ebook img

learning event: all presentations - Mar 2013 - UK Power Networks PDF

61 Pages·2013·3.27 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview learning event: all presentations - Mar 2013 - UK Power Networks

Flexible Plug and Play Smart Solutions for connecting Distributed Generation Sotiris Georgiopoulos Contents • Introduction to Flexible Plug and Play • Trial location • Case studies • Overall project plan • Commercial arrangements workstream • Concepts to keep in mind throughout the day 2 2011. UK Power Networks. All rights reserved Flexible Plug and Play Objective: Cheaper and faster connection of DG to constrained parts of the network by trialing smart grid technologies and smart commercial agreements Duration: 3 years: January 2012 - December 2014 Project Value: £9.7 million (6.7m funding from LCNF Tier 2) Partners: 2011. UK Power Networks. All rights reserved Flexible Plug and Play: Trial location Connected Wind Farms Grid Substation Consented Wind Farms Primary Substation Received Applications Wind Farms 33 kV 132 kV 400 kV Scoping Sites Wind Farms Location: Cambridgeshire Surface: ~ 700km² Network: 33kV and 11kV Network (2 Grid, 10 Primary substation sites) Connected Wind Generation: 120MW Planning & Delivery Stage: approx 270MW 2011. UK Power Networks. All rights reserved In the context of the heat map The challenge – March Grid (case study) Constraints (focus on 33 and 11kV) • Reverse power flow limitations • Thermal line limits 5 Classification: Restricted 2011. UK Power Networks. All rights reserved Case Study 1: March Grid The challenge – March Grid (case study) The challenge Constraints • Reverse power flow limitation (N- 1) due to protection – set at a max of 75% rating of the transformer • Constraint occurs at min Load max Gen situations Consequences • Substation considered full • Very expensive quotes for connections to projects in the vicinity (Distance or increased voltage level) G L Generator Load Circuit breaker 6 Classification: Restricted 2011. UK Power Networks. All rights reserved Case Study 1: March Grid The solutions MEASURE • Reverse power flow limitation (N-1) due to legacy protection – currently set at 75% rating of the transformer • Solutions:  Novel protection scheme CONTROL G  Active Network Management Interruptible generation  IP Communications  Suitable commercial & contractual framework G CONTROL Interruptible generation 7 2011. UK Power Networks. All rights reserved Case Study 2: Single Wind Farm Dynamic Line Rating Business as Usual: Smart Solution: • Higher costs  Smart Device – Dynamic Line Rating (DLR) • Longer lead times  Active Network Management (ANM) System  Smart Commercial Arrangements WAN / Local Substation Local Substation RF Mesh thermal constraint thermal constraint DLR New 33kV underground cable Closest point of connection ANM Proposed New Proposed New Generation Project Generation Project 2011. UK Power Networks. All rights reserved Timetable Successful Delivery Reward Criteria - SDRC SDRC 9.4 SDRC 9.3 SDRC 9.1 Demonstrate FPP IP Comms SDRC 9.8 Stakeholder Characteristics (ANM live) SDRC 9.6 Platform - LIVE Deploy Quad Engagement Completion of core Offer of FPP Booster report infrastructure deployment connection to real customers Sep Dec Mar Jun Sep Dec 2014 2012 2012 2013 2013 2013 SDRC 9.2 SDRC 9.5 SDRC 9.7 Development of FPP Connection Delivery of Strategic Demonstration of smart commercial offers First issue Investment active power flow arrangements to customers Model and voltage management Trial Participant Engagement 2011. UK Power Networks. All rights reserved 9 Customer engagement  Seven projects seeking connection in the trial area were identified and six of them (26.2MW) have received FPP offers on1 March 2013  The FPP “Opt-in” offer introduced a standstill period and a commitment to UK Power Networks to provide an alternative by 01/03  Customers received a “Briefing Document” which is an FPP information pack  Applications were consolidated in the FPP area to ensure all customers are treated equally Accept FPP variation S16 offer with Receive s16 Accept s16 FPP Enquiry and FPP Opt in variation Proceed with Offer & opt investigation application option including FPP s16 Offer into FPP period alternative 1st Walk away stage payme nt 1 March 2013 2011. UK Power Networks. All rights reserved

Description:
Characteristics (ANM live) Orkney, SSE. LIFO. NO. Connect . FPP customers connect to ANM: All future generation that connects within the constrained area.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.