ebook img

KC Streetcar Main St Extension Public Mtg 2 Boards Maps 4 PDF

2018·0.06 MB·English
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview KC Streetcar Main St Extension Public Mtg 2 Boards Maps 4

Project Lifecycle Ongoing Project Development Design Construction Testing Operations < < < < < Determine which lane Coordinate with local Communication Dry-run Riders are the streetcar will run utilities (such as with those along testing & ready to in, how many stops & electric, water, gas, the route who will careful board! where stops will go cable, etc.) be affected by consideration < Ongoing construction for rider < < Identify system needs Finalize track & maintenance safety < station locations Ongoing utility < Develop a funding  coordination/ < 2023 strategy & advance Prepare design & 2022 – 2023 relocation federal grant request construction documents 2020 – 2022 2017 – 2018 < Vehicle procurement 2018 – 2020 Proposed timeframes are approximate and subject to change. The input received at tonight’s meeting will help the Project Team advance the extension into the Design Phase. Main Street Extension to UMKC

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.