UTTAR PRADESH JAL NIGAM D.P.R. FOR THE KUDRAHA GROUP OF VILLAGES WATER SUPPLY SCHEME(SMVS) BLOCK: - KUDRAHA DISTRICT – BASTI UNDER: R.W.S.S.P.-LIS (WORLD BANK) (CATEGORY:-SMVS) Capital Cost : Rs. 376.82 Lacs EXECUTIVE ENGINEER Estimate No. : Ist Construction Division, Year : 2013-2014 U.P. Jal Nigam Basti INDEX PRELIMINARY D.P.R. FOR THE KUDRAHA GROUP OF VILLAGES WATER SUPPLY SCHEME(SMVS) UNDER: R.W.S.S.P.-LIS (WORLD BANK,CATEGORY:-SMVS) INDEX Page no Particulars Sl. No. From To 1 2 3 4 1 Salient features 1 2 2 Project Report 3 15 3 Financial Statement 3.1 Form “J” (Comprehensive) 16 16 3.2 General Abstract of Cost (Comprehensive) 17 17 3.3 General Abstract for Operation and Maintinance 18 18 3.4 Form “J” (Civil) 19 19 3.5 General Abstract of Cost (Civil) 20 20 3.6 Form “J” (E&M) 21 21 3.7 General Abstract of Cost (E&M) 22 22 4 Economics 4.1 Abstract of Economics 23 23 4.2 Statement of Annual Income 24 24 4.3 Annual recurring expenditure on Maintenance 25 25 4.4 Annual recurring expenditure on Maintenance Staff 26 26 4.5 Annual recurring expenditure on Chemicals 27 27 4.6 Annual recurring expenditure on Electricity 28 28 4.7 Annual recurring expenditure on Repair of Works 29 29 4.9 Annual recurring expenditure on cess levy 30 30 4.8 Break up of Cost 31 31 5 Technical Statement 32 53 6 Estimates ( Civil Works ) 6.1 Estimate for Pump House Cum Chloronomme 54 54 6.2 Estimate for Rising Main and Appurtenent Works 55 57 6.3 Estimate for R.C.C. Over Head Tank 58 61 6.4 Estimate for Distribution System 6.41 Estimate for Bulk Distribution System 62 64 6.42 Estimate for Intra-Village Distribution System for G.P.-1 65 68 6.43 Estimate for Intra-Village Distribution System for G.P.-2 69 72 6.44 Estimate for Intra-Village Distribution System for G.P.-3 73 75 6.45 Estimate for Intra-Village Distribution System for G.P.-4 76 79 6.46 Details of Pipe 80 88 6.47 Details of Excavation 89 89 6.48 Details of Sluice valve, Air valve, Scour valve and Fire Hydrant 90 91 6.49 Details of Road Cutting 92 100 6.50 Estimate for boundary wall and gate 101 101 6.51 Estimate for Staff Quarter 102 102 6.52 Estimate for SCADA 103 103 6.53 Estimate for Maintinance (3 months Trial) 104 104 7 Estimates ( E&M Works ) 7.1 Estimate for Construction of T.W. 105 108 INDEX Page no Particulars Sl. No. From To 1 2 3 4 7.2 Estimate for Pumping plant & Chlorinating Plant 109 111 7.3 Estimate for Internal Electrification 112 112 7.4 Estimate for Transmission line 113 113 8 Unit Estimate 8.1 Unit Estimate of pump house by pass chamber 114 120 8.2 Unit Estimate of boundary wall 121 123 8.3 Unit Estimate of gate with pillar 124 127 8.4 Unit Estimate of staff quarter 128 131 8.5 Unit Estimate of sluice valve chamber(masonary type) 132 134 8.6 Unit Estimate of sluice valve chamber(surface box type) 135 135 8.7 Unit Estimate of fire hydrant chamber 136 137 8.8 Unit Estimate of air valve chamber 138 139 8.9 Unit Estimate for connection 140 140 9 Schedule of rates 141 162 10 Annexure 10.1 Labour material rates 163 169 10.2 Water test report 170 171 10.3 Strata chart 172 175 10.4 Hydrogeological Feasibility Report 176 176 10.5 Design of Drilling and Size of pipes for construction of T.W. 177 178 10.6 Selection of Dozer 179 179 10.7 Consumption of Pee Gravel 180 180 10.8 Clearification about Transportation of Rig Machine. 181 181 10.9 Sanitary Survey of Water Supply Sources 182 182 10.10 Disaster Management Data Sheet 183 184 10.11 Environmental Data Sheet 185 187 10.12 Generic Environment Management plan 188 190 10.13 Gram Panchayat Proposal for land 191 195 11 Maps and Drawing 11.1 Map of Utter Pradesh 196 196 11.2 Map of District 197 197 11.3 Seismic map of India 198 198 11.4 Wind Zone map of India 199 199 11.5 Drawing of Pump House 200 200 11.6 Drawing of Staff Quarter 201 201 Type Design Drawing of Chambers,Doser connection,Pump house 11.7 connection,Culvert crossing, Nala crossing, Thrust block, Boundry wall with gate and detail of pipe in OHT 202 213 11.8 Site Plan 214 214 11.9 Key Plan 215 215 11.10 Base Map of G.P.1 216 216 11.11 Base Map of G.P.2 217 217 11.12 Base Map of G.P.3 218 218 11.13 Base Map of G.P.4 219 219 11.12 Hydraulic flow diagrame of G.P.1 220 220 11.13 Hydraulic flow diagrame of G.P.2 221 221 11.14 Hydraulic flow diagrame of G.P.3 222 222 11.15 Hydraulic flow diagrame of G.P.4 223 223 SALIENT FEATURES D.P.R. FOR THE KUDRAHA GROUP OF VILLAGES WATER SUPPLY SCHEME(SMVS) UNDER: R.W.S.S.P.-LIS (WORLD BANK, CATEGORY:-SMVS) BLOCK - KUDRAHA, TEHSIL - BASTI SADAR , DISTT.- BASTI SALIENT FEATURE D.P.R. FOR THE KUDRAHA GROUP OF VILLAGES WATER SUPPLY 1a. Name of project SCHEME(SMVS) 1b. Name of Block/Tehsil/Distt. BLOCK - KUDRAHA, TEHSIL - BASTI SADAR , DISTT.- BASTI Name of Gram Panchayat in 1c. Kudraha, Jibhiyao, Chardahi and Baisiya Kala Group 2 Population Census Base Middle Ultimate 2011 2015 2030 2045 9232 9700 11800 14300 3 Source of Water Underground 4 Rate of water supply in lpcd 80.50 5 Head works Tube well 6 Nature of treatment Disinfections 7 Kudraha Location of land for water works 8 Conveyance A. RISING MAIN P. H. No. Type of Pipe Class Dia L ength (in mm) (in m) 1 D.I. K-7 200 30 B. BYE PASS 1 D.I. K-7 200 10 Grand Total 40 C. DISTRIBUTION SYSTEM Sl.No. Type of Pipe Class Dia L e n g t h (in mm) (in m) 1 PVC PIPES 6kg/sqcm 200 25 2 PVC PIPES 6kg/sqcm 160 1670 3 PVC PIPES 6kg/sqcm 140 1847 4 PVC PIPES 6kg/sqcm 110 4889 5 PVC PIPES 6kg/sqcm 90 2266 6 PVC PIPES 6kg/sqcm 75 2516 7 PVC PIPES 6kg/sqcm 63 24450 Total= 37663.00 9 Service Reservoir Capacity S t a ging Sl.No. Type Detail (in Kl.) (in m) 1 O.H.T. Proposed 800 16 10 Disinfections Sl. no. Type Details a. Type of Chlorinator pressur feed jar type of capecity 24 gallon. b. Maximum Dose 1.00 ppm c. Average Dose 0.50 ppm d. Residual Chlorine 0.20 ppm 11 Financial implications Ultimate Initial Middle Stage(2015) Stage(2030) Stage(2045) a Total Capital cost in Rs. 37682300.0 37682300.0 37682300.0 b Per capita cost in Rs. 3884.77 3193.42 2635.13 c Average water produced per day in Kl. 781.00 950.00 1151.00 d Cost of water production per Kl.(n Rs.) 3.04 3.11 3.47 Initial Middle Ultimate 12 Annual Expenditure(in Rs.) Stage(2015) Stage(2030) Stage(2045) a Expenditure on maintenance staff 288000.00 324000.00 360000.00 b Expenditure on chemicals 12980.00 16650.00 21130.00 c Expenditure on electricity 307410.00 309440.00 477050.00 d Expenditure on annual maintenance and 62500.00 108100.00 153800.00 repair charges e Cess Charges 1996.00 2429.00 2943.00 Total= 672886.00 760619.00 1014923.00 Initial Middle Ultimate 13 Annual Income (in Rs.) Stage(2015) Stage(2030) Stage(2045) a Number of house holds 1940 2360 2860 b Number of anticipated house connections 1940 2360 2860 Annual rental value of private connection c 1629600.00 2265600.00 3088800.00 charges Total 1629600.00 2265600.00 3088800.00 Annual maintenance expenditure Rs. 672886.00 760619.00 1014923.00 Net Profit (+) / Loss (-) 956714.00 1504981.00 2073877.00 ASSISTANT ENGIEER PROJECT REPORT D.P.R. FOR THE KUDRAHA GROUP OF VILLAGES WATER SUPPLY SCHEME(SMVS) UNDER: R.W.S.S.P.-LIS (WORLD BANK, CATEGORY:-SMVS) BLOCK - KUDRAHA, TEHSIL - BASTI SADAR , DISTT.- BASTI PROJECT REPORT 1.0 AUTHORITY : Utter pradesh selected for the world bank programme, so this pipe water supply Scheme has been prepared as per instruction of C.E.(Rural) U.P.Jal Nigam, Lucknow in the meeting organised by him on dated 11-03-2013 under Rural Water Supply Scheme (RWSSP-LIS For World Bank). 1.1 INTRODUCTION 1.2 OBJECTIVE : Most Population of India lives in villages. Rural sector has got a significant role in overall development of the country. An indian village, apart from being a representive unit of Indian culture, custom, traditions, social and religious, rituals it also occupies an important place in shaping the agriculture based economic system of the country. Inspite of huge allocation of national budget for rural sector every year, a little so for could be done towards providing basic infra structural facilities in rural sector of the country. Drinking water supply, drainage, sanitation and waste disposal are still the areas requiring particular attention of the nation. Present condition of these services in U.P., the most populous state of the country, does not leave a good impression on the observer besides adding to unsanitary conditions and environmental pollution and in the long run affecting the national economy. It is also imperative to mention that supply of safe and adequate drinking water to the people is directly associated with the physical, social and economic health of the country. 2.0 SCOPE OF PROJECT 2.1 LOCATION : Four Gram panchayat namely Kudraha, Jibhiyao, Chardahi and Baisiya Kala are included in this scheme.The District Basti is one of the three Districts of Basti Commissionary with the head quarter at Basti. It is located in East Uttar Pradesh. District Basti is surrounded by District Santkabeer Nagar in East, District Faizabad and District Ambedkar Nagar in South , District Siddharthnagar in north and District Gonda in the west. The Letitude & Longitude of the Village is 26°36'35''N & 82°49'13''E respectively and the District Head Quarter is connected by rail and road with Lucknow main line of North Eastern railway on broad gauge. The village Kudraha, Jibhiyao, Chardahi & Baisiya Kala is situated at Ram Janki road and Kudraha to Lalganj road in block Kudraha of Tehsil Basti Sadar. The project area consisting of four Gram Panchayat namely Kudraha, Jibhiyao, Chardahi & Baisiya Kala and these gram panchayat consisting nine revenue villages details shows as below. Name of Name Census Census Population Popula Code Name of habitation Gram of decade Total SC/ST tion of 1971 1172 1399 278 1.Kudraha Khas 1200 1981 1369 1528 - 2.Chamrauti 290 1991 1391 1512 379 3.Belwariya Purwa 263 1.Kudr 4.Masraghwa Chamar Kudraha aha 2001 7480700 2398 490 145 tola 5.Puchkarwa 240 6.Rethiya 260 Total= 2398 1971 1173 247 136 1.Shankarpur 348 2.Shan 1981 1485 524 0 Kudraha karpur 1991 1390 317 159 2001 07480600 348 193 Total= 348 1971 1171 257 88 1.Ujiyanpur 714 3.Ujiya 1981 1370 270 0 Kudraha npur 1991 1392 542 134 2001 07480800 714 147 Total= 714 1971 1170 1165 221 1.Jibhiyao 1057 1981 1367 1417 0 2.Chamrauti 261 1991 1389 1795 283 3.Maurya purwa 186 Jibhiy 2001 07480500 2111 391 4.Muslim tola 131 Jibhiyao ao 5.Pandey purwa 136 6.Pipariya 231 7. Teli Purwa 109 Total= 2111 1971 1153 821 86 1.Chardahi 816 Chard 1981 1356 886 0 2.Paltipurwa 272 Chardahi ahi 1991 1378 1105 116 2001 07479400 1088 87 Total= 1088 1971 1179 453 155 1.Baisia Kala 282 1981 1373 629 0 2.Anariya 56 1991 1395 752 239 3.Chamar tola- I 66 1.Baisi 2001 07481100 705 108 4.Chamar tola-II 42 Baisiya ya 5.Dubahana 56 Kala Kala 6.Gothaipur chamar 71 tola 7.Jethu purwa 56 8.maurya purwa 76 Total= 705 1971 1448 0 0 1.Baisiya khurd 2 2.Baisi 1981 1455 0 0 ya 1991 1476 0 0 Kurd 2001 07489200 2 1 Total= 2 1971 1178 174 37 1. Jamalpur 252 3.Jam 1981 1374 186 0 alpur 1991 1396 224 30 2001 07481200 252 44 Total= 252 1971 1180 97 15 1.Kalyanpur 192 4.Kaly 1981 1372 147 0 anpur 1991 1394 194 21 2001 07481000 192 24 Total= 192
Description: