ebook img

MODIFICATION OF APPROVED MINING PLAN& PROGRESSIVE MINE CLOSURE PLAN FOR PDF

199 Pages·2017·15.24 MB·Italian
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview MODIFICATION OF APPROVED MINING PLAN& PROGRESSIVE MINE CLOSURE PLAN FOR

MMOODDIIFFIICCAATTIIOONN OOFF AAPPPPRROOVVEEDD MMIINNIINNGG PPLLAANN&& PPRROOGGRREESSSSIIVVEE MMIINNEE CCLLOOSSUURREE PPLLAANN FFOORR TTHHEENNMMAALLAAII LLIIMMEESSTTOONNEE MMIINNEE (PRIVATE /”A” CATEGORY OTHER THA N FU LLY MECHANISED /MP& PMCP /NON-FOREST/ PATTA LAND) Mining plan period – [2015-16 to 2019-20] MODIFIED MINING PLAN PERIOD – [(2017-18 to 2019-20)(upto 31.03.2020)] (Lease expiry 30.06.1997) (The Mine is being operated under Deemed Extension) Mine code: 38TMN15004 SUBMITTED UNDER RULE 17 (3) of MCR, 2016& RULE 23 of MCDR, 2017 Registration Number under Rule 45 – IBM /871/2011 dated 14.10.2011 L OCATION OF THE MINE EXTENT : 2.63.0HA S.F.NOs : 1100/9, 1101/8, 9, 10, 1102/5C, 1103/3A, & etc,. VILLAGE :THENMALAI TALUK : SIVAGIRI DISTRICT : TIRUNELVELI STATE : TAMILNADU MINE OWNER/LESSEE M/s. JanathaCem Industries Limited, (Formerly Tvl. Limenaph Chemicals) 799/2, SankaranKoil Road, Rajapalayam, Virudhunagar – 626 117. PREPARED BY Dr. P. Thangaraju, M.Sc., Ph.D., RQP/MAS/206/2007/A Old.No.260-B, New No: 17, Advaitha Ashram Road, Alagapuram, Salem – 636 004. Cell: 94422 78601, 94433 56539. E-mail: [email protected], [email protected] LIST OF CONTENTS S.NO DESCRIPTION PAGE.NO INTRODUCTORY NOTES 1 1.0 GENERAL 3 2.0 LOCATION AND ACCESSIBILITY 4 DETAILS OF APPROVED MINING 3.0 6 PLAN/SCHEME OF MINING (IF ANY) PART - A 1.0 GEOLOGY AND EXPLORATION 9 2.0 MINING 16 A. OPENCAST MINING 16 B. UNDERGROUND MINING 24 3.0 MINE DRAINAGE 25 STACKING OF MINERAL REJECT/SUB 4.0 GRADE MATERIAL AND DISPOSAL OF 25 WASTE 5.0 USE OF MINERAL AND MINERAL REJECT 26 PROCESSING OF ROM AND MINERAL 6.0 27 REJECT 7.0 OTHER 27 PROGRESSIVE MINE CLOSURE PLAN- 8.0 28 UNDER RULE 23 OF MCDR’1988 PART -B 9.0 Certificates /Undertakings/Consents A. Consent Letter/Undertaking/ 39-40 Certificate From The Lessee Certificate From RQP 41 LIST OF ANNEXURES Annexure SL.No. Description Page no. no. FEASIBILITY REPORT OF THENMALAI 1. I 42-53 LIMESTONE MINE RESOURCES AND RESERVES BY UNFC 2. IA 54-72 SYSTEM 3. PHOTOS WORK OF THE MINE IB 73-74 4. COPY OF G.O.MS. No.77 II 75-77 COPY OF FMB III COPY OF PATTA IIIA 5. 78-98 COPY OF ADANGAL IIIB COPY OF “A” REGISTER IIIC 6. COPY OF COMBINED SKETCH IV 99 V 7. COPY OF CHEMICAL ANALYSIS REPORT 100 8. COPY OF LEASE DEED VI 101-104 COPY OF MEMORANDUM OF ARTICLES 9. VII 105-146 AND BOARD OF DIRECTORS COPY OF BOARD OF RESOLUTION VII-A 147 COPY OF RENEWAL MINING LEASE 10. VIII 148-155 APPLICATION WITH ACKNOWLEDGEMENT COPY OF MP APPROVAL LETTER FROM 11. IX 156-157 IBM 12. COPY OF FORM-J & K X 158-161 COPY OF HEMM PERMISSION LETTER 13. XI 162-169 FROM DGMS 14. COPY OF NAME CHANGE LETTER XII 170-172 15. COPY OF ONLINE SUBMISSION OF EC XIII 173-174 16. COPY OF ID PROOF XIV 175 17. COPY OF RQP CERTIFICATE XV 176 18. COPY OF BANK GAURANTEE XVI 177-179 PART-B 10.0 LIST OF PLANS AND SECTIONS DESCRIPTION SCALE PLATE SL.NO. NO. 1. LOCATION PLAN Not to Scale I 2. ROUTE MAP Not to Scale IA 3. KEY PLAN 1:50,000 IB 4. MINE LEASE PLAN 1:1000 II 5. SURFACE PLAN 1:1000 III Plan: 1:1000 Section : 6. GEOLOGICAL PLAN AND SECTIONS IV HOR-1:1000 VER:1:500 Plan: 1:1000 YEARWISE DEVELOPMENT & Section : V,VA & 7. PRODUCTION PLAN & SECTIONS HOR-1:1000 VB VER:1:500 MINE LAYOUT, LAND USE & VI 8. 1:1000 AFFORESTATION PLAN 9. FINANCIAL AREA ASSURANCE PLAN 1:1000 VII 10. ENVIRONMENT PLAN 1:5000 VIII Plan: 1:1000 Section : 11. CONCEPTUAL PLAN AND SECTIONS IX HOR-1:1000 VER:1:500 Modification of Approved Mining Plan& PMCP Thenmalai Limestone Mine MODIFICATION OF APPROVEDMINING PLAN AND PROGRESSIVE MINE CLOSURE PLANFOR THENMALAI LIMESTONE MINE OVER AN EXTENT OF 2.63.0HA(6.50 Acres)IN S. F. NOs.1100/9, 1101/8, 9, 10, 1102/5C, 1103/3A, 3B (P) &1104 IN THENMALAI VILLAGE, SIVAGIRITALUK, TIRUNELVELIDISTRICT,TAMILNADU STATE Mining Planperiod –[2015-16 to 2019-20] Modified Mining Plan Period – [(2017-18 to 2019-20)(upto 31.03.2020)] (Lease Expiry on 30.06.1997) (PRIVATE /”A” CATEGORY OTHER THAN FULLY MECHANISED/ MP & PMCP/ NON-FOREST / PATTALANDS) SUBMITTED UNDER RULE 17(3) of MCR, 2016 &RULE 23 of MCDR, 2017 Registration Number under Rule 45: IBM/871/2011, dated 14.10.2011 Mine code: 38TMN15004 INTRODUCTION This Modification of ApprovedMining Planand Progressive Mine Closure Plan for Thenmalai Limestone Mine over an extent of 2.63.0Ha (6.50 Acres) in S.F. Nos. 1100/9, 1101/8, 9, 10, 1102/5C, 1103/3A, 3B (P) &1104 of Thenmalai Village, SivagiriTaluk, TirunelveliDistrict, Tamilnadu State has been prepared forM/s. JanathaCem Industries Limited (formerly Tvl. Limenaph Chemicals), residing at 799/2, SankaranKoil Road, Rajapalayam – 626117, Tamilnadu State. The mine lease was granted name of Tvl. Limenaph Chemicals. In 03.02.2000 the name was changed as M/s. JanathaCem Industries limitedis a limited company (Please refer Annexure No.XIII).Thiru.P.B.Chinnavenkatarajais the Managing Director of the Company. The lessee is having very good knowledge and experience in Limestone mining for more than a decade. The mining lease was granted first vide G.O.No-366 dated 16/03/1984 for a period of 3 years, lease was executed and expired on 1/7/1987. Then lessee applied for renewal and mining lease, and was renewed for 10 years with effect from 2/7/1987 and expired on 1/7/1997, vide G.O.Ms.No-77 dated 8/2/1989 over an extant of 6.50 acres(2.63 ha). The lease expired on 30.06.1997. The company has applied for Second renewal for a period of 20 years on 26.06.1996 Form J and the receipt of the application Form D is enclosed. The renewal orders are waiting from the government and the mining is continued under deemed extension.(Annexure –VIII) The previous scheme of mining and PMCP (2015-16 to 2019-2020) has been submitted and the same was approved by Indian Bureau of Mines vide letter No. TN/TNL/LST/MS-1282MDS, dated 21.12.2015 for the period of five years. Presently the 60% of proposed production mentioned in the approved scheme of Mining has been achieved due to sudden spurt in the market during the period of two years itself. Hence this modified mining plan (2017-18 to 2019-20) along with PMCP is being prepared for submission to get approval under Rules 17(3) of MCR 2016 and Rule 23 of MCDR 2017.After the approval of this modified mining plan only, the application for the Environmental Clearance will be submitted as per the EIA Notification, 2006. Further, along with Environmental Clearance application, approved modified Mining plan is also to be submitted to obtain ToR which is mandatory. Proposals were given to work under “B Category” in the present approved Scheme of Mining, but this present modified Mining plan is prepared under “A” category other than fully mechanized method by deploying machineries for development of benches to meet the demand in the market. The entire mined out mineral is used for its own captive plant and supplied for nearby lime based industries. -1- Modification of Approved Mining Plan& PMCP Thenmalai Limestone Mine Particulars of number of state wise leases already held by the lessee: The detail of other mining leases held by the lessee in Tamilnadu is given below. He does not hold any other mining leases outside Tamilnadu State. Table - 1 Date of Lease Working/ Status of S Area Type of execution reference no. Location Non- approval Remarks No in Ha mineral & Date of & date. Working of MP/MS expiry G.O.171 Ind The Date of Renewal (DII) dated Mining opening application 16.03.1989 plan and - 1.11.0Ha ThenmalaiVilla submitted for 10 years scheme continue (2.74.5 ge,sivagiriTalu on 1. Original limestone working are d acres) k, Tirunelveli 27.06.199 G.O.354 Ind submitte .present District 6 order are dated d and get status - pending 15.03.1984 approved Working (3 years) G.O. 554 Ind The Date of (MMDII) Renewal Mining opening dated application plan and - 25.05.1990 ThenmalaiVilla submitted 0.58.5 scheme continue for 10 years ge,sivagiriTalu on 2. ha(1.44.5a limestone working are d Original k, Tirunelveli 27.06.199 cres) submitte .present G.O.19 Ind District 8 order are d and get status - dated pending approved Working 09.01.1985 (4 yeras) The Date of Renewal Mining opening application G.O.78 Ind ThenmalaiVilla plan and - submittted 4.76acres (DII) dated ge,sivagiriTalu scheme continue on 3. 1.92.6 ha limestone working 09.02.1989 k, Tirunelveli are d 29.12.200 for 20 years District submitte .present 8 order are d and get status - pending approved Working The Date of Renewal Mining opening application G.O. 170 Ind ThenmalaiVilla plan and - 2.18.9 submitted (DII) dated ge,sivagiriTalu scheme continue 4. ha(5.41 limestone working on 16.03.1989 k, Tirunelveli are d acres) 27.06.199 for 10 years District submitte .present 6 order are d and get status - pending approved Working G.O. 459 Ind The Date of (MMDII) Mining opening Renewal dated plan and - application 09.05.1990 ThenmalaiVilla 2.52.04 scheme continue submitted for 10 years ge,sivagiriTalu 5. ha(6.243/ limestone working are d on Original k, Tirunelveli 4 acres) submitte .present 19.08.199 G.O.824 Ind District d and get status - 4 order are dated approved Working pending 24.05.1980 (5 years) -2- Modification of Approved Mining Plan& PMCP Thenmalai Limestone Mine 1.0 GENERAL a) Name of applicant /lessee/Rule 45 registration no. Name of the lessee : M/s. JanathaCemIndustries Ltd, (FormerlyTvl. Limenaph Chemicals) Registration No : IBM/871/2011 Mine Code : 38TMN15004 Address : 799/2, SankaranKoil Road, Rajapalayam, District : Virudhunagar State :Tamilnadu Pin code : 626 117 Mobile No. : 98421 21129 Email id. : [email protected] b) Status of applicant/lessee The lessee P.B.Chinnavenkata Raja, (Managing Director), T.VenkatarajaGopalan, (Whole-time director) and PerisolliKumarasamy raja Janaki, (Director), is a limited company. We have very good knowledge and experience in Limestone mining for more than a decade. The details of the Directors are given below: Table-2 S.No Name & Address Designation Cell. No E-mail address P.B.Chinnavenkata Raja, 90A3, New No.1, Managing [email protected] 1. 6thSt.P.S.K.Nagar, Director 98421 19171 Rajapalayam-626108, Tamil Nadu, India T.VenkatarajaGopalan, Old No.483D, New Whole-time [email protected] 2. No.37, JanathaCem director 98421 21129 Colony, Anna Nagar, Rajapalaym – 626117. PerisolliKumarasamy raja Janaki, [email protected] 3. Director 98421 19171 85, Big Bazar, Rajapalayam-626117 c) Mineral(s) which is / are included in the prospecting license (For Fresh grant) It is an existing mine and the mineral exploited is limestone. d) Mineral(s) which is / are included in the letter of Intent / lease deed The mining lease was granted first vide G.O.No-366 dated 16/03/1984 for a period of 3 years. Then lessee applied for renewal and mining lease, and was renewed for 10 years with effect from 2/7/1987 and expired on 1/7/1997, vide G.O.Ms.No-77 dated 8/2/1989 over an extant of 6.50 acres(2.63 ha). e) Mineral(s) which is the applicant /lessee intends to mine: The mining lease was granted for Limestone only and the lessee intends to mine only limestone. -3- Modification of Approved Mining Plan& PMCP Thenmalai Limestone Mine f) Name of Qualified Person under rule 22C of MCR,1960 or a Person employedunder clause (c) of Sub rule (1) of rule 42 of MCDR, 1988(Applicable for Scheme ofMining only)preparing Mining Plan Name : Dr. P. Thangaraju, M.Sc., Ph.D., Qualified Person Address : Old.No.260-B, New No: 17, Advaitha Ashram Road, Alagapuram, Salem – 636 004. Email Id : [email protected], [email protected] Tele Fax : 0427- 2431989 (Office) Cell Phone Nos. : 94422 78601 & 94433 56539 Registration No : RQP/MAS/206/2007/A 2.0 LOCATION AND ACCESSIBILITY a) Lease Details (Existing Mine) Name of the Mine :ThenmalaiLimestone Mine Lat/long of boundary point : 090 19’ 41.75’’N to 090 19’ 29.02’’N 770 32’ 34.68’’E to 770 32’ 22.48’’E Date of grant of lease : 16/03/1984 Period/Expiry Date : 3 years with effect from 01.07.1987 (i.e. from 30.06.1984 to 01.07.1987) Please refer annexure-II. Renewal date : First renewal 10years with effect from 02.07.1987. Second Renewal of mining lease is applied on 26.06.1996. b) Details of applied /lease area with location map (fresh area /mine) Forest Non-forest Area (ha) i). Waste land Nil Area (ha) ii).Grazing land Nil Forest (specify) Nil iii).Agriculture land Nil iv).Other (specify) patta lands 2.63.0Ha(6.50 acres) Table-3 District & Extent in Taluk Village S.F.Nos. State hectares 1100/9, 1101/8, 9, Tirunelveli&Ta 10, 1102/5C, Sivagiri Thenmalai 2.63.0Ha milnadu 1103/3A, 3B & 1104 Whether the area falls under Coastal Regulation Zone (CRZ)? Not applicable. -4- Modification of Approved Mining Plan& PMCP Thenmalai Limestone Mine Existence of public road/railway line, if any nearby and approximate distance This mining lease area is situated14km away from Rajapalayam. State Highway SH-41 (Rajapalayam – Tirunelveli) is passing through Sankarankoil. A metal road from Thenmalai to SH-41 of Rajapalayam road lies in distance of 7km. This metal road from Thenmalai is connecting to SH-41 road. Please refer Key Map-IB for the location of the lease area). Table-4 Approximate S.No Particulars Location Direction Distance in Km 1 Nearest Post office Thenmalai SW 5.0 2 Nearest Town(D.H) Rajapalayam N 14 3 Nearest Police Station Karivallamvanthanallur SE 4 4 Nearest Govt. Hospital Karivallamvanthanallur SE 4 5 Nearest School Thenmalai SW 3 6 Nearest DSP Office Sankarankoil S 12 7 Nearest Railway Station Rajapalayam N 14 8 Nearest Airport Thoothukudi SE 85 9 Nearest Seaport Thoothukudi SE 94 Please refer Location plan (Plate No.I), Route Map (Plate No.IA), Key plan (Plate No.IB) Drinking Water, rest shed, store room, public convenience and mines office are proposed to be constructed in temporary semi permanent structure within the lease area. Please refer Plate No. VI. Toposheet No. with latitude & longitude of all corner boundary point/pillar The Area falls in Toposheet No.58-G/11 of Geological Survey of India. Table-5 BOUNDARY CO-ORDINATES on WGS-84 from SW Corner Point Id. Latitude Longitude Point Id. Latitude Longitude 1. 09° 19' 36.79"N 77° 32' 22.98"E 18. 09° 19' 39.91"N 77° 32' 29.43"E 2. 09° 19' 38.02"N 77° 32' 23.24"E 19. 09° 19' 39.34"N 77° 32' 32.51"E 3. 09° 19' 38.19"N 77° 32' 22.48"E 20. 09° 19' 38.82"N 77° 32' 32.78"E 4. 09° 19' 39.81"N 77° 32' 23.00"E 21. 09° 19' 38.02"N 77° 32' 32.51"E 5. 09° 19' 41.75"N 77° 32' 23.51"E 22. 09° 19' 38.42"N 77° 32' 30.42"E 6. 09° 19' 41.52"N 77° 32' 24.31"E 23. 09° 19' 38.67"N 77° 32' 30.49"E 7. 09° 19' 39.28"N 77° 32' 23.70"E 24. 09° 19' 36.05"N 77° 32' 30.07"E 8. 09° 19' 38.87"N 77° 32' 25.16"E 25. 09° 19' 36.67"N 77° 32' 30.28"E 9. 09° 19' 39.21"N 77° 32' 25.13"E 26. 09° 19' 36.40"N 77° 32' 30.93"E 10. 09° 19' 39.23"N 77° 32' 25.46"E 27. 09° 19' 35.83"N 77° 32' 30.73"E 11. 09° 19' 38.75"N 77° 32' 25.59"E 28. 09° 19' 30.61"N 77° 32' 28.91"E 12. 09° 19' 36.08"N 77° 32' 24.68"E 29. 09° 19' 33.82"N 77° 32' 30.24"E 13. 09° 19' 39.13"N 77° 32' 26.84"E 30. 09° 19' 33.27"N 77° 32' 31.76"E 14. 09° 19' 39.57"N 77° 32' 27.01"E 31. 09° 19' 32.06"N 77° 32' 34.68"E 15. 09° 19' 39.18"N 77° 32' 28.06"E 32. 09° 19' 31.07"N 77° 32' 34.28"E 16. 09° 19' 38.77"N 77° 32' 27.85"E 33. 09° 19' 30.31"N 77° 32' 33.44"E 17. 09° 19' 38.82"N 77° 32' 29.11"E 34. 09° 19' 29.02"N 77° 32' 32.50"E Please refer Mine Lease Plan - Plate No.II. c). Attach a general location map showing area and access routes. It is preferredthat the area be marked on a Survey of India topographical map or a cadastralmap or forest map as the case may be. However, if none of these are available,the area may be shown on an administrative map. Please refer Location plan (Plate No.I). -5- Modification of Approved Mining Plan& PMCP Thenmalai Limestone Mine 3.0 DETAILS OF APPROVED MINING PLAN / SCHEME OF MINING (if any) 3.1 Date and reference of earlier approved MP/SOM The previous scheme of mining (2015-16 to 2019-20) was approved by Indian Bureau of Mines vide letter No. TN/TNL/LST/MS-1282 MDS, dated 18.12.2015 and it was valid for five years. (Please refer annexure No –XI) 3.2 Details of last modifications if any (for the previous approved period) of approved MP/SOM, indicating date of approval, reason for modification The previous scheme of mining (2015-16 to 2019-20) was approved by Indian Bureau of Mines vide letter No. TN/TNL/LST/MS-1282 MDS, dated 18.12.2015 and it was valid for five years. In the previous scheme of mining the proposed quantity of limestone is very low.Due to the marketing demand the production of limestone is increasing in the plan period.(Please refer annexure No –XI) Hence we have prepared modified mining plan(2017-18 to 2019-20) along with PMCP is prepared now for submission to Indian Bureau of Mines for approval under Rules 17(3) of MCR 2017. 3.3Give review of earlier approved proposal (if any) in respect of exploration,excavation, reclamation etc. i. Exploration: In the previous approved scheme of Mining period (2015-16 to 2016-17), four boreholes of 5m depth was proposed, but five boreholes (DBH1-DBH5) upto 37m depth was carried out by the lessee during the previous plan period in the year 2014 (Aug 2014 - oct 2014), to find out the grade of limestone, lateral variations and vertical in homogeneities of the limestone formation and depth persistence. At present there is one existing pit and its dimension is given below Existing Pit Geometry: Table-6 Pit Length Width Depth Area Dip˚ Strike No. in Meter in Meter in Meter InHa. 1 23 17 6 0.03.9 SW 800 N600W-S600E 2 20 15 4 0.03.0 SW 800 N600W-S600E 3 32 22 41 0.07.4 SW 800 N600W-S600E With the datas analyzed from the drilled borehole and existing pit, the deposit has been proved upto37m depth with an average of 1m topsoil. The borehole logging datas are furnished below. Litho log of drilled boreholes: Table-7 Depth of deposition No. of bore holes Depth of boreholes (m) Strata of Limestone 134.2m-133.1m Topsoil DBh - 1 37.2 133.1m-97.0m Limestone 133.9m-133.2 Topsoil DBh - 2 36.9 133.2m-97.0m Limestone 134.1m-132.9m Topsoil DBh - 3 37.1 132.9m-97.0m Limestone 134.2m-133.1m Topsoil DBh - 4 37.2 133.1m-97.0m Limestone 134.1m-133.3m Topsoil DBh - 5 10.1 133.3m-124.0m Charnockite Locations of drilled boreholes are marked in the geological plan and sections and year wise plan and sections (Refer Plate No.IV& V). The lessee with his consultant geological team thoroughly studied the area and demarcated the attitude of the bed. It is inferred that the limestone is cement grade and in the form of two band running from N600W-S600E direction with dipping SW 800. -6-

Description:
uno **::::,^u_1;i;;;;;;Jy,::*r-*;ilil;;i r**ar arr,ri*ni**-oIor. Eny per$ons r,TilT##In'jXl,$f-.J."ui,'J'i,'#u*u"irv tr'qd;;i;li, r**o,n* sureri*s r*rxhe p*r{orman*e. 108
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.