public procurement? Some history; The Public Procurement Procedure in our country is an early recognition since the first legal beginnings date back to the mid-30s, which give off to exist after the mid-40s, emerging after the 1990s. The public procurement procedure is tightly linked to the political history of the country. The footprints of these first procedures are contained in a separate chapter of an act published in the Official Journal on May 22, 1936, pages 3-9, where it is shown that through a competitive procedure the realization of public contracts by the state administration for private entrepreneurs for the purchase of goods, Services or works. Also in this chapter are the types of contracts allowed and the legal form to enter into these contracts. According to Article 19 of this Act, contracts awarded by the state administration for its needs for goods, services, works, sales, and concessions shall be considered as legal only if they are granted according to the following processes: by public auction; by invitation to bid by private agreement. In this act, the criterion for selecting one of the procurement procedures (either by a general public auction or by a less transparent procedure such as a private bidding offer) was in essence similar to those foreseen by current public procurement legislation . Light change is more of a terminology term than the content of the rules. With the change of the system at the destination of liberation, the coup was nationalized by being centralized in a single, for a period of about 50 years, the public procurement procedure ceased to exist. By prohibiting private acquisition, the system did not allow the concept of public procurement, which essentially is a contract between a public entity and a private entity. After 1990, with political changes in the country, there was a return to the "private" or private property concept, which inevitably restored the concept of "public procurement procedures". So for the first time this procedure was sanctioned by DCM no. 400, dated 17.11.1990 "On the purchase and realization of services outside the state sector", which stipulates that enterprises and institutions for the fulfillment of their assets should be allowed to purchase the first assets such as equipment, goods, materials and payment services, where The valuation criteria were either the price previously approved, or the lowest price, evaluated by a commission established within the institution. With the passage of the first phase of transition, the evolution of economy, the free market and the development of private entrepreneurship, time also required an evolution of the legal framework that regulated the public procurement system in Albania. Thus, DCM no. 191, dated 22.03.1993 "On the Public Procurement System and the Acquisition and Services Activity of Enterprises and Institutions Financed with the State Budget", the provisions and detailed rules for the purchase of goods and services were provided, but it should be emphasized that the term "Public procurement" has not yet been presented. However, this act mentioned for the first time the foreign private economic entities, which were presented as potential entrepreneurs to win public contracts from state institutions. Also, 7 HIGH STATE CONTROL DEPARTMENT OF PERFORMANCE AUDIT PPA II / REPORT “PROCEDURES OF PUBLIC PROCUREMENT IN ALBANIA” this decision would also define other elements as the criterion of valuation, which in this case were the lowest bid price and evaluation by the Bid Evaluation Commission. Particularly of this phase is the fact that public works (public constructions) do not mention the deeds that envisage the process Of awarding a public contract. The term "Procurement", referring to the purchase of goods, works and services, is used for the first time by the DCM no. 467 dated 17.08.1993 "On procurement procedures with public funds". Through this decision is regulated in more detailed and complete procedure of public procurement. In this decision, investments are mentioned for the first time, stipulating that the selection of private contractors for contract award should be made through a public procurement process. The decision gives a clear definition of the procurement processes with all its elements where are emphasized for the first time different procurement procedures. This decision is of great importance for the time, as it is the pre-normative act, which foresees and regulates fully the public procurement system in Albania. Realizing the great importance of public procurement procedures and the development of the market economy, it was important to have a law existed. In this context, the law no. 7971 dated 26.07.1995 "On Public Procurement". This law created the first normative ground on which public procurement practices were based. Despite the shortcomings and ambiguities it contained, his camera in sanctioning some basic principles that would be repeated, strengthened and supplemented by the emerging legislation. Since 2006, public procurement procedures in Albania are regulated by law no. 9643, dated 20.11.2006 "On Public Procurement", as amended, and bylaws for its implementation. With the ongoing legal changes and arrangements in the field of public procurement it is important to apply in practice its important principles such as transparency, equality, competition Free and non-discrimination in the public procurement process to ensure the efficient use of public funds, and on this basis an e-procurement platform has been established, a system that is fully functional since 2009. With the introduction of electronic procurement of all procurement with Worth more than € 3,000 has been considered by the European Union and other international institutions as one of the greatest achievements since 1990. For this achievement in 2010, the United Nations lists the Public Procurement Agency as the country's winner Second prize for 2010 for the Public Services Prize in the category "Improving it Transparency, accountability and accountability in the Public Service ", due to the results achieved by the implementation of the e-procurement system. The implementation of legislation on public procurement is exercised through:. Public Procurement Agency, which is the central body for coordination of the public procurement system in the country, and support for the implementation of procurement procedures. Public Procurement Committee which is responsible for reviewing the complaints against procurement procedures. Public Procurement Agency The Public Procurement Agency was established for the first time by Decision no. 496 dated 18.09.1995 "On the functioning of the Public Procurement Agency", pursuant to Law no. 7971, dated 26.07.1995 "On Public Procurement" as a central body subordinate to the Council of Ministers for the coordination and improvement of the procurement system, with nine total employees. Public Procurement Agency with the approval of law no. 9643 dated 20.11.2006 "On Public Procurement" was consolidated as the main institution in the field of public procurement where its activity is sanctioned in Article 13 of this Law, which provides for the main 8 HIGH STATE CONTROL DEPARTMENT OF PERFORMANCE AUDIT PPA II / REPORT “PROCEDURES OF PUBLIC PROCUREMENT IN ALBANIA” competencies as a central body, a public legal entity, subordinated to the Prime Minister , Funded by the State Budget. The Public Procurement Agency from 2009 is also responsible for the administration and maintenance of the electronic procurement system, which enables the electronic execution of the procurement procedures in Albania. Also the PPA exercises its competences not only in the field of public procurement, but also in the field of concessions and public auction: in the field of concessions, carries out duties as provided in Article 6 of Law 9663/2006 "On Concessions" and with the repeal of Law 125/2013 "On Concessions and Public Private Partnership", the competences are re-dimensioned in Article 11 his. in the field of auctions, exercises powers under Article 7 of Law 9874/2008 "On Public Auction". 9 HIGH STATE CONTROL DEPARTMENT OF PERFORMANCE AUDIT PPA II / REPORT “PROCEDURES OF PUBLIC PROCUREMENT IN ALBANIA” 3.1.1. Does APP has monitored technical criteria set by Competitive Procurement Authority which have passed the procedure (negotiated without prior publication of a contract notice), before and after the transition? Public procurement is the process of selection by the Contracting Authorities, through a public competition process, of the economic operators with whom it will enter into a public contract for the provision of goods, services or works, against payment of public funds. This competition process, being directly related to public funds, is developed according to some rules sanctioned in public procurement legislation. The main purpose of the public procurement process is the cost effectiveness and value for ALL. Public procurement is an economic activity that aims to use / spend taxpayers money in the most effective way possible, while value for money in the context of public procurement is the best quality for a reasonable price in a timely manner. Meanwhile, the quality of the public procurement system is directly related to the smooth running of the entire procurement cycle, which must be timely, properly and in compliance with the applicable public procurement legislation. In order to carry out a procurement procedure, all elements and parties in a procurement process should exist at the same time. So, public procurement performance is not only measured in figures (money-saving value ???), but the way procurement of goods, works and services is carried out reflects on the social issues of citizens and taxpayers to; fighting corruption, Ensure optimal use of public budget in the public interest, Increase institutional responsibility; Increase personal accountability in the public sector, stimulate a sound business environment, free economic initiative and fair competition. Law no. 9643, dated 20.11.2006 "On Public Procurement" in its Article 33 defines the use of the public procurement procedure "Negotiation, without prior notice of contract notice" and specifically "the Contracting Authority for contracts with value above or below the low monetary threshold , May use the negotiated procedure without prior notice of announcement, only in special circumstances, in accordance with this Article and in the public procurement rules. The use of this procedure should not lead to the avoidance of competition or the discrimination of candidates ... ", also following it are given all the cases when this procedure can be used which are not few but 12 possibilities of its use . For the foregoing and if we refer to the law, it makes a definition of the negotiation procedure without announcement and use cases. If the law and procurement rules were read carefully it would be concluded that there is a procurement procedure, which is less transparent than the others, does not allow publication, does not allow broad participation of economic operators, the use of Her by contracting authorities may become abusive and lead to avoiding competition or discrimination of candidates and as such, it should not be the preferred procedure. Under these conditions we consider that it should be one of the most monitored procedures and analyzed by the Public Procurement Agency, so that this procedure can be used only for the sake of extreme need, caused by unforeseeable events by the contracting authority. 10
Description: