ebook img

modular +24 vdc, 800 amp -48vdc, 80 amp PDF

76 Pages·2010·2.19 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview modular +24 vdc, 800 amp -48vdc, 80 amp

Critical Power Product Manual 128F MODULAR +24 VDC, 800 AMP -48VDC, 80 AMP Front Access Switchmode Rectifier System Service and Assistance - +1 877 546 3243 [email protected] © 2015 General Electric Company. All rights reserved. www.gecriticalpower.com 4380428PD Issue 09 May 2015 Page 1 GE Critical Power 128F Product Manual -This page intentionally left blank- Page 2 Issue 9, May 2015 GE Critical Power 128F Product Manual TTAABBLLEE OOFF CCOONNTTEENNTTSS 128F...............................................................................................................................................................................1 TABLE OF CONTENTS............................................................................................................................................3 CONTACT INFORMATION .....................................................................................................................................7 PRODUCT INFORMATION.....................................................................................................................................7 WARNINGS.................................................................................................................................................................8 CAUTIONS..................................................................................................................................................................8 SECTION 1: GENERAL.........................................................................................................................................11 1.1 GENERAL.......................................................................................................................................................11 1.2 RECTIFIER.....................................................................................................................................................11 1.3 RECTIFIER SHELF.........................................................................................................................................12 1.4 CONVERTER..................................................................................................................................................12 1.5 CONVERTER SHELF.......................................................................................................................................13 1.6 DISTRIBUTION...............................................................................................................................................13 1.7 METER, MONITOR, AND CONTROL (MMC) PANEL........................................................................................13 1.8 OPTIONAL LVD (LOW VOLTAGE DISCONNECT)............................................................................................17 1.9 ACRONYMS....................................................................................................................................................18 SECTION 2: INSTALLATION..............................................................................................................................19 2.1 BAY PRE-INSTALLATION CHECKS.................................................................................................................19 2.2 INSTALLER MECHANICAL AND POWER ELECTRICAL CONNECTIONS..........................................................19 SECTION 3: NAVIGATING THE USER INTERFACE FOR THE DIGITAL CONTROLLER...................37 3.1 GENERAL.......................................................................................................................................................37 3.2 MAIN SCREEN................................................................................................................................................38 3.3 SUBMENU......................................................................................................................................................38 3.4 PLANT............................................................................................................................................................40 3.5 ALRM.............................................................................................................................................................45 3.6 BAY................................................................................................................................................................46 3.7 TEST...............................................................................................................................................................51 3.8 RECT..............................................................................................................................................................54 3.9 CONV.............................................................................................................................................................58 SECTION 4: TROUBLESHOOTING....................................................................................................................61 4.1 GENERAL.......................................................................................................................................................61 SECTION 5: THEORY OF OPERATION.............................................................................................................63 5.1 GENERAL.......................................................................................................................................................63 SECTION 6: SPECIFICATIONS............................................................................................................................65 6.1 SYSTEM INPUT RATINGS................................................................................................................................65 6.2 SYSTEM OUTPUT RATINGS............................................................................................................................65 6.2 FACTORY SETTINGS......................................................................................................................................66 SECTION 7: MODULAR SYSTEM INSTALLATION........................................................................................67 7.1 GENERAL.......................................................................................................................................................67 7.2 DISTRIBUTION INSTALLATION......................................................................................................................67 7.3 RECTIFIER SHELF INSTALLATION.................................................................................................................68 7.4 BASIC SYSTEM LAYOUT.................................................................................................................................69 7.5 RECTIFIER OUTPUT CONNECTIONS TO THE DISTRIBUTION HEAD.............................................................70 7.6 AC CONNECTION TO CUSTOMER..................................................................................................................72 Issue 9, May 2015 Page 3 GE Critical Power 128F Product Manual SECTION 8: J-DRAWING.............................................................................................................................................438128FP SECTION 9: SCHEMATIC DIAGRAM.....................................................................................................................439128FSD SECTION 10: T-DRAWING..........................................................................................................................................439128FT SECTION 11: RECTIFIER SHELF MANUAL.........................................................................................................4380426PD SECTION 12: SM100H24D MANUAL.......................................................................................................................4380425PD Page 4 Issue 9, May 2015 GE Critical Power 128F Product Manual List of Tables TABLE 2-1: FRAME GROUND.............................................................................................................................20 TABLE 2-2: CENTRAL OFFICE GROUND........................................................................................................20 TABLE 2-3: AC INPUT...........................................................................................................................................21 TABLE 2-4: +24 VDC LOADS (23 POSITIONS).................................................................................................22 TABLE 2-5: +24 VDC LOADS (32 POSITIONS).................................................................................................23 TABLE 2-6: +24 VDC LOAD RETURNS..............................................................................................................24 TABLE 2-7: -48VDC LOADS.................................................................................................................................25 TABLE 2-8: -48 VDC LOAD RETURNS...............................................................................................................26 TABLE 2-9: EIGHT (8) INTERNAL BATTERY CONNECTIONS...................................................................27 TABLE 2-10: SIX (6) EXTERNAL BATTERY CONNECTIONS (IF REQUIRED).........................................28 TABLE 2-11: SIX (6) EXTERNAL BATTERY RETURN CONNECTIONS (IF REQUIRED)......................28 TABLE 2-12A: AMP CHAMP ALARM CONNECTIONS FOR THE 6200526P ALARM CARD.................30 TABLE 2-12B: AMP CHAMP ALARM CONNECTIONS FOR THE 6200526P-1 ALARM CARD..............31 TABLE 2-12C: AMP CHAMP ALARM CONNECTIONS FOR THE 6200526P-2 ALARM CARD..............32 TABLE 2-12D: AMP CHAMP ALARM CONNECTIONS FOR THE 6200526P-3 ALARM CARD..............33 TABLE 2-13: RFA OUTPUTS..............................................................................................................................324 List of Figures FIGURE 1-1: SM100H24D RECTIFIER MODULE............................................................................................11 FIGURE 1-2: DIGITAL RECTIFIER SHELF......................................................................................................12 FIGURE 1-3: SM48P10A-D CONVERTER MODULE.......................................................................................12 FIGURE 1-4: MMC FRONT PANEL....................................................................................................................16 FIGURE 1-5: LOCATION OF LVD CONTACTOR (IF EQUIPPED)...............................................................17 FIGURE 2-1: TYPICAL MOUNTING FOR 128F BAY......................................................................................20 FIGURE 2-2: AC INPUTS (TOP OF BAY, IF EQUIPPED).................................................................................21 FIGURE 2-3: LOCATION OF +24VDC LOAD CONNECTIONS (23 POSITIONS).......................................22 FIGURE 2-4: LOCATION OF +24VDC LOAD CONNECTIONS (32 POSITIONS).......................................23 FIGURE 2-5: LOCATION OF LOAD RETURNS...............................................................................................24 FIGURE 2-6: LOCATION OF -48VDC LOAD CONNECTIONS......................................................................25 FIGURE 2-7: LOCATION OF –48VDC LOAD RETURN CONNECTIONS....................................................26 FIGURE 2-8A: LOCATION OF BATTERY CONNECTIONS (WITH OPTIONAL BATTERY TRAYS)...26 FIGURE 2-8B: LOCATION OF BATTERY CONNECTIONS (ON DISTRIBUTION HEAD)......................27 FIGURE 2-9: INSTALLER BATTERY CONNECTIONS (FRONT LOOKING BACK)................................28 FIGURE 2-10: ALARM INTERFACE...................................................................................................................29 FIGURE 2-11: RETAINING SCREW LOCATIONS ON THE RECTIFIER MODULE................................35 FIGURE 7-1. DISTRIBUTION HEAD MOUNTING BRACKETS....................................................................67 FIGURE 7-2. MOUNTING LOCATION ON EACH CONVERTER SHELF (23" SHELF SHOWN)...........68 Issue 9, May 2015 Page 5 GE Critical Power 128F Product Manual FIGURE 7-3. 128F PLANT FULLY ASSEMBLED.............................................................................................69 FIGURE 7-4. DC GROUND OUTPUT CONNECTIONS....................................................................................70 FIGURE 7-5. DC GROUND CONNECTIONS ON DISTRIBUTION HEAD....................................................70 FIGURE 7-6. DC POWER OUTPUT CONNECTIONS......................................................................................71 FIGURE 7-7. +24VDC CONNECTIONS ON DISTRIBUTION HEAD.............................................................71 FIGURE 7-8. 128F PLANT FULLY CABLED (REAR VIEW)..........................................................................72 FIGURE 7-9. FACTORY AC WIRE......................................................................................................................72 Page 6 Issue 9, May 2015 GE Critical Power 128F Product Manual CONTACT INFROMATION Phone: +1 877 546-3243 Email: [email protected] Web site: www.gecriticalpower.com PPRROODDUUCCTT IINNFFOORRMMAATTIIOONN Please take a moment when the product is new to fill in this information. First, locate the product information label. This is typically located on the upper front of the equipment frame, or on the rear of the frame. Fill in the part number, as it appears on the label, in the space below. PART NUMBER DATE CODE: SERIAL NUMBER ECN LEVEL: 860 _ _ _ _ P Issue 9, May 2015 Page 7 GE Critical Power 128F Product Manual WWAARRNNIINNGGSS CCAAUUTTIIOONNSS 1. Electrical shock hazard. Do not attempt to remove, 1. Follow proper grounding instructions. maintain, or install this equipment with power applied. Personnel that attempt to work on this equipment with Suivre fonder correctes les instructions. the power applied may subject themselves or others to electrical shock that may cause serious injury or death. 2. If connecting batteries, remove the battery-box-fuse or trip the circuit breaker. Check batteries and Le danger électrique de choc. Pas la tentative pour connections for proper polarity and power before enlever, maintenir, ou installer cet équipement avec le connecting the batteries to the system. pouvoir appliqué. Le personnel qui tente traiter cet équipement avec le pouvoir appliqué peut s'exposer ou Si connectant des piles, enlever la pile-boîte-le les autres au choc électrique qui peut causer la fusible ou trébuche le disjoncteur. Vérifier des piles blessure ou la mort sérieuse et des connexions pour la polarité et le pouvoir correcte avant de connecter les piles au système. 2. The use of this equipment by unauthorized or 3. To remove the circuit breakers or fuses, the DC untrained personnel should not be attempted. and/or AC input to the system will need to be Personnel that work on this equipment without the disconnected, thereby disabling the system output to proper training may subject themselves or others to the load(s). Take the necessary precautions and electrical shock that may cause serious injury or death. inform the plant engineer that the system output power to the loads will be disabled. L'usage de cet équipement par le personnel inautorisé ou sans formation ne devrait pas être tenté. Le Pour enlever les disjoncteurs ou les fusibles, les personnel qui traite cet équipement sans l'entraînement données de courant alternatif de et/ou de DC au correct peut s'exposer ou les autres au choc électrique système auront besoin d'être débranché, de cette qui peut causer la blessure ou la mort sérieuse façon rendant infirme la production de système au chargement (les chargements). Prendre les précautions nécessaires et informer l'ingénieur de plante que le pouvoir de production de système aux chargements seront rendus infirme. . 3. Do not attempt to work on this equipment if it is, or 4. Before performing any maintenance, ensure AC or has been, exposed to a high moisture condition. It is DC power is not applied to the system. recommended the equipment be returned to GE II to be properly tested. Working on this equipment Avant d'exécuter n'importe quel entretien, assurer during a high moisture condition subjects the user to que le pouvoir de courant alternatif ou DC n'est pas electrical shock that may cause serious injury or death. appliqué au système. Pas la tentative pour traiter cet équipement si c'est, ou a été, exposé à une haute condition d'humidité. Il est 5. Fuse holders, fuses, and circuit breakers are not to be recommandé l'équipement s'est retourné à GE deux loaded to more than 80 percent of their ampere être convenablement essayé. Traiter cet équipement rating. pendant une haute condition d'humidité expose l'utilisateur au choc électrique qui peut causer la Fondez les supports, fusibles, et des disjoncteurs blessure ou la mort sérieuse. ne doivent pas être chargés à plus de 80 pour cent de leur estimation d'ampère. Page 8 Issue 9, May 2015 GE Critical Power 128F Product Manual 4. Use of an attachment other than one approved by GE will void any and all warranties, implied or other, and will increase risk of fire, or may possibly cause electrical shock, injury, or death to personnel. L'usage d'un attachement autrement qu'un approuvé par GE annulera n'importe quel et toutes garanties, implicites ou autres, et augmentera le risque de feu, ou probablement peut causer le choc électrique, la blessure, ou la mort au personnel. 5. Do not operate this equipment if it has been dropped or otherwise damaged. Trying to operate this equipment if it has been damaged subjects yourself or others to electrical shock that may cause serious injury or death. L'usage d'un attachement autrement qu'un approuvé par GE annulera n'importe quel et toutes garanties, implicites ou autres, et augmentera le risque de feu, ou probablement peut causer le choc électrique, la blessure, ou la mort au personnel. 6. Before you proceed, ensure the input source is not live and the input circuit breaker(s)/fuse(s) has been tripped or removed. If these procedures have not been followed and the input/output power is live, serious personnel injury or death may occur. Avant que vous procédez, assurez que la source d'entrée n'est pas en vie et le circuit d'entrée breaker(s)/fuse(s) a été trébuché ou a été enlevé. Si ces procédures n'ont pas été suivies et le pouvoir input- output est la blessure de personnel ou la mort en vie et sérieux peut arriver 7. A rack/shelf may contain several operating systems. If there is another system in the general area you want to install this system, be cautious of any exposed connectors or wires and, with permission, remove power to the other systems. Failure to take the necessary safety precautions subjects the installer or maintenance personnel to severe electrical shock that may cause serious injury or death. Une étagère/étagère peut contenir plusieurs systèmes d'exploitation. S'il y a un autre système dans le secteur général que vous voulez installer ce système, êtes prudent de connecteurs ou de fils exposés et, avec la permission, enlevez le pouvoir aux autres systèmes. L'échec pour prendre les précautions de sûreté nécessaires exposent le personnel d'installateur ou entretien au choc électrique sévère qui peut causer la blessure ou la mort sérieuse Issue 9, May 2015 Page 9 GE Critical Power 128F Product Manual 8. This equipment may connect to lead-acid batteries. Battery posts, terminals, and related accessories contain lead and lead compounds, chemicals known to the state of California to cause cancer and birth defects or other reproductive harm. Wash hands after touching batteries. Cet équipement peut connecter des piles mener- acides. Les postes de pile, les terminaux, et les accessoires apparentés contient l'avance et les premiers composés, les produits chimiques connus à l'état de Californie pour causer les défauts de cancer et naissance ou l'autre mal reproducteur. Laver des mains après avoir touché des piles. Page 10 Issue 9, May 2015

Description:
GE Critical Power 128F Product Manual. Page 2. Issue 9 inform the plant engineer that the system output power to the .. Rectifier Minor (Amber).
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.