ebook img

International Journal of Production Economics 2005: Vol 97 Index PDF

2005·0.68 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview International Journal of Production Economics 2005: Vol 97 Index

international journal of production economics EV IER Int. J. Production Economics 97 (2005) 355—357 www.elsevier.com/locate/ijpe Author Index to Volume 97 Abdel-Malek, L., T. Kullpattaranirun and S. Nanthavani, A framework for comparing outsourcing strategies in multi-layered supply chains 97 (2005) 318 Abdel-Malek, L.L. and R. Montanari, An analysis of the multi-product newsboy problem with a budget constraint 97 (2005) 296 Aissani, D., see Rabta, B. 97 (2005) 159 Becker, C., see Scholl, A. 97 (2005) 343 Bergstr6m, M. and L. Stehn, Matching industrialised timber frame housing needs and enterprise resource planning: A change process 97 (2005) 172 Boulton, W.R., see Xue, Y. 97 (2005) 279 Canel, C., see Das, S.R. 97 (2005) 247 Canel, C., see Kenyon, G. 97 (2005) 263 Chang, C.-T., see Teng, J.-T. 97 (2005) 121 Chang, P.-L., Y.-C. Chou and M.-G. Huang, A (r,r, Q) inventory model for spare parts involving equipment criticality 97 (2005) 66 Chang, S.K.J., J.P.C. Chuang and H.-J. Chen, Short comments on technical note—The EOQ and EPQ models with shortages derived without derivatives 97 (2005) 241 Chauhan, S.S. and J.-M. Proth, Analysis of a supply chain partnership with revenue sharing 97 (2005) 44 Chen, H.-J., see Chang, S.K.J. 97 (2005) 241 Choi, B., see Hwang, H. 97 (2005) 185 Chou, Y.-C., see Chang, P.-L. 97 (2005) 66 Chuang, J.P.C., see Chang, S.K.J. 97 (2005) 241 Colmer, S., see Roy, R. 97 (2005) 210 Das, S.R. and C. Canel, An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system 97 (2005) 247 de Koster, R., see Mostard, J. 97 (2005) 329 Demeulemeester, E., see Van de Vonder, S. 97 (2005) 227 Demircan, M.L., see Tolga, E. 97 (2005) 89 Fatemi Ghomi, S.M.T., see Torabi, S.A. 97 (2005) 52 Gerchak, Y., see Ray, S. 97 (2005) 143 Goyal, S.K., see Teng, J.-T. 97 (2005) 121 Griggs, T., see Roy, R. 97 (2005) 210 Hai, H.L., see Liu, F.-H.F. 97 (2005) 308 Haksever, C. and J. Moussourakis, A model for optimizing multi-product inventory systems with multiple constraints 97 (2005) 18 doi: 10.1016/S0925-5273(05)00121-0 356 Author Index to Volume 97 Hayya, J.C., see He, X.J. 97 (2005) 130 He, X.J., J.G. Kim and J.C. Hayya, The cost of lead-time variability: The case of the exponential distribution 97 (2005) 130 Herroelen, W., see Van de Vonder, S. 97 (2005) 227 Hu, J., E. Watson and H. Schneider, Approximate solutions for multi-location inventory systems 97 (2005) 31 with transshipments 97 (2005) 66 Huang, M.-G., see Chang, P.-L. Hwang, H., B. Choi and M.-J. Lee, A model for shelf space allocation and inventory control considering location and inventory level effects on demand 97 (2005) 185 Jewkes, E.M., see Ray, S. 97 (2005) 143 Kahraman, C., see Tolga, E. 97 (2005) 89 Karimi, B., see Torabi, S.A. 97 (2005) 52 Kenyon, G., C. Canel and B.D. Neureuther, The impact of lot-sizing on net profits and cycle times in the n-job, m-machine job shop with both discrete and batch processing 97 (2005) 263 Kim, J.G., see He, X.J. 97 (2005) 130 Kullpattaranirun, T., see Abdel-Malek, L. 97 (2005) 318 97 (2005) 185 Lee, M.-J., see Hwang, H. 97 (2005) 227 Leus, R., see Van de Vonder, S. 97 (2005) 279 Liang, H., see Xue, Y. 97 (2005) 308 Liu, F.-H.F. and H.L. Hai, The voting analytic hierarchy process method for selecting supplier 97 (2005) 196 Liu, J.J., see Yao, D.-Q. Melachrinoudis, E., A. Messac and H. Min, Consolidating a warehouse network: A physical 97 (2005) 1 programming approach 97 (2005) 1 Messac, A., see Melachrinoudis, E. 97 (2005) 1 Min, H., see Melachrinoudis, E. 97 (2005) 296 Montanari, R., see Abdel-Malek, L.L. Mostard, J., R. de Koster and R. Teunter, The distribution-free newsboy problem with resalable 97 (20053)2 9 returns 97 (2005) 18 Moussourakis, J., see Haksever, C. 97 (2005) 318 Nanthavanij, S., see Abdel-Malek, L. 97 (2005) 263 Neureuther, B.D., see Kenyon, G. Parola, F. and A. Sciomachen, Intermodal container flows in a port system network: 97 (2005) 75 Proth, J.-M., see Chauhan, S:S. 97 (2005) 44 Rabta, B. and D. Aissani, Strong stability in an (R, s, S) inventory model 97 (2005) 159 Ray, S., Y. Gerchak and E.M. Jewkes, Joint pricing and inventory policies for make-to-stock products with deterministic price-sensitive demand 97 (2005) 143 Roy, R., S. Colmer and T. Griggs, Estimating the cost of a new technology intensive automotive product: A case study approach 97 (2005) 210 Schneider, H., see Hu, J. 97 (2005) 31 Scholl, A. and C. Becker, A note on “An exact method for cost-oriented assembly line balancing” 97 (2005) 343 Sciomachen, A., see Parola, F. 97 (2005) 75 Snyder, C.A., see Xue, Y. 97 (2005) 279 Stehn, L., see Bergstrém, M. 97 (2005) 172 Author Index to Volume 97 Teng, J.-T., C.-T. Chang and S.K. Goyal, Optimal pricing and ordering policy under permissible delay in payments 97 (2005) 121 Teunter, R., see Mostard, J. 97 (2005) 329 Tolga, E., M.L. Demircan and C. Kahraman, Operating system selection using fuzzy replacement analysis and analytic hierarchy process 97 (2005) 89 Torabi, S.A., B. Karimi and S.M.T. Fatemi Ghomi, The common cycle economic lot scheduling 97 (2005) 52 in flexible job shops: The finite horizon case Van de Vonder, S., E. Demeulemeester, W. Herroelen and R. Leus, The use of buffers in project 97 (20052)2 7 management: The trade-off between stability and makespan 97 (20051)9 6 Wang, X., see Yao, D.-Q. 97 (2005) 31 Watson, E., see Hu, J. Xue, Y., H. Liang, W.R. Boulton and C.A. Snyder, ERP implementation failures in China: Case studies with implications for ERP vendors 97 (2005) 279 Yao, D.-Q., X. Yue, X. Wang and J.J. Liu, The impact of information sharing on a returns policy 97 (20051)9 6 with the addition of a direct channel 97 (20051)9 6 Yue, X., see Yao, D.-Q.

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.