Littlehampton Arun East Bank Tidal Walls Flood Defence Scheme Environmental Statement Volume Two – Main Text May 2013 i River Arun East Bank, Environmental Statement, Draft We are the Environment Agency. We protect and improve the environment and make it a better place for people and wildlife. We operate at the place where environmental change has its greatest impact on people’s lives. We reduce the risks to people and properties from flooding; make sure there is enough water for people and wildlife; protect and improve air, land and water quality and apply the environmental standards within which industry can operate. Acting to reduce climate change and helping people and wildlife adapt to its consequences are at the heart of all that we do. We cannot do this alone. We work closely with a wide range of partners including government, business, local authorities, other agencies, civil society groups and the communities we serve. Published by: Environment Agency Horizon house, Deanery Road Bristol BS1 5AH Email: enquiries@environment- agency.gov.uk www.environment-agency.gov.uk Further copies of this report are available © Environment Agency 2011 from our publications catalogue: http://publications.environment- All rights reserved. This document may be agency.gov.uk or our National Customer reproduced with prior permission of Contact Centre: T: 03708 506506 the Environment Agency. Email: enquiries@environment- agency.gov.uk. ii River Arun East Bank, Environmental Statement, Draft Environmental Statement Volume Two - Main Text Project name Littlehampton Arun East Bank Tidal Walls Flood Defence Scheme Project 1B1S reference IMSO001021 Region and Area South East Date 29-05-13 Version number 1 Author E Joanna Walker Revision history Revision Summary of changes Author Version date number May 2013 First issue, Final E Joanna Walker 1 Approvals Name Signature Title Date Version Fiona Brown Fiona Brown Director, Halcrow Group 29-5-13 1 (Ch2mhill) Imran Bukhari Imran Bukhari Project Director Europe, 29-5-13 1 Halcrow Group (Ch2mhill) Distribution Name Title Date Version Cian Cronin Senior Planner (Strategic Development), Arun District 30-5-13 1 Council Richard Woodward Senior Environmental Project Manager, national 30-5-13 1 Environmental Assessment Services, Environmental Agency Peter Borsberry NCMPS Project Manager, Environment Agency 30-5-13 1 iii Littlehampton Arun East Bank Tidal Walls, Environmental Statement EIA Quality Mark This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant environmental effects of the proposed development, was undertaken in line with the EIA Quality Mark Commitments. The EIA Quality Mark is a voluntary scheme, operated by the Institute of Environmental Management and Assessment (IEMA), through which EIA activity is independently reviewed, on an annual basis, to ensure it delivers excellence in the following areas: EIA Management EIA Team Capabilities EIA Regulatory Compliance EIA Context & Influence EIA Content EIA Presentation Improving EIA practice To find out more about the EIA Quality Mark please visit: www.iema.net/qmark iv Littlehampton Arun East Bank Tidal Walls, Environmental Statement Non-Technical Summary A Non-Technical Summary has been prepared which aims to provide sufficient information for a member of the public to understand the significant environmental effects of the proposed scheme without having to refer to the main text. The Non-Technical Summary is available as a stand-alone document at the same location as the Environment Statement. A short summary of the key findings is also presented in final chapter of this Volume of the Environmental Statement. v Littlehampton Arun East Bank Tidal Walls, Environmental Statement Contents Part One – The Proposed Scheme 1 Background 1 2 Project development 7 3 Scheme description 14 4 Key issues and methodology 24 Part Two – Assessment of the Scheme 5 Acoustics 31 6 Archaeology and heritage 39 7 Biodiversity 52 8 Ground conditions 63 9 Landscape, townscape and visual issues 71 10 Land use 82 11 Traffic and transportation 86 12 Water resources and flood risk 94 13 Other issues 103 14 Cumulative impacts and inter-relationships 106 15 Planning and legislation 109 16 Summary 114 17 References 116 Environmental Action Plan vi Littlehampton Arun East Bank Tidal Walls, Environmental Statement Landscape Masterplans 3483 PL 101 Landscape Masterplan Reach 1 (Sheet 1 of 3) 3483 PL 102 Landscape Masterplan Reach 1 (Sheet 2 of 3) 3483 PL 103 Landscape Masterplan Reach 1 (Sheet 3 of 3) 3483 PL 104 Landscape Masterplan Reach 2 3483 PL 105 Visualisations Reaches 1 and 2 3483 PL106 Section Elevations Reaches 1 and 2 3483 PL 107 Landscape Masterplan Reach 3 3483 PL 108 Landscape Masterplan Reach 4 3483 PL 109 Details Reach 4 3483 PL 110 Landscape Masterplan Reach 5 (Sheet 1 of 2) 3483 PL 111 Landscape Masterplan Reach 5 (Sheet 2 of 2) 3483 PL 112 Landscape Masterplan Reach 6 (Sheet 1 of 2) 3483 PL 113 Landscape Masterplan Reach 6 (Sheet 2 of 2) Engineering Drawings 463457-CIVIL-100-P1 Reaches 1 and 2 General Arrangement Plan (Sheet 1 of 2) 463457-CIVIL-101-P1 Reaches 1 and 2 General Arrangement Plan (Sheet 2 of 2) 463457-CIVIL-103-P2 Reaches 1 and 2 General Arrangement Sections 463457-CIVIL-300-P1 Reach 3B (private frontage) General Arrangement Plan 463457-CIVIL-301-P1 Reach 3B (private frontage) General Arrangement Sections 463457-CIVIL-302-P1 Reach3B (private frontage) General Arrangement Elevations 463457-CIVIL- 400-P2 Reach 4 General Arrangement Plan 463457-CIVIL- 401-P2 Reach 4 General Arrangement Sections 463457-CIVIL-500-P2 Reach 5A (Arun View public house) General Arrangement Plan 463457-CIVIL-501-P2 Reach 5A (Arun View public house) General Arrangement Sections 463457-CIVIL-550-P2 Reach 5B (Arun View public house) General Arrangement Plan 463457-CIVIL-560-P1 Reach 5B Details 463457-CIVIL-600-P3 Reach 6 General Arrangement Plan (Sheet 1 of 2) 463457-CIVIL-601-P3 Reach 6 General Arrangement Plan (Sheet 2 of 2) vii Littlehampton Arun East Bank Tidal Walls, Environmental Statement 463457-CIVIL-602-P2 Reach 6 General Arrangement Sections (Sheet 1 of 3) 463457-CIVIL-603-P2 Reach 6 General Arrangement Sections (Sheet 2 of 3) 463457-CIVIL-604-P2 Reach 6 General Arrangement Sections (Sheet 3 of 3) Figures Figure 1.1 Site location plan Figure 1.2 Site location plan in local context Figure 1.3 Plan of scheme reaches and planning requirements Figure 2.2 Key environmental features, South Figure 2.2 Key environmental features, North Figure 6.1 Designated cultural heritage assets - North Figure 6.2 Designated cultural heritage assets - South Figure 6.3 Non-designated cultural heritage assets - North Figure 6.4 Non-designated cultural heritage assets - South Figure 6.5 Rapid coastal zone assessment data Figure 6.6 Historic landscape character data Figure 6.7 Archaeological sensitivity plan Figure 6.8 Ground investigation results and known archaeology Figure 6.9 Ordnance survey West Sussex sheets LXIII/13, 1:2500, 1876 , Reach 6 Figure 7.1 Phase 1 habitat plan Figure 8.1 Geo-environmental interpretative long sections (1 of 4) Figure 8.2 Geo-environmental interpretative long sections (2 of 4) Figure 8.3 Geo-environmental interpretative long sections (3 of 4) Figure 8.4 Geo-environmental interpretative long sections (4 of 4) viii Littlehampton Arun East Bank Tidal Walls, Environmental Statement List of abbreviations ADC Arun District Council BAP Biodiversity Action Plan BGS British Geological Survey dB decibel dB(A) A-weighted decibel DBA Desk-Based Assessment DEFRA Department for Environment, Food and Rural Affairs EA Environment Agency EC European Commission ECoW Ecological Clerks of Works EIA Environmental Impact Assessment EQS Environmental Quality Standards ES Environmental Statement EU European Union EUS Extensive Urban Survey GQA General Quality Assessment ha hectare HGV Heavy Goods Vehicle IEA Institute of Environmental Assessment IEEM Institute of Ecology and Environmental Management IEMA Institute for Environmental Management and Assessment km kilometre LAeq A-weighted equivalent noise level parameter LAmax A-weighted maximum sound pressure level LNR Local Nature Reserve m metre m2 square metre MAGIC Multi-Agency Geographical Information for the Countryside mm millimetre N/A Not Applicable NJUG National Joint Utilities Group Guidelines NNR National Nature Reserve ix Littlehampton Arun East Bank Tidal Walls, Environmental Statement No. number NPPF National Planning Policy Framework PPG Planning Policy Guidance (Planning) PPG Pollution Prevention Guidelines (Water quality) PPS Planning Policy Statement RSS Regional Spatial Strategy SAC Special Area of Conservation SM Scheduled Monument SMP Shoreline Management Plan SNCI Site of Nature Conservation Importance SPA Special Protection Area SSSI Site of Special Scientific Interest UKBAP United Kingdom Biodiversity Action Plan WFD Water Framework Directive WCA Wildlife and Countryside Act WSCC West Sussex County Council x Littlehampton Arun East Bank Tidal Walls, Environmental Statement
Description: