ebook img

piping legend valve legend abbreviations designation indicator general general notes repair ... PDF

50 Pages·2014·13.74 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview piping legend valve legend abbreviations designation indicator general general notes repair ...

GENERAL NOTES ABBREVIATIONS VALVE LEGEND GENERAL PIPING LEGEND ACT ACOUSTICAL TILE 1. PIPING AND EQUIPMENT IS SHOWN DIAGRAMMATICALLY. THE ACTUAL ROUTING OF PIPING AND AFF ABOVE FINISH FLOOR BALL VALVE FD FLOOR DRAIN CW COLD WATER EXACT LOCATION OF EQUIPMENT SHALL BE DETERMINED IN THE FIELD. AP ACCESS PANEL NC BALL VALVE (NORMALLY CLOSED) RD ROOF DRAIN COLD WATER BELOW SLAB 2. REVIEW AND COORDINATE WITH THE OTHER TRADES (CIVIL, STRUCTURAL, ARCHITECTURAL, ARCH ARCHITECT GATE VALVE TD TRENCH DRAIN HW HOT WATER FIRE PROTECTION, HVAC, AND ELECTRICAL). BLDG BUILDING NC GATE VALVE (NORMALLY CLOSED) AD AREA DRAIN HOT WATER BELOW SLAB 3. FURNISH AND INSTALL ALL NECESSARY PIPING, EQUIPMENT SUPPORTS AND ANY EQUIPMENT CFH CUBIC FEET PER HOUR NOT SHOWN ON DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS BUT NECESSARY TO CFM CUBIC FEET PER MINUTE OS&Y OUTSIDE SCREW AND YOKE VALVE CO CLEANOUT HWR HOT WATER RETURN PROVIDE A COMPLETE AND WORKABLE SYSTEM. CI CAST IRON BUTTERFLY VALVE FCO FLOOR CLEANOUT HOT WATER RETURN BELOW SLAB 4. PROVIDE ACCESSIBLE SHUTOFF VALVES ON ALL BRANCH PIPING AND ON ALL SUPPLY PIPING TO CLG CEILING INDIVIDUAL FIXTURES AND EQUIPMENT. CHECK VALVE GCO GRADE CLEANOUT S or W SOIL OR WASTE ABOVE GROUND CLDI CEMENT LINED DUCTILE IRON 5. PROVIDE ACCESS TO ALL EQUIPMENT REQUIRING PERIODIC SERVICE AND MAINTENANCE. CO CLEANOUT BALL VALVE (GAS) P-TRAP S or W SOIL OR WASTE BELOW SLAB 6. FURNISH ACCESS PANELS TO THE GENERAL CONTRACTOR FOR INSTALLATION UNDER THE CONC CONCRETE GAS COCK ELBOW UP OR RISE V VENT ABOVE GROUND RELATED TRADES. CONT CONTINUATION PLUG VALVE ELBOW DOWN OR DROP V VENT BELOW SLAB 7. PITCH ALL WATER LINES TO DRAIN. CONTR CONTRACTOR CAP OR END OF PIPE MV MIXING VALVE CP CHROME PLATED SW SW SPECIAL WASTE ABOVE GROUND 8. INSTALL HORIZONTAL RUNS OF WATER PIPING AS HIGH AS POSSIBLE AND PROVIDE DRAIN-OFFS CW COLD WATER BALANCING VALVE HB HB HOSE BIBB AT ALL LOW POINTS. SW SW SPECIAL WASTE BELOW SLAB DCVA DOUBLE CHECK VALVE ASSEMBLY ANGLE VALVE WH WH WALL HYDRANT 9. HOT WATER TAKEOFFS SHALL HAVE NOT LESS THAN THREE ELBOW SWINGS. SV SV SPECIAL VENT ABOVE GROUND COMPRESSED AIR STATION DIA DIAMETER TEMPERATURE AND PRESSURE CA CA 10. PROVIDE DRAIN VALVE ON HOUSE SIDE OF WATER METER. T&P SEE DETAIL 06 ON PLM-600 RELIEF VALVE SV SV SPECIAL VENT BELOW SLAB DN DOWN TEE LOOKING UP 11. PIPING SHALL RUN CONCEALED IN ALL AREAS WITH THE EXCEPTION OF MECHANICAL ROOMS, VACUUM RELIEF VALVE DWG DRAWING RL RL RAIN LEADER ABOVE GROUND AREAS WHERE NO CEILING EXISTS OR WHERE NOTED ON THE PLANS. TEE LOOKING DOWN EC ELECTRICAL CONTRACTOR AQUASTAT RL RL RAIN LEADER BELOW SLAB 12. INSTALL DIELECTRIC COUPLINGS BETWEEN DISSIMILAR MATERIALS. EL/ELEV ELEVATION UNION T THERMOMETER IW IW INDIRECT WASTE 13. PROVIDE DANDY CLEANOUTS AT THE BASE OF ALL SANITARY AND RAINWATER STACKS. FCO FLOOR CLEANOUT VIV VALVE IN VERTICAL PRESSURE REDUCING/REGULATING PRV FFE FINISH FLOOR ELEVATION VALVE G G NATURAL GAS PIPING REDUCED PRESSURE ZONE 14. PROVIDE DRIP LEGS FOR ALL GAS RISERS. RPBP BACKFLOW PREVENTER P-# FIXTURE NUMBER PG PRESSURE GAUGE GV GV GAS VENT PIPING 15. AN AIR GAP OF AT LEAST TWICE THE EFFECTIVE DIAMETER OF THE DRAIN SERVED SHALL BE FLR FLOOR STRAINER BACK WATER VALVE PROVIDED ON ALL EQUIPMENT DRAINS PIPED TO FLOOR DRAINS. TW TW TEMPERED WATER FP FIRE PROTECTION WATER HAMMER WHA/SA 16. REQUIRED FIRE RESISTANCE RATING OF FLOORS, WALLS AND CEILINGS SHALL BE MAINTAINED FS FLOW SWITCH GLOBE VALVE ARRESTOR/SHOCK ABSORBER A A,CA COMPRESSED AIR WHEN PIPE PENETRATIONS ARE MADE. FT FOOT FLOW SWITCH FLOW IN DIRECTION OF ARROW NP NPCW NON POTABLE COLD WATER 17. REFER TO RISER DIAGRAMS AND DETAILS FOR PIPE AND EQUIPMENT SIZES NOT SHOWN ON THE FV FLUSH VALVE S SOLENOID VALVE DIRECTION OF SLOPE PLANS. TP TP TRAP PRIMER GALV GALVANIZED NEEDLE VALVE CNR CONCENTRIC REDUCER 18. ALL WORK SHOWN ON RISER DIAGRAMS BUT NOT ON PLANS OR VICE VERSA SHALL BE GC GENERAL CONTRACTOR INCLUDED AS IF SHOWN ON BOTH. M MOTOR OPERATED GATE VALVE PIPE SLEEVE GI GREASE INTERCEPTOR GPF GALLON PER FLUSH M MOTOR OPERATED BALL VALVE ECC ECCENTRIC REDUCER GPM GALLONS PER MINUTE DOUBLE WALL PIPING HC HANDICAPPED DESIGNATION INDICATOR PIPE ANCHOR HW HOT WATER DETAIL DESIGNATION NUMBER HWR HOT WATER RETURN 1 PIPE GUIDE P-1 ID INSIDE DIAMETER DETAIL DESIGNATION DRAWING EXPANSION JOINT INV INVERT FLEXIBLE CONNECTOR IW INDIRECT WASTE RISER SERVICE DESIGNATION IN-LINE FILTER F 1 LPC LIMIT OF PLUMBING CONTRACTOR RISER NUMBER DESIGNATION P-1 FM FLOW METER RISER DESIGNATION DRAWING MECH MECHANICAL NC NORMALLY CLOSED LIMIT OF WORK NO NORMALLY OPEN HC HANDICAPPED ACCESSIBLE NTS NOT TO SCALE SECTION DESIGNATION LETTER A NIC NOT IN CONTRACT P-1 SECTION DESIGNATION DRAWING NUM KEY NOTE DESIGNATION OD OUTSIDE DIAMETER TP OED OPEN END DRAIN TP TRAP PRIMER PC PLUMBING CONTRACTOR PLBG PLUMBING PSI POUNDS PER SQUARE INCH REDUCED PRESSURE BACKFLOW RPBP PREVENTER SA SHOCK ABSORBER SPEC SPECIFICATION SS SOIL STACK SV SPECIAL VENT SVTR SPECIAL VENT THRU ROOF SW SPECIAL WASTE ST.ST. STAINLESS STEEL T P-TRAP TW TEMPERED WATER TYP TYPICAL V VENT VB VACUUM BREAKER VS VENT STACK VTR VENT THRU ROOF W WASTE DESIGNER/DRAFTER SIGNATURE/BLOCK: PROJECT TITLE TOWN PROJECT NO. RHL 118-0167 THE INFORMATION, INCLUDING ESTIMATED QUANTITIES OF WORK, SHOWN ON THESE ROCKY HILL CHECKED BY: SHEETS IS BASED ON LIMITED INVESTIGATIONS BY THE STATE AND IS RSL STATE OF CONNECTICUT REPAIR FACILITY DRAWING NO. IN NO WAY WARRANTED TO INDICATE PLM-002 THE CONDITIONS OF ACTUAL QUANTITIES SCALE DEPARTMENT OF TRANSPORTATION DRAWING TITLE OF WORK WHICH WILL BE REQUIRED. SHEET NO. PLUMBING LEGEND 1/8" = 1'-0" 09.02 NO. Revision Description Date Plotted: 6/9/2014 5:15:57 PM File Name: MPFP_CTDOT_Rocky Hill Repair Facility_Central.rvt 1 3 4 5 66.2 77.2 8 9 10 10.7 11 11.711.9 12 13 1414.514.6 15 15.4 16 17 18 18.8 1919.1 19.5 2020.2 21 K J.9 J I.5 I GH.9 G.1 G F E.4 E D.9 D.6 D C F B.1 B N KEY PLAN A A B C D F 1 PLUMBING - 00 FOUNDATION OVERALL E SCALE: 3/64" = 1'-0" G DESIGNER/DRAFTER SIGNATURE/BLOCK: PROJECT TITLE TOWN PROJECT NO. RHL 118-0167 THE INFORMATION, INCLUDING ESTIMATED QUANTITIES OF WORK, SHOWN ON THESE ROCKY HILL CHECKED BY: SHEETS IS BASED ON LIMITED INVESTIGATIONS BY THE STATE AND IS RSL STATE OF CONNECTICUT REPAIR FACILITY DRAWING NO. IN NO WAY WARRANTED TO INDICATE PLM-100U THE CONDITIONS OF ACTUAL QUANTITIES SCALE DEPARTMENT OF TRANSPORTATION DRAWING TITLE PLUMBING UNDERGROUND - OF WORK WHICH WILL BE REQUIRED. SHEET NO. 3/64" = 1'-0" OVERALL 09.03 NO. Revision Description Date Plotted: 6/9/2014 5:16:15 PM File Name: MPFP_CTDOT_Rocky Hill Repair Facility_Central.rvt 4 5 6 6.2 7 8 9 10 10.7 11 11.7 11.9 12 13 7.2 A B N N A A L L INV. EL. = 135'+/- 5'-0" INV. EL. = 135'+/- 5'-0" INV. EL. = 135'+/- 5'-0" RTP RTP = = = A A PC (2)1/2"TP UP PC PC P P L L L K 4"RL 4"RL 4"RL J.9 6"SW UP & T (5,320SF) (5,320SF) (3,488SF) J (2)1/2"TP UP 6"SW UP TO FCO 3"SV UP 4"SW UP & T I.5 SW SV SV 4"SW UP & T (2)2"SV UP I (2)2"SV RISE TO 6" ABOVE FLOOD RIM 6"SW UP & T W S 3"SV UP H G.9 6"SW UP & T 6"SW UP & T 6"SW UP & T PART PLAN A PART PLAN C 1/2"TP UP 3"SV UP 3"SV UP G.1 1/2"TP UP G 3"SV UP 2"W UP F SW (4)1/2"TP UP PLUMBING - FOUNDATION - PART PLAN A - NORTH REPAIR BAYS 1 SCALE: 1/8" = 1'-0" N KEY PLAN A B C D F E G DESIGNER/DRAFTER SIGNATURE/BLOCK: PROJECT TITLE TOWN PROJECT NO. RHL 118-0167 THE INFORMATION, INCLUDING ESTIMATED QUANTITIES OF WORK, SHOWN ON THESE ROCKY HILL CHECKED BY: SHEETS IS BASED ON LIMITED INVESTIGATIONS BY THE STATE AND IS RSL STATE OF CONNECTICUT REPAIR FACILITY DRAWING NO. IN NO WAY WARRANTED TO INDICATE PLM-101U THE CONDITIONS OF ACTUAL QUANTITIES SCALE DEPARTMENT OF TRANSPORTATION DRAWING TITLE PLUMBING UNDERGROUND - OF WORK WHICH WILL BE REQUIRED. SHEET NO. 1/8" = 1'-0" PART PLAN A 09.04 NO. Revision Description Date Plotted: 6/9/2014 5:16:23 PM File Name: MPFP_CTDOT_Rocky Hill Repair Facility_Central.rvt 13 14 14.514.6 15 15.4 16 17 18 18.8 19 19.1 19.5 20 20.2 21 A B N N A A L L P P " 0 RT RT INV. EL. = 135'+/- 5'- LPC = 5'-0" A A = INV. EL. = 135'+/- P P C (2)1/2"TP UP P L K 4"RL 4"RL J.9 (5,450SF) (5,285SF) J (2)2"SV RISE TO 6"ABOVE FLOOD RIM I.5 4"SW UP TO FCO 6"SW UP & T SW 3"SV UP I 4"W UP & T (2)2"SV UP 6"SW UP TO FCO (2)1/2"TP UP H G.9 W S W S 6"SW UP & T 6"SW UP & T G.1 3"SV UP G 1/2"TP UP 3"SV UP PART PLAN B F PART PLAN F PLUMBING - FOUNDATION - PART PLAN B - SOUTH REPAIR BAYS 1 SCALE: 1/8" = 1'-0" N KEY PLAN A B C D F E G DESIGNER/DRAFTER SIGNATURE/BLOCK: PROJECT TITLE TOWN PROJECT NO. RHL 118-0167 THE INFORMATION, INCLUDING ESTIMATED QUANTITIES OF WORK, SHOWN ON THESE ROCKY HILL CHECKED BY: SHEETS IS BASED ON LIMITED INVESTIGATIONS BY THE STATE AND IS RSL STATE OF CONNECTICUT REPAIR FACILITY DRAWING NO. IN NO WAY WARRANTED TO INDICATE PLM-102U THE CONDITIONS OF ACTUAL QUANTITIES SCALE DEPARTMENT OF TRANSPORTATION DRAWING TITLE PLUMBING UNDERGROUND - OF WORK WHICH WILL BE REQUIRED. SHEET NO. 1/8" = 1'-0" PART PLAN B 09.05 NO. Revision Description Date Plotted: 6/9/2014 5:16:30 PM File Name: MPFP_CTDOT_Rocky Hill Repair Facility_Central.rvt 1 3 4 5 6 6.2 6"SW UP & T PART PLAN A 3"SV UP (2)2"SV UP PART PLAN C G.1 G F 3"SV UP SW (4)1/2"TP UP 6"SW UP TO FCO 6"SW UP & T (2)2"SV RISE TO 6" ABOVE FLOOD RIM 4"SW UP & T W S 4"W UP & T E.4 6"SW UP TO FCO 6"SW UP TO FCO 4"SW UP & T SW D.9 4"SW UP & T (2)2"SV RISE TO 6"SW UP & T 3"SW UP & T 6" ABOVE FLOOD RIM 3"SV UP 6"SW UP TO FCO 6"SW UP & T W S 2"SV UP 8"RL UP SW (14,576SF) 3"SV UP D.6 " 0 (2)2"SV UP (4)1/2"TP UP 5'- PART PLAN C 3"SV UP = C PART PLAN D INV. EL. = 135.1'+/- P L D PLUMBING - FOUNDATION - PART PLAN C - LUBE & WASH BAYS 1 SCALE: 1/8" = 1'-0" N KEY PLAN A B C D F E G DESIGNER/DRAFTER SIGNATURE/BLOCK: PROJECT TITLE TOWN PROJECT NO. RHL 118-0167 THE INFORMATION, INCLUDING ESTIMATED QUANTITIES OF WORK, SHOWN ON THESE ROCKY HILL CHECKED BY: SHEETS IS BASED ON LIMITED INVESTIGATIONS BY THE STATE AND IS RSL STATE OF CONNECTICUT REPAIR FACILITY DRAWING NO. IN NO WAY WARRANTED TO INDICATE PLM-103U THE CONDITIONS OF ACTUAL QUANTITIES SCALE DEPARTMENT OF TRANSPORTATION DRAWING TITLE PLUMBING UNDERGROUND - OF WORK WHICH WILL BE REQUIRED. SHEET NO. 1/8" = 1'-0" PART PLAN C 09.06 NO. Revision Description Date Plotted: 6/9/2014 5:16:36 PM File Name: MPFP_CTDOT_Rocky Hill Repair Facility_Central.rvt 6 6.2 7 8 9 10 10.7 11 11.7 11.9 12 7.2 1/2"TP UP 3"SV UP 3"SV UP 1/2"TP UP G.1 G F W W S S 6"SW UP TO FCO E.4 6"SW UP TO FCO SW E D.9 W 2"W UP S (2)1/2"TP UP 3"SV UP D.6 6"W UP TO FCO 6"SW UP & T W S 6"W UP TO FCO W C D N N A A D L L P P T T R R 0" PA PA 5'- PART PLAN D = INV. EL. = 134.25'+/- C PART PLAN E P L (2)1/2"TP UP (2)2"V UP PLUMBING - FOUNDATION - PART PLAN D - STORES 1 N SCALE: 1/8" = 1'-0" KEY PLAN A B C D F E G DESIGNER/DRAFTER SIGNATURE/BLOCK: PROJECT TITLE TOWN PROJECT NO. RHL 118-0167 THE INFORMATION, INCLUDING ESTIMATED QUANTITIES OF WORK, SHOWN ON THESE ROCKY HILL CHECKED BY: SHEETS IS BASED ON LIMITED INVESTIGATIONS BY THE STATE AND IS RSL STATE OF CONNECTICUT REPAIR FACILITY DRAWING NO. IN NO WAY WARRANTED TO INDICATE PLM-104U THE CONDITIONS OF ACTUAL QUANTITIES SCALE DEPARTMENT OF TRANSPORTATION DRAWING TITLE PLUMBING UNDERGROUND - OF WORK WHICH WILL BE REQUIRED. SHEET NO. 1/8" = 1'-0" PART PLAN D 09.07 NO. Revision Description Date Plotted: 6/9/2014 5:16:42 PM File Name: MPFP_CTDOT_Rocky Hill Repair Facility_Central.rvt 10.7 11 11.7 11.9 12 13 14 141.54.6 3"SV UP G.1 G F 2"W UP W S E.4 6"SW UP TO FCO E D.9 W (3)1/2"TP UP 2"W UP & T 3"W UP & T 2"W UP & T 2"V UP 2"W UP 4"W UP (2)2"V UP 4"W UP TO FCO TO FCO (3)1/2"TP UP 12"RL UP 2"W UP & T (31,494SF) 2"V UP D.6 6"W UP TO FCO 4"W UP 3"W UP & T W W 2"W UP TO FCO 3"W UP 2"V UP S 2"W UP & T 2"V UP PART PLAN D W PART PLAN E D 3"W UP 3"W UP 2"V UP 3"W UP & T (2)1/2"TP UP (2)2"V UP 2"W UP 2"W UP 2"W 3"W UP TO FCO 3"W UP & T W S W L R 3"W UP & T 6"W C IINNVV.. EELL.. == 113333..11''++//-- 6"RL UP (3,466SF) SW SSWW 2"W UP 6"RL UP 6"W UP & T (3,466SF) 6"SW UP TO FCO LPC = 5'-0" RL 4"W UP TO FCO (3)1/2"TP UP 3"SV UP (2)2"V UP 3"V UP L R 3"W UP & T 1/2"TP UP N KEY PLAN 6"SW UP & T 12"RL (38,426 SF) A B 3"W UP & T B.1 B C D 5'-0" E F E F INV. EL. = = N N 134.5'+/- PC LA LA G L P P T T R R A A PLUMBING - FOUNDATION - PART PLAN E - OFFICE AREA P P 1 SCALE: 1/8" = 1'-0" DESIGNER/DRAFTER SIGNATURE/BLOCK: PROJECT TITLE TOWN PROJECT NO. RHL 118-0167 THE INFORMATION, INCLUDING ESTIMATED QUANTITIES OF WORK, SHOWN ON THESE ROCKY HILL CHECKED BY: SHEETS IS BASED ON LIMITED INVESTIGATIONS BY THE STATE AND IS RSL STATE OF CONNECTICUT REPAIR FACILITY DRAWING NO. IN NO WAY WARRANTED TO INDICATE PLM-105U THE CONDITIONS OF ACTUAL QUANTITIES SCALE DEPARTMENT OF TRANSPORTATION DRAWING TITLE PLUMBING UNDERGROUND - OF WORK WHICH WILL BE REQUIRED. SHEET NO. 1/8" = 1'-0" PART PLAN E 09.08 NO. Revision Description Date Plotted: 6/9/2014 5:16:51 PM File Name: MPFP_CTDOT_Rocky Hill Repair Facility_Central.rvt 141.54.6 15 15.4 16 17 18 18.8 19 19.1 19.5 20 20.2 21 6"SW UP & T PART PLAN B 3"SV UP PART PLAN F G.1 G F 1/2"TP UP 3"SV UP SW 6"SW UP TO FCO W S 6"SW UP & T E.4 4"RL (4,791SF) E INV. EL. = 135'+/- D.9 (3)1/2"TP UP 3"SV UP D.6 6"SW UP & T 3"SV UP D 3"W UP & T 2"W UP W S 6"SW UP & T 6"SW UP TO FCO 3"SV UP C SW SW PART PLAN F S=.01 PART PLAN G 6"SW UP TO FCO 2"SV UP 3"SV UP W S 1/2"TP UP W S 6"SW UP & T 4"SW UP & T N KEY PLAN B.1 B " 0 INV. EL. = =5'- PART PLAN F 02 2"SV UP A B 134.5'+/- PC PART PLAN G S=. L (3)1/2"TP UP C D E F F N N E A A L L P P G T T R R 4"SW UP & T A A P P 2"SV UP PLUMBING - FOUNDATION - PART PLAN F - MACHINE SHOP 1 2"SW UP & T SCALE: 1/8" = 1'-0" DESIGNER/DRAFTER SIGNATURE/BLOCK: PROJECT TITLE TOWN PROJECT NO. RHL 118-0167 THE INFORMATION, INCLUDING ESTIMATED QUANTITIES OF WORK, SHOWN ON THESE ROCKY HILL CHECKED BY: SHEETS IS BASED ON LIMITED INVESTIGATIONS BY THE STATE AND IS RSL STATE OF CONNECTICUT REPAIR FACILITY DRAWING NO. IN NO WAY WARRANTED TO INDICATE PLM-106U THE CONDITIONS OF ACTUAL QUANTITIES SCALE DEPARTMENT OF TRANSPORTATION DRAWING TITLE PLUMBING UNDERGROUND - OF WORK WHICH WILL BE REQUIRED. SHEET NO. 1/8" = 1'-0" PART PLAN F 09.09 NO. Revision Description Date Plotted: 6/9/2014 5:16:59 PM File Name: MPFP_CTDOT_Rocky Hill Repair Facility_Central.rvt 17 18 18.8 19 19.1 19.5 20 20.2 21 6"SW UP TO FCO 3"SV UP PART PLAN F PART PLAN G C SW 6"SW UP TO FCO 2"SV UP W S W S 4"SW UP & T B.1 B PART PLAN F 2 2"SV UP 0 =. PART PLAN G S (3)1/2"TP UP 4"SW UP & T 2"SV UP 2"SW UP & T 44""RRLL ((11,,229911SSFF)) IINNVV.. EELL.. == 113355''++//-- IINNVV.. EELL.. == 113355''++//-- A LPC = 5'-0" LPC = 5'-0" 44""RRLL ((44,,552277SSFF)) PLUMBING - FOUNDATION - PART PLAN G - PAINT AREA 1 SCALE: 1/8" = 1'-0" N KEY PLAN A B C D F E G DESIGNER/DRAFTER SIGNATURE/BLOCK: PROJECT TITLE TOWN PROJECT NO. RHL 118-0167 THE INFORMATION, INCLUDING ESTIMATED QUANTITIES OF WORK, SHOWN ON THESE ROCKY HILL CHECKED BY: SHEETS IS BASED ON LIMITED INVESTIGATIONS BY THE STATE AND IS RSL STATE OF CONNECTICUT REPAIR FACILITY DRAWING NO. IN NO WAY WARRANTED TO INDICATE PLM-107U THE CONDITIONS OF ACTUAL QUANTITIES SCALE DEPARTMENT OF TRANSPORTATION DRAWING TITLE PLUMBING UNDERGROUND - OF WORK WHICH WILL BE REQUIRED. SHEET NO. 1/8" = 1'-0" PART PLAN G 09.10 NO. Revision Description Date Plotted: 6/9/2014 5:17:04 PM File Name: MPFP_CTDOT_Rocky Hill Repair Facility_Central.rvt 1 3 4 5 66.2 77.2 8 9 10 10.711 11.1711.92 13 14 1144.5.6 15 15.4 16 17 18 18.81199.1 19.5 2020.2 21 JK.9 J I.5 I GH.9 G.1 G F E.4 E D.9 D.6 D C B.1 B A PLUMBING - 01 DRAINAGE GROUND LEVEL OVERALL 1 SCALE: 3/64" = 1'-0" DESIGNER/DRAFTER SIGNATURE/BLOCK: PROJECT TITLE TOWN PROJECT NO. RHL 118-0167 THE INFORMATION, INCLUDING ESTIMATED QUANTITIES OF WORK, SHOWN ON THESE ROCKY HILL CHECKED BY: SHEETS IS BASED ON LIMITED INVESTIGATIONS BY THE STATE AND IS RSL STATE OF CONNECTICUT REPAIR FACILITY DRAWING NO. IN NO WAY WARRANTED TO INDICATE PLM-100 THE CONDITIONS OF ACTUAL QUANTITIES SCALE DEPARTMENT OF TRANSPORTATION DRAWING TITLE PLUMBING DRAINAGE - OF WORK WHICH WILL BE REQUIRED. SHEET NO. 3/64" = 1'-0" OVERALL 09.11 NO. Revision Description Date Plotted: 6/9/2014 5:16:00 PM File Name: MPFP_CTDOT_Rocky Hill Repair Facility_Central.rvt

Description:
VACUUM RELIEF VALVE RISER DESIGNATION DRAWING FURNISH AND INSTALL ALL NECESSARY PIPING, EQUIPMENT SUPPORTS AND
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.