ebook img

Nuts and Bolts Series 1: How to Build a Work Breakdown Structure (Beginnings) 1st edition PDF

68 Pages·1999·1.175 MB·English
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Nuts and Bolts Series 1: How to Build a Work Breakdown Structure (Beginnings) 1st edition

Description:
While project managers are consistently expected to create the WBS as the cornerstone of their project plans, there are limited references on how to actually go about crafting one that works. The book provides readers with the different approaches to WBS construction, highlights the advantages and disadvantages of each of these approaches, examines the implications of the different styles of WBS and the level of depth that a project requires.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.