ebook img

National Fire Protection Association Report PDF

63 Pages·2014·0.27 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview National Fire Protection Association Report

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara... Committee Input No. 12-NFPA 2-2013 [ Global Input ] Type your content here ... Submitter Information Verification Submitter Full Name:[ Not Specified ] Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Tue Jun 04 13:38:03 EDT 2013 Committee Statement Committee To conform to the NFPA Regulations Governing Committee Projects. A task group was formed to Statement: update extract text and separate public input has been submitted on a Chapter by Chapter basis. The focus of the submittals by the task group has been limited to extracts from NFPA 1, 55 and 400. Extract text for other source documents will be addressed by the Staff Liaison along with public input from the technical committee for discussion during the public input meeting. This public input comment has been provided to document the need for additional updates to extract text where necessary. Response Message: Public Input No. 62-NFPA 2-2012 [Global Input] 1 of 11 1/27/2014 11:20 AM National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara... Committee Input No. 13-NFPA 2-2013 [ Global Input ] Submitter Information Verification Submitter Full Name:[ Not Specified ] Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Tue Jun 04 13:54:26 EDT 2013 Committee Statement Committee Review all extracted text to determine the appropriate source document for the extracted text. Statement: Text should be extracted from the fundamental source document. Staff will review all extracts and update appropriately for committee review. Response Message: 2 of 11 1/27/2014 11:20 AM National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara... Committee Input No. 150-NFPA 2-2013 [ Global Input ] Type your content here ... Submitter Information Verification Submitter Full Name:[ Not Specified ] Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Tue Jun 18 13:01:03 EDT 2013 Committee Statement Committee The Technical Committee is getting up a task group to work with the NFPA 86 Technical Statement: Committee to review Chapter 14 and the material that is extracted from NFPA 86 Response Message: 3 of 11 1/27/2014 11:20 AM National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara... Committee Input No. 27-NFPA 2-2013 [ Global Input ] Type your content here ... Submitter Information Verification Submitter Full Name:[ Not Specified ] Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed Jun 05 10:44:59 EDT 2013 Committee Statement Committee The technical committee is creating a task group to review Chapter 7 to address changes Statement: resulting from the revised definition of bulk GH2 system in the most recent edition of NFPA 55. This will result in changes to Chapter 7 and may result in changes to the next edition of NFPA 55. Response Message: 4 of 11 1/27/2014 11:20 AM National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara... Committee Input No. 5-NFPA 2-2013 [ Global Input ] Replace, where appropriate, the use of the references to NFPA 101, with the "adopted building code." Submitter Information Verification Submitter Full Name:[ Not Specified ] Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Tue Jun 04 08:36:53 EDT 2013 Committee Statement Committee Note: This public input appeared as Comment 2-2 (Log #CC17) which was held from the F10 Statement: ROC on Proposal 2-1. This would create consistency with the remainder of the document. Response Message: Public Input No. 28-NFPA 2-2012 [Global Input] 5 of 11 1/27/2014 11:20 AM National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara... Committee Input No. 517-NFPA 2-2013 [ Global Input ] The TC is planning a reorganization of Chapter 10 once the first revisions are balloted. See the attached files for the proposed reorganization. Supplemental Information File Name Description 2_Harris_Submission_FWG_NFPA_2_Ch_10_reorgnized_table_rev1.G1357571926152.xls 2_Harris_Submission_FWG_NFPA_2_Ch_10_reorganized_rev2.G1357571902938.docx Submitter Information Verification Submitter Full Name:Susan Bershad Organization: National Fire Protection Assoc Street Address: City: State: Zip: Submittal Date: Mon Sep 09 10:53:19 EDT 2013 Committee Statement Committee The TC is planning a reorganization of Chapter 10 once the first revisions are balloted. See Statement: the attached files for the proposed reorganization. Response Message: 6 of 11 1/27/2014 11:20 AM Old Section New Section Proposal Comment 10.3.1.3 10.2.2 Design and Construction of Containers, Cylinders, and Tanks. 10.3.1.3.1 10.2.2.1 10.3.1.3.2 10.2.2.2 10.3.1.3.3 10.2.2.3 10.3.1.3.4 10.2.2.4 Composite Container Cylinders and Tanks. (Reserved) 10.3.1.3.5 10.2.2.5 ASME Containers, Cylinders and Tanks 10.3.1.3.5.1 10.2.2.6 10.3.1.3.5.1 (A) 10.2.2.6.1 10.3.1.3.5.1 (B) 10.2.2.6.2 N/A 10.2.3 Hazard Analaysis New section heading 10.2.1.2 10.2.3.1 10.2.1.3 10.2.3.2 10.2.1.4 10.2.3.3 N/A 10.2.4 Leak and Fire Detection New section heading 10.3.1.19.1 10.2.4.1 10.3.1.19.1.1 10.2.4.1.1 10.3.1.19.1.2 10.2.4.1.2 10.3.1.19.1.3 10.2.3.1.3 10.3.1.19 10.2.4.2 Fire Protection New section heading A portable fire extinguisher having a rating of not less than 20‐B:C shall  be provided at the dispensing area in approved locations not more  than 50 ft (15.2 m) away from the dispensing area. [52:9.15] Fire  extinguishers shall be inspected and maintained according to NFPA 10,  10.3.1.19 10.2.4.2.1 Standard for Portable Fire Extinguishers [52:9.15.1] Move text to suplementary paragraph Moved to reflect the order of  components as they appear in the list  10.3.1.4 10.3.1.3 Pressure Relief Devices in section 10.3.1.1 10.3.1.4.1 10.3.1.3.1 10.3.1.4.1.5 10.3.1.3.2 10.3.1.4.1.3 10.3.1.3.3 10.3.1.4.1.4 10.3.1.3.4 10.3.1.4.1.1 10.3.1.3.5 10.3.1.4.1.2 10.3.1.3.6 Moved to reflect the order of  components as they appear in the list  10.3.1.5 10.3.1.4 Pressure Gauges in section 10.3.1.1 10.3.1.5.1 thru 10.3.1.5.2 Renumber accordingly Moved to reflect the order of  components as they appear in the list  10.3.1.6 10.3.1.5 Pressure Regulators in section 10.3.1.1 10.3.1.6.1 and 10.3.1.6.2 Renumber accordingly Moved to reflect the order of  components as they appear in the list  10.3.1.9 10.3.1.6 Valves in section 10.3.1.1 10.3.1.9.1 10.3.1.6.1 10.3.1.9.1.1 10.3.1.6.2 10.3.1.9.3 10.3.1.6.3 10.3.1.9.3.1 10.3.1.6.4 10.3.1.9.2 10.3.1.6.5 Moved to reflect the order of  components as they appear in the list  10.3.1.8 10.3.1.7 Hose and Hose Connections in section 10.3.1.1 Moved and renumbered to improve  10.3.1.8.5.3 10.3.1.7.1 The hose shall be approved or listed for hydrogen service. [52:9.9.4] readibility of section Hose and metallic hose shall be distinctly marked by the manufacturer,  either by the manufacturer’s permanently attached tag or by distinct  markings indicating the manufacturer’s name or trademark, applicable  service identifier, design pressure, and flow direction. [52:5.10.4] Moved and renumbered to improve  10.3.1.8.4 10.3.1.7.2 readibility of section 10.3.1.8.5.2 10.3.1.7.2.1 10.3.1.8.5 10.3.1.7.3 10.3.1.8.5 (1) 10.3.1.7.3 (1) 10.3.1.8.5 (2) 10.3.1.7.3 (2) 10.3.1.8.5 (3) 10.3.1.7.3 (3) 10.3.1.8.1 10.3.1.7.4 10.3.1.8.2 10.3.1.7.5 Moved to reflect the order of  components as they appear in the list  10.3.1.7 10.3.1.8 Fuel Lines and Piping Systems in section 10.3.1.1 10.3.1.7.3 10.3.1.8.1 10.3.1.7.1.1 10.3.1.8.2 10.3.1.7.1.2 10.3.1.8.3 10.3.1.7.2 10.3.1.8.4 10.3.1.7.1 10.3.1.8.5 10.3.1.7.5 10.3.1.8.6 10.3.1.7.4 10.3.1.8.7 10.3.1.7.4.1 10.3.1.8.8 10.3.1.7.4.1 (1) 10.3.1.8.8.1 10.3.1.7.4.1 (2) 10.3.1.8.8.2 Moved to reflect the order of  components as they appear in the list  10.3.1.15 10.3.1.9 Vehicle Fueling Connection in section 10.3.1.1 10.3.1.15.1 10.3.1.9.1 N/A 10.3.1.10 Compression and Gas Processing Systems 10.3.1.13 10.3.1.10.1 10.3.1.13.1 10.3.1.10.1.1 10.3.1.13.2 10.3.1.10.1.2 N/A 10.3.2 Installation and Testing New section heading N/A 10.3.2.1 Venting New section heading 10.3.1.7.7 10.3.2.1.1 10.3.1.4.2 10.3.2.1.2 Installation of Pressure Relief Devices on Dispensing Systems 10.3.1.4.2.1 10.3.2.1.2.1 10.3.1.4.2.2 10.3.2.1.2.2 10.3.1.4.2.3 10.3.2.1.2.3 10.3.1.4.2.4 10.3.2.1.2.4 10.3.1.5.3 10.3.2.2 Installation of Pressure Gauges on Dispensing Systems 10.3.1.6.3 10.3.2.3 Installation of Pressure Regulators on Dispesning Systems 10.3.1.6.3.1 10.3.2.3.1 10.3.1.6.4   The regulator protection in 10.3.1.6.3.1  10.3.2.3.1shall be  change reference in addtion to  10.3.1.6.4 10.3.2.3.2 permitted to be integral with the regulator. [52:9.7.2] chaning section New section heading ‐ Note ‐  recommend the use of "Installation of  N/A 10.3.2.4 Valves Valves" 10.3.1.9.1.2 10.3.2.4.1 New section heading  Note ‐  recommend the use of "Installation of  N/A 10.3.2.5 Hoses and Hose Assemblies Hoses and Hose Assemblies" 10.3.1.8.3 10.3.2.5.1 10.3.18.5.1 10.3.2.5.2 10.3.1.11.2.2 10.3.2.5.3 10.3.1.11.2.3 10.3.2.5.4 10.3.1.11.2.3 (A) 10.3.2.5.4.1 10.3.1.11.2.3 (B) 10.3.2.5.4.2 10.3.1.7.6 10.3.2.6 Installation of Piping and Hoses on Dispensing Systems 10.3.1.7.6.1 10.3.2.6.1 10.3.1.7.6.9 10.3.2.6.2 10.3.1.7.6.8 10.3.2.6.3 10.3.1.7.6.7 10.3.2.6.4 10.3.1.7.6.2 10.3.2.6.5 10.3.1.7.6.3 10.3.2.6.6 10.3.1.7.6.4 10.3.2.6.7 10.3.1.7.6.5 10.3.2.6.8 10.3.1.7.6.6 10.3.2.6.9 10.3.1.16 10.3.2.7 Installation of Electrical Equipment 10.3.1.16.1 10.3.2.7.1 Table 10.3.1.16.1 Table 10.3.2.7.1 10.3.1.16.4 10.3.2.7.2 10.3.1.16.3 10.3.2.7.3 10.3.1.16.2 10.3.2.7.4 10.3.1.16.2.1 10.3.2.7.5 10.3.1.16.1.1 10.3.2.7.5.1 10.3.1.17.3 10.3.2.7.6 10.3.1.17.3.1 10.3.2.7.6.1 10.3.1.17.4 10.3.2.7.7 10.3.1.16.4.1 10.3.2.7.8 10.3.1.17 10.3.2.8 Stray or Impressed Currents and Bonding 10.3.1.17.1 10.3.2.8.1 10.3.1.17.2 10.3.2.8.2 10.3.1.12 10.3.2.9 Equipment Security and Vehicle Protection 10.3.1.10 10.3.2.10 System Testing 10.3.1.10.1 10.3.2.10.1 10.3.1.10.2 10.3.2.10.2 10.3.1.10.3 10.3.2.10.3 10.3.1.10.4 10.3.2.10.4 10.3.1.10.5 10.3.2.10.5 10.3.1.10.5.1 10.3.2.10.5.1 10.3.1.10.5.1 (A) 10.3.2.10.5.1 (A) 10.3.1.10.5.1 (B) 10.3.2.10.5.1 (B)

Description:
Message: Public Input No. 62-NFPA 2-2012 [Global Input]. National Fire . extinguishers shall be inspected and maintained according to NFPA 10, .. (B) 10.2.2.6.2 The exchange or interchange of pressure vessel appurtenances.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.