ebook img

International Journal of Production Research 1999: Vol 37 Index PDF

15 Pages·1999·2.8 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview International Journal of Production Research 1999: Vol 37 Index

INT. J. PROD. RES.. 1999. VOL. 37. No. 18. 4289-4302 INDEX OF AUTHORS (WITH TITLES) PAGI Abdou, G., and Elmasry, M.: 3D random stacking of weakly heterogeneous palletiza- tion problems Aekambaram, R., and Raman, S.: Improved tool path generation, error measures and analysis for sculptured surface machining Aguiar, M. W. C., and Edwards, J. M.: Achieving manufacturing business integration through the combined formalisms of CIMOSA and Petri nets Akturk, M. S., and Erhun, F An overview of design and operational issues of kanban systems Aldakhilallah, K. A., and Ramesh, R., Computer-Integrated Process Planning and Scheduling (CIPPS): intelligent support for product design, process planning and control Anand, S., see Rajagopal, K Anantharaman, R. N., see Nelson Joseph, I Ang, C.-L.: Enactment of IDEFO models Ang C.-L., Pheng, K. L., and Leng, G. R. K: IDEF*: a comprehensive modelling methodology for the development of manufacturing enterprise systems Ang, C. L., see Pheng, K. | Arupathi, R., see Cheraghi, S. H Asano, M., and Ohta, H.: Scheduling with shutdowns and sequence dependent set-up times 1661 Askin, R. G., Ciarallo, F. W., and Lundgren, N. H.: An empirical evaluation of holonic and fractal layouts 961 Azadivar, F., and Shu, V.: Maintenance policy selection for JIT production systems 2796 Babic, B.: Axiomatic design of flexible manufacturing systems Baines, T. S., Whitney, D. E., and Fine, C.: Manufacturing technology sourcing practices in the USA Balogun, O. O., and Popplewell, K.: Towards the integration of flexible manufacturing system scheduling Bard, J. F., Srinivasan, K., and Tirupati, D.: An optimization approach to capacity expansion in semiconductor manufacturing facilities Bartsch, T., see Pesch, I Basu, S., Dutta, S. P., and North, W. P. T.: A process modelling framework for AGV control Bateman, N., Stockton, D. J., and Lawrence, P.: Measuring the mix response flexibility of manufacturing systems Batocchio, A., see Duran, O Batta, R., see Narasimhan, R Batta, R., see Oboth, ¢ Ben-Gal, I., Braha, D., and Maimon, O. Z.: Probabilistic sequential methodology for designing a factorial system with multiple responses Bennell, J. A., Dowsland, K. A.: A tabu thresholding implementation for the irregular stock cutting problem Berry, W. L., Hill, T., and Klompmaker, J. E.: Aligning marketing and manufacturing strategies with the market Besant, C. B., see Zhou, Q Bhaskara Reddy, S. V.. Shunmugam, M. S., and Narendran Operation sequencing in CAPP using genetic algorithms Bobrowski, P. M.. see Moodie, D. R Boctor, F. F., see Quenniche, J 4290 Index of authors (with titles Bolden, R., see Waterson, P. Bragg, D. J.. Duplaga, E. A., and Watts, C. A.: The effects of partial order release and component reservation on inventory and customer service performance in an MRP environment Braglia, M., and Petroni, A.: Evaluating and selecting investments in industrial ~ robots Braha, D.. see Ben-Gal, | Brandimarte, P., and Maiocco, M.: Job shop scheduling with a non-regular objective 1 comparison of neighbourhood structures based on a sequencing/timing decomposition Brandolese, A., and Cigolini, R.: A new model for the strategic management of inventories subject to peaks in market demand Brunn, P., see Shafaei, R Bulgak, A. A., Tarakei, Y., and Verter, V.: Robust design of asynchronous flexible assembly systems Burnak, N., see Dedeakayogullari, | Bushee, D. C., and Svestka, J. A.: A bi-directional scheduling approach for job shops attrysse, D., see Duflou, J. R avalier, T. M., see Fraticelli, B. M. P avalier, T. M.. see Wheeler, D. I ha, J., see Jiao, J hadi Sassine, see Zineb Simeu-Abazi hakravarty, A. K.: Profit margin, process improvement and capacity decisions in global manufacturing han, L. K., Kao, H. P., Ng, A., and Wu, M. L.: Rating the importance of customer needs in quality function deployment by fuzzy and entropy methods hang, C. A., see Tien, F.-€ hang, M., see Park, S hang, S. L., and Ho, E. S.: A two-stage neural network approach for process variance change detection and classification hang, S.-H., see Huang, C.-l hang, S. L., see Ho, E. S hang, T.-Y., see Huang, C.-I helst, K., see Yassine, A hen, C.-C., Yih, Y., and Wu, Y.-C.: Auto-bias selection for developing learning- based scheduling systems hen, C.-W., and Sha, D. Y.: A design approach to the multi-objective facility layout problem hen, F. L., see Chiang, Y. M hen, M.: A heuristic for solving manufacturing process and equipment selection problems hen, M., and Dong, Y.: Applications of neural networks to solving SMT scheduling problems—a case study hen, M.-T. (Mark), McGinnis, L., and Zhou, C.: Design and operation of single-loop dual-rail inter-bay material handling system hen, S.-J. (Gary), and Lin, L.: Reducing total tardiness cost in manufacturing cell scheduling by a multi-factor priority rule hen, X., see Cheraghi, S. H heng, S. K., and Rao, K. P.: Concepts of neighbourhood and universal compact yield towards achieving best pattern layouts hep, A., and Tricarico, L.: Object-oriented analysis and design of a manufacturing feature representation heraghi, S. H., Chen, X., Twomey, J. M., and Arupathi, R.: A closed-loop process analysis and control system for machining parts hiang, Y. M., and Chen, F. L.: Sculptured surface reconstruction from CMM measurement data by a software iterative approach Index of authors (with titles hittratanawat, S., and Noble, J. S.: An integrated approach for facility layout, P/D location and material handling system design hoobineh, F., and Nare, A.: The impact of ignored attributes on a CMS design houng, Y. I., see Sung, C. S hun, S. J., see Lee, Y. H hung, C.-H., see Huang, C.-I iarallo, F. W., see Askin, R. G igolini, R., see Brandolese, A lark, H. J., and Tannock, J. D. T.: The development and implementation of a simulation tool for the assessment of quality economics within a cell-based manufacturing company lege. C. W.. see Waterson, P. | loutier, G., see Phan, A.-\ ochran, J. K., and Horng, H-.C.: Dynamic dispatching rule-pairs for multitasking workers in JIT production systems ontreras, N., see Dowlatshahi, S Da Silveira, G.: A methodology of implementation of cellular manufacturing 467 Daita, S. T. S., Irani, S. A., and Kotamraju, S.: Algorithms for production flow analysis 2609 Dallery, Y., and Le Bihan, H.: An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers Davies, A., and Williams, J. H.: Modelling level and demand changes in manufac- turing systems de Koster, M. B. M., van der Poort, E. S., and Wolters, M.: Efficient orderbatching methods in warehouses de Meter. E. C.. see Sayeed, Q. A De Toni, A., and Nassimbeni, G.: Buyer-supplier operational practices, sourcing policies and plant performances: results of an empirical research de Vasconcellos, N. M., Jr, and Yoshimura, M.: Life cycle cost model for acquisition of automated systems Deane, R. H., see Gargeya, V. B Dedeakayogullari, I., and Burnak, N.: The determination of mean and or variance shifts with artificial neural networks Deshmukh, A. V., see Krothapalli, N. K. ¢ Diaby. M., see Padillo, J. M Djordjevich, A., see Ostafiev, V. A Dong, Y., see Chen, M Dowlatshahi, S.: Early supplier involvement: theory versus practice Dowlatshahi, S., and Contreras, N.: The role of designer—buyer-supplier in the maquiladora industry Dowsland, K. A., see Bennell, J. A Duc, E., see Thiebaut, I Duffy. J.. see Moskowitz, H Duffy, V. G., and Salvendy, G.: Relating company performance to staff perceptions the impact of concurrent engineering on time to market Duflou, J. R., van Oudheusden, D., Kruth, J.-P., and Cattrysse, D.: Methods for the sequencing of sheet metal bending operations Duplaga, E. A., see Bragg, D. J Duran, O., and Batocchio, A.: Automatic PLC software generator with a natural interface Duri, C., see Lee, H.-S Dutta, S. P., see Basu, S Edwards, J. M., see Aguiar, M. W. ¢ Egbelu, P. J.. see Kim, K.-H Eguia, I., see Lozano, S 4292 Index of authors (with titles Elmaraghy, H. A., see Limaiem, A Elmasry, M., see Abdou, G Elsayed, E. A., see Hong, S. H Erhun, F., see Akturk, M.S Etgar, R., and Shtub, A.: Scheduling project activities to maximize the net present value—the case of linear time-dependent cash flows Falkenburg, D., see Yassine, A Fallah, H., see Shayan, I Feng, S. C., see Zhang, Y Fernandes, K. J., see Usher, J. M Fine, C., see Baines, T. S Franceschini, F., and Romano, D.: Control chart for linguistic variables: a method based on the use of linguistic quantifiers Fraticelli, B. M. P., Lehtihet, E. A., and Cavalier, T. M.: Tool-wear effect compensa- tion under sequential tolerance control Frein, ¥ see Lee, H.-S Fu, J. C., Troy, C. A., and Phillips, P. J.: A matching pursuit approach to small drill bit breakage prediction Gaalman, G. J. C., see van Dam, P Gargeya, V. B., and Deane, R. H.: Scheduling in the dynamic job shop under auxiliary resource constraints: a simulation study Gau, K.-Y., and Meller, R. D.: An iterative facility layout algorithm Gharbi, A., see Kenne, J. P Ghosh, S., see Handfield, R Gindy, N. N., Saad, S. M., and Yue, Y.: Manufacturing responsiveness through integrated process planning and scheduling 2399 Glover, F.. see Pesch, I Gonzalez, W., see Siier, G. A Grobelny, J.: Some remarks on scatter plots generation procedures for facility layout Gu, P., see Rao, H. A Guerrero, F., Lozano, S., Koltai, T., and Larrafieta, J.: Machine loading and part type selection in flexible manufacturing systems Guerrero, F., see Lozano, S Guh, R.-S., and Tannock, J. D. T.: Recognition of control chart concurrent patterns using a neural network approach Gung, R. R., and Steudel, H. J.: A workload balancing model for determining set-up time and batch size reductions in GT flow line workcells Gupta, J. N. D., Luong, L. H. S., and Nguyen, V. H.: Part dispatching and machine loading in flexible manufacturing systems using central queues Gupta. S M see Moore, K. | Halsall, D. N., and Price, D. H. R.: A DSS approach to developing systems to support production planning and control in smaller companies Hamamoto, S., Yih, Y., and Salvendy, G.: Development and validation of genetic algorithm-based facility layout a case study in the pharmaceutical industry Hameri, A.-P., Nihtila, J.. and Rehn, J.: Document viewpoint on one-of-a-kind delivery process Handfield, R., Jayaram, J., and Ghosh, S.: An empirical examination of quality tool deployment patterns and their impact on performance Harding, J. A., Yu, B., and Popplewell, K.: Information modelling: an integration of views of a manufacturing enterprise Harding, J. A., see Toh, K. T. K Inde Hasan, C. N., and Spearman, M ptimal material release times in stochastic production environments Heim, J. A., see Smith, R. P Heragu, S. S., see Kochhar, J. S Heragu, S. S.. see Taylor, G. D Hill, R. M.: The optimal production and shipment policy for buyer integrated production-inventory problem Hill, T., see Berry, W. I Hillier, M. S.: Component commonality in a multiple-period inventory model with service level constraints Ho, E. S., and Chang, S. I.: An integrated neural network approach for simultaneous monitoring of process mean and variance shifts—a comparative study Ho. E. S., see Chang, S. | Ho, T.-F., see Tseng, T.-Y Ho, W.-T., see Yeh, R. H Hong, S. H., Elsayed, E. A., and Lee, M. K.: Optimum mean value and screening limits for production processes with multi-class screening Horng, H.-C., see Cochran, J. K Huang, C.-L., Huang, Y.-H.. Chang, T.-Y., Chang, S.-H., Chung, C.-H., Huang D.-T., and Li, R.-K.: The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks Huang, D.-T., see Huang, C.-I Huang, Y.-H., see Huang, C.-l Hung, R.: Scheduling a workforce under annualized hours Hung, Y.-F., and Leachman, R. C.: Reduced simulation models of wafer fabrication facilities Hussain, M. F., and Joshi, S. B.: Job-shop scheduling—using component packing and simulated annealing approach Hwang, H., see Moon, S. W Ioannou, G., and Sullivan, W. G.: Use of activity-based costing and economic value analysis for the justification of capital investments in automated material handling systems Ip, W. H., see Ng, J. K. € Irani, S. A., see Daita, S. T. S Jayakrishnan Nair, G., and Narendran, T. T.: ACCORD: a bicriterion algorithm for cell formation using ordinal and ratio-level data Jayaram, J., see Handfield, R Jeang, A.: Optimal tolerance design by response surface methodology Jeang, A., and Leu, E.: Robust tolerance design by computer experiment Jeong, H.-I., Park, J.. and Leachman, R. ¢ \ batch splitting method for a job shop scheduling problem in an MRP environment An algebraic approach for dimensional chain identification in process planning J.. Zhang, W., Zhao, Z., and Cha, J.: An integrated intelligent approach to process diagnosis in process industries Jorjani, S., Scott, C. H., and Woodruff, D. L.: Selection of an optimal subset of sizes Joseph, I. N., Rajendran, C., and Kamalanabhan, T. J.: An instrument for measuring total quality management implementation in manufacturing-based business units in India Joshi, M. P., see Kathuria, R Joshi, S. B., see Hussain, M. | Ju, J. H., see Park, S Kamalanabhan, T. J., see Joseph, I. N Kamalanabhan, T. J., see Nelson Joseph, I Kao, H r.. see Chan, | K 4294 Index of authors (with titles Kaparthi, S., see Suresh, N. ¢ Karwan, M., see Oboth, € Karwan, M. H., see Narasimhan, R Kathuria, R., Porth, S. J.. and Joshi, M. P.: Manufacturing priorities: do general managers and manufacturing managers agree? Kenne, J. P., and Gharbi, A.: Experimental design in production and maintenance control problem of a single machine, single product manufacturing system Kerry, H. T., Jr, see Rozenfeld, H Khouja, M.: A note on ‘deliberately slowing output in a family production context’ Khouja, M. J., and Kumar, R. L.: An options view of robot performance parameters in a dynamic environment Kim, C. W., Tanchoco, J. M. A., and Koo, P.-H.: AGV dispatching based on workload balancing Kim, K.-H., and Egbelu, P. J.: Scheduling in a production environment with multiple process plans per job Klein, C. M., see McKendall, A. R., Ji Klein, R., see Scholl, A Klompmaker, J. E., see Berry, W. | Knight, W. A., see Sodhi, M.S Kochhar, J. S., and Heragu, S. S.: Facility layout design in a changing environment Koltai, 7 see Guerrero, I Koo, P.-H., and Tanchoco, J. M. A.: Real-time operation and tool selection in single stage multimachine systems Koo, P.-H., see Kim, C. W Kotamraju, S., see Daita, S. T. S Krajewski, L. J.. see McCreery. J. K Krothapalli, N. K. C., and Deshmukh, A. V.: Design of negotiation protocols for multi-agent manufacturing systems 1601 Kruth, J.-P., see Duflou, J. R Kumar, A. S., see Tao, Z. J Kumar, R. L., see Khouja, M. J Kumar, S.. Shanker, K., and Lal, G. K.: A feature recognition methodology fo1 extrudable product shapes Kung, H.-W., see Tseng, Y.-J Kunica, Z., and Vranje’, B.: Towards automatic generation of plans for automated assembly Kutanoglu, E., and Sabuncuoglu, I.: An analysis of heuristics in a dynamic job shop with weighted tardiness objectives Kuula, M., Stam, A., Leino, S., Ranta, J., and Wallenius, J.: Workload balancing in the manufacturing environment: a multicriteria trade-off analysis al, G. K., see Kumar, S am, F. S. C., Lin, B. C., Sriskandrarajah, C., and Yan, H.: Scheduling to minimize product design time using a genetic algorithm Larraneta, J., see Guerrero, F Lartigue, C., see Thiebaut, F Law, J. S., see Yeung, J. H. Y Lawley, M., and Mittenthal, J.: Order release and deadlock avoidance interactions in counter-flow system optimization Lawrence, P., see Bateman, N Le Bihan, H., see Dallery, Y Leachman, R. C., see Hung, Y.-F Leachman, R. C., see Jeong, H.-I Lee, A. C., see Tanchoco, J. M. A Lee, C.-Y., and Uzsoy, R.: Minimizing makespan on a single batch processing machine with dynamic job arrivals Ind Y of authors with ities Lee, H.-S., Frein, Y., and Duri, C.: Performance evaluation of a flow line system with Bernoulli sampling inspections J., and Maneesavet, R.: Dispatching rail-guided vehicles at 1d scheduling jobs in a flexible manufacturing system ee, M. K., see Hong, S. H ce, T. C., see Ne, J. K. ¢ ee, Y.-H., Tanchoco, J. M. A., and Chun, S. J.: Performance estimation models for AS/RS with unequal sized cells ee, Y. H., Yang, B. H., and Moon, K. S.: An economic machining process model1) using fuzzy non-linear programming and neural network ehtihet, E. A., see Fraticelli, B. M. P ehtihet, E. A.. see Oyeleye, O ehtihet, E. A., see Wheeler, D. | eino, S., see Kuula, M eng. G K., see Ang Cheng-l Comparative analysis order-input sequencin le assembly system for large products Jeang, A a, W., and Rong xturing surface accessibility analysi i1utomated fixture design R.-K., see Huang, ¢ i, R.-¥ ee Tseng, T.-¥ iang, M., see Zolfaghari,. S imaiem, A., and Elmaragl Planning systen see Lam, F. S. (¢ ee Chen, S.-J. (Gary) and Macé¢ arthy. B | Ger eral n istic procedu FMS scheduling C.-C.: Cutter path preview for contour machining base Ot { Mouo‘ Nn e=r ror sources. ozano, S., Guerrero, F., Eguia, !.. and Onieva, | presence of alternative routing Lozano, S.. see Guerrero, F Luczak, H., and Mjema, E.: A quantitative analysis of capacity requirement in maintenance department Lundgren, N. H., see Askin, R. G Luo, J.. see Zhang, ¢ Luong, L. H. S.. see Gupta, J. N. D Ma, L., see Yeung, J. H. Ma, W.. see Li, J MacCarthy, B. L., see Liu, J Macchiaroli, R., Mole, S., and Riemma, S.: Modelling and optimization of industrial manufacturing processes subject to no-wait constraints Macedo, J.: A generative system for re-engineering manufacturit ig system organization Maimon, O. Z., see Ben-Gal, I Maiocco, M., see Brandimarte, P Malmborg, C. J.: Empirical approximation of volume d]i stance ddii stributions for line layout problems Maneesavet, R., see Lee, J Marsh, R. F., Shafer, S. M., and Meredith. J. R A comparison of cellular manufacturing research presumptions with practice Martel, A., see Ouenniche, J Matsui, M., Yang, G., and Miya, T.: Optimal control of a job-shop production system with order-selection and switch-ovet 4296 Index of authors (with title Maturana, F., Shen, W., and Norrie, D. H.: MetaMorph: an adaptive agent-based architecture for intelligent manufacturing Mayer, J. R. R., see Phan, A.-V McCreery, J. K., and Krajewski, L. J.: Improving performance using workforce flexibility in an assembly environment with learning and forgetting effects McGinnis, L., see Chen, M.-T. (Mark) McKay K. N., see O'Donovan, R McKendall, A. R., Jr, Noble, J. S.. and Klein, C. M Facility layout of irregular- shaped departments using a nested approach Meade, L. M., and Sarkis, J.: Analyzing organizational project alternatives for agile manufacturing processes: an analytical network approach Meeran, S., see Zulkifli, A. H Meller, R. D., see Gau, K.- Meredith, J. R., see Marsh, R. fF Merengo, C., Nava, F., and Pozzetti, A.: Balancing and sequencing manual mixed- model assembly lines Middleton, D.: Technical note: Stochastic flowshop makespan simplifications Midha, P. S., see Smith, L. N Mittenthal, J., see Lawley, M Miya, T., see Matsui, M Mijema, E., see Luczak, H Mole, S., see Macchiaroli, R Molleman, E., and Slomp, J.: Functional flexibility and team performance Mondal, S., see Sarker, B. R Montreuil, B., Venkatadri, U., and Rardin, R. I Fractal layout organization for job shop environments Moodie, D. R., and Bobrowski, P. M.: Due date demand management: negotiating the trade-off between price and delivery Moon, K. S.. see Lee, Y. H Moon, S. W., and Hwang, H.: Determination of unit load sizes of AGV in multi- product multi-line assembly production systems Moore, K. E., and Gupta, S. M.: Stochastic coloured Petri net (SCPN) models of traditional and flexible kanban systems Moskowitz, H., Plante, R., and Duffy, J.: The partial information case for multivariate tolerance design using scrap or rework costs akamura, N., see Takahashi, K arasimhan, R., Batta, R., and Karwan, M. H.: Routing automated guided vehicles in the presence of interruptions arayanan Namboothiri, V. N., and Shunmugam, M. S.: On determination of sample size in form error evaluation using coordinate metrology Nare, A., see Choobineh, F Narendran, T. T., see Bhaskara Reddy, S. \ Narendran, T. T., see Jayakrishnan Nair, G Nassimbeni, G., see De Toni, A Nava, F., see Merengo, ¢ Nee, A. Y. C., see Tao, Z. J Nelson Joseph, I., Rajendran, C., Kamalanabhan, T. J.. and Anantharaman, R. N Organizational factors and total quality management—an empirical study Ng A.. see Chan, L. K Ng, J. K. C., Ip, W. H., and Lee, T. C.: A paradigm for ERP and BPR integration Ngoi, B. K. A., and Ong, J. M.: A complete tolerance charting system in assembly Nguyen, V. H., see Gupta, J. N. D Nickerson, J. A., and Sloan, T. W.: Data reduction techniques and hypothesis testing for analysis of benchmarking data Nihtila, J., see Hameri, A.-P Noble, J. S., see Chittratanawat, S Noble, J. S., see McKendall, A. R., Jr Index of authors (with titles Norrie, D. H., see Maturana, I North, W. P. T.. see Basu, S Oboth, C., Batta, R., and Karwan, M.: Dynamic conflict-free routing of automated guided vehicles O'Donovan, R., Uzsoy, R., and McKay. K. N Predictable scheduling of a single machine with breakdowns and sensitive jobs Ohta, H., see Asano, M Okogbaa, O. G., see Pontrandolfo, P Ong, J. M., see Ngoi, B. K. A Onieva, L., see Lozano, S Osman, I., see Pesch, I Ostafiev, V. A., and Djordjevich, A.: Machining precision augmented by sensors QOuenniche, J., Boctor, F. F., and Martel, A.: The impact of sequencing decisions or multi-item lot sizing and scheduling in flow shops Ou-Yang, C., and Shieh, C. M.: Developing a Petri-net-b ased simulation model for a modified hierarchical shop floor control framework Oyeleye, O., and Lehtihet, E. A.: Automatic visual inspection of surface mount solder joint defects Ozdamar, L., and Yazgag, T.: A hierarchical planning approach fot a production- distribution system Padillo, J. M., and Diaby, M.: A multiple-criteria decision methodology for the make- or-buy problem Pande, S. S., see Prabhu, B.S Park, J.. see Jeong, H.-1 Park, S.. Chang, M., and Ju, J. H.: Tool path generation | or five-axis machining of impellers Pepper, K., see Waterson, P. FE Pesch, E., Glover, F., Bartsch, T., Salewski, F., and Osman, | fficient facility layout planning in a maximally planar graph model Peters, B. A.. see Smith, J. S Petersen, C. G., see Vaughan, T. S Petroni, A., see Braglia, M Pham, S. N., see Rao, H. A Phan, A.-V., Cloutier, G., and Mayer, J. R. R.: A finite-ele nent model with closed- form solutions to workpiece deflections in turning Pheng, K. L., see Ang, C.-I Pheng, K. L, Ang, C. L., and Zhang, J.: An IDEFO model-ba diagnosis system for manufacturing systems Phillips, P. J.. see Fu, J. € Plante, R., see Moskowitz, H Pontrandolfo, P.. and Okogbaa, O. G.: Global manuf framework for planning in a global corporation Popplewell, K., see Balogun, O. O Popplewell, K., see Harding, J. A Porth, S. J.. see Kathuria, R Pozzetti, A.. see Merengo ( Prabhu, B. S., and Pande, S. S Automatic extraction of manufacturable features from CADD models using syntactic pattern recognition techniques Price, D. H. R., see Halsall, D. N Qiao, H., and Tso, S. K.: Three-step precise robotic peg—hole insertion operation with symmetric regular polyhedral objects 4298 Index of authors (with titles Rajagopal, K., and Anand, S.: Assessment of circularity error using a selective data partition approach Rajendran, C.: Formulations and heuristics for scheduling in a Kanban flowshop to minimize the sum of weighted flowtime, weighted tardiness and weighted ear- liness of containers Rajendran, C., see Joseph, 1. N Rajendran, C., see Nelson Joseph, | Raman,S ., see Aekambaram, R Ramesh Babu, A., and Ramesh Babu, N.: Effective nesting of rectangular parts in multiple rectangular sheets using genetic and heuristic algorithms Ramesh Babu, N., see Ramesh Babu, A Ramesh, R., see Aldakhilallah, K. A Ranta, J.. see Kuula, M Rao, H. A., Pham, S. N., and Gu, P.: A genetic algorithms-based approach for design of manufacturing systems: an industrial application Rao, K. P., see ¢ heng, S.K Raouf, A., see Sheikh, A. K Rardin, R. L., see Montreuil, B Rehn, J., see Hameri, A.-P Riemma, S., see Macchiaroli, R Rohleder, T. R., see Silver, I \ Romano, D., see Franceschini, F Rong, Y., see Li, J Rozenfeld, H., and Kerry, H . Jr: Automated process planning for parametric parts 398] Saad, S. M., see Gindy, N. N Sabuncuoglu, I., see Kutanoglu, F Saiz. M., see Siier, G. A Salewski, F., see Pesch, I Salvendy, G., see Duffy, V. G Salvendy, G., see Hamamoto, S$ Salvendy, G., see Wu, N Sanghi, D., see Veeramani, D Sarker, B. R., and Mondal, S.: Grouping efficiency measures in cellular manufactur- ing: a survey and critical review Sarkis, J., and Talluri, S.: A decision model for evaluation of flexible manufacturing systems in the presence of both cardinal and ordinal factors Sarkis, J., see Meade, L. M Sassine, C., see Simeu-Abazi, Z Sayeed, Q. A., and de Meter, E. C.: Compliance based MIP model and heuristic for support layout optimization Scholl, A., and Klein, R.: ULINO: Optimally balancing U-shaped JIT assembly lines Scott, C. H., see Jorjani, $ Seifoddini, H., and Tjahjana, B.: Part-family formation for cellular manufacturing: a case study at Harnischfeger Sekerdey, { A.. see Sheikh, A. K Sekiguchi, T., see Yu, I Senthil Kumar, A., see Tao, Z. J Sha, D. Y., see Chen, C.-W Shafaei, R., and Brunn, P.: Workshop scheduling using practical (inaccurate) data Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach Shafaei, R., and Brunn, P.: Workshop scheduling using practical (inaccurate) data Part 2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environment Shafer, S. M., see Marsh, R. I

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.