Agenda Item 5: PBN en-route AIP publication issues First Combined ICAO EUR PBN TF & EUROCONTROL RAiSG Meeting 11th - 13th September 2013 ICAO EUR/NAT Office - Paris Mr. Tihomir Todorov Head of Section Airspace Design Operations Planning Network Operations Management Division Network Manager Directorate EUROCONTROL Presentation Objectives To present an operational and airspace design view on consistency and quality of RNAV routes definition and aeronautical data published in ECAC States AIPs. To further facilitate proper decisions to be taken in view of harmonization of PBN AIP publications. 12/09/2013 ECAC States AIP en-route publication issues 12/09/2013 Presentation Source Document produced by EUROCONTROL based on ECAC States AIPs and identifying important en-route publication issues. Document released and sent to all ECAC States on 30th August 2013. 12/09/2013 ICAO Requirements Covered Annex 15 INTRODUCTION The object of the aeronautical information service is to ensure the flow of information/data necessary for the safety, regularity and efficiency of international air navigation. The role and importance of aeronautical information/data changed significantly with the implementation of area navigation (RNAV), performance-based navigation (PBN), airborne computer-based navigation systems and data link systems. Corrupt or erroneous aeronautical information/data can potentially affect the safety of air navigation. To satisfy the uniformity and consistency in the provision of aeronautical information/data that is required for the operational use by computer- based navigation systems, States shall, as far as practicable, avoid standards and procedures other than those established for international use. 12/09/2013 EC Requirements Covered COMMISSION REGULATION (EU) No 677/2011 of 7 July 2011 laying down detailed rules for the implementation of air traffic management (ATM) network functions and amending Regulation (EU) No 691/2010, Annex I - The European Route Network Design (ERND) Function, Part B - Planning principle 9(k) stated that “The data regarding the changes to projects that require checking for compatibility and that need to be made available to the Network Manager include, but are not limited to changes affecting data published in aeronautical information publications.”. 12/09/2013 Reason, Aim and Scope Reason The Operational Stakeholders express regularly concerns regarding various issues linked to the different publication of airspace data in the State AIPs. The Network Manager operational systems also experience daily problems with non-harmonized airspace data publication. Aim The aim of this document and activity performed is to achieve: • harmonisation of ECAC States AIP en-route publication allowing the Operational Stakeholders to correctly interpret it and properly use available airspace entities; • full compliance with ICAO requirements - relevant Annexes and Documents; • full compliance with European requirements - relevant Commission Regulations. Scope The presented observations are based on actual State AIPs as published in pdf format (ref. AIRAC 22 AUG 2013) by using EAD PAMS sub-system and cover the ECAC area of the ICAO EUR/NAT Region. 12/09/2013 Way forward The following are the steps agreed by NETOPS/6 on the reported airspace AIP publication issues : Step 1 - Inventory of all inconsistencies identified in routes definition and aeronautical data publication per State. Step 2 - Consolidation of inconsistencies per subject / issue to detect, if there are any trends. Step 3 - Prioritisation of all subjects / issues on the basis of their operational efficiency impact. Step 4 - Finalization of required information by the end of August 2013. Step 5 - Sending via e-mail beginning of September to each individual State/ANSP NETOPS representative the inconsistencies identified in their AIP with an indication of the priority required in addressing each of the subjects / issues. The AIM SWIM Team / representatives to be also copied. Step 6 - A briefing to be provided to the AIM SWIM - 5 meeting in September 2013. / Step 7 - Feedback/comments required and expected by the NETOPS/7 meeting on 23rd th October 2013. - 24 Following further discussions, comments, suggestions and directives periodical review and monitoring of the improvements via the NETOPS will be performed. Additional arrangements to tackle the AIP issues presented and support to States by EUROCONTROL might be expected. 12/09/2013 Area Navigation (RNAV) routes 12/09/2013 a. Proper publication 12/09/2013
Description: