ebook img

International Journal of Production Economics 2000: Vol 64 Index PDF

3 Pages·2000·0.72 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview International Journal of Production Economics 2000: Vol 64 Index

international journal of production VR economics ELSnEa ‘VoeI "E) R Int. J. Production Economics 64 (2000) 419-421 www.elsevier.com/locate/dsw Author Index to Volume 64 Aghezzaf, E.-H., Lot-sizing problem with setup times in labor-based capacity production systems 64 (2000) 1 Ait-Kadi, D., see Chelbi, A. 64 (2000) 379 Amen, M., An exact method for cost-oriented assembly line balancing 64 (2000) 187 Ameziane, F., An information system for building production management 64 (2000) 345 Artiba, A. and A. Guinet, Strategy, policy and tactics in productive systems 64 (2000) xi Bahroun, Z., J.-P. Campagne and M. Moalla, The overlapping production planning: A new approach of bounded capacity management 64 (2000) 21 Banerjee, S.K., Developing manufacturing management strategies: Influence of technology and other issues 64 (2000) 79 Bataille, R., see Massotte, P. 64 (2000) 359 Beach, R., A.P. Muhlemann, D.H.R. Price, A. Paterson and J.A. Sharp, The selection of information systems for production management: An evolving problem 64 (2000) 319 Bertrand, J.W.M. and H.P.G. van Ooijen, Customer order lead times for production based on lead time and tardiness costs 64 (2000) 257 Bititci, U.S., see Suwignjo, P. 64 (2000) 231 Botta-Genoulaz, V., Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness 64 (2000) 101 Bruniaux, R., see Caux, C. 64 (2000) 279 Campagne, J.-P., see Bahroun, Z. 64 (2000) 21 Carrie, A.S., see Suwignjo, P. 64 (2000) 231 Caux, C., R. Bruniaux and H. Pierreval, Cell formation with alternative process plans and machine capacity constraints: A new combined approach 64 (2000) 279 Chelbi, A. and D. Ait-Kadi, Generalized inspection strategy for randomly failing systems subjected to random shocks 64 (2000) 379 Croci, F., M. Perona and A. Pozzetti, Work-force management in automated assembly systems 64 (2000) 243 Devise, O. and H. Pierreval, Indicators for measuring performances of morphology and material handling systems in flexible manufacturing systems 64 (2000) 209 Dhaenens-Flipo, C., Spatial decomposition for a multi-facility production and distribution problem 64 (2000) 177 Djellab, H., K. Djellab and M. Gourgand, A new heuristic based on a hypergraph representation for the tool switching problem 64 (2000) 165 Djellab, K., see Djellab, H. 64 (2000) 165 Ducateau, C.F., see Gargouri, F. 64 (2000) 331 Duri, C., Y. Frein and H.-S. Lee, Performance evaluation and design of a CONWIP system with inspections 64 (2000) 219 Dussauchoy, A., see Gertosio, C. 64 (2000) 285 Elmaghraby, S.E., A.A. Ferreira and L.V. Tavares, Optimal start times under stochastic activity durations 64 (2000) 153 0925-5273/00/$-see front matter © 2000 Elsevier Science B.V. All rights reserved. 420 Author Index to Volume 64 Ferreira, A.A., see Elmaghraby, S.E. 64 (2000) 153 Filip, F.-G., see Resteanu, C. 64 (2000) 65 Fontanili, F., A. Vincent and R. Ponsonnet, Flow simulation and genetic algorithm as optimization tools 64 (2000) 91 Frein, Y., see Duri, C. 64 (2000) 219 Gargouri, F., N. Haddar, C.F. Ducateau and W. Gargouri, An integrated modelling approach for complex applications and distributed information systems 64 (2000) 331 Gargouri, W., see Gargouri, F. 64 (2000) 331 Gertosio, C., N. Mebarki and A. Dussauchoy, Modeling and simulation of the control framework on a flexible manufacturing system 64 (2000) 285 Gourgand, M., see Djellab, H. 64 (2000) 165 Guinet, A., see Artiba, A. 64 (2000) xi Haddar, N., see Gargouri, F. 64 (2000) 331 Herder, P.M. and M.P.C. Weijnen, A concurrent engineering approach to chemical process design 64 (2000) 311 Ionescu, C., see Resteanu, C. 64 (2000) 65 Jaber, M.Y., see Salameh, M.K. 64 (2000) 59 Jeunet, J. and N. Jonard, Measuring the performance of lot-sizing techniques in uncertain environ- ments 64 (2000) 197 Jonard, N., see Jeunet, J. 64 (2000) 197 Klomp, C., J. van de Klundert, F.C.R. Spieksma and S. Voogt, The feeder rack assignment problem in PCB assembly: A case study 64 (2000) 399 Kolisch, R., Integrated scheduling, assembly area- and part-assignment for large-scale, make-to-order assemblies 64 (2000) 127 Kovacs, G.L., see Mezgar, I. 64 (2000) 37 Lamouri, S. and A. Thomas, The two level master production schedule and planning bills in a just in time MRP context 64 (2000) 409 Lee, H.-S., see Duri, C. 64 (2000) 219 Li, H.-L., see Yu, C.-S. 64 (2000) 385 Massotte, P. and R. Bataille, Future production systems: Influence of self-organization on approaches to quality engineering 64 (2000) 359 Mebarki, N., see Gertosio, C. 64 (2000) 285 Mezgar, I., G.L. Kovacs and P. Paganelli, Co-operative production planning for small- and medium- sized enterprises 64 (2000) 37 Moalla, M., see Bahroun, Z. 64 (2000) 21 Moursli, O. and Y. Pochet, A branch-and-bound algorithm for the hybrid flowshop 64 (2000) 113 Muhlemann, A.P., see Beach, R. 64 (2000) 319 Paganelli, P., see Mezgar, I. 64 (2000) 37 Paterson, A., see Beach, R. 64 (2000) 319 Perona, M., see Croci, F. 64 (2000) 243 Pierreval, H., see Caux, C. 64 (2000) 279 Pierreval, H., see Devise, O. 64 (2000) 209 Pierreval, H., see Plaquin, M.-F. 64 (2000) 267 Plaquin, M.-F. and H. Pierreval, Cell formation using evolutionary algorithms with certain con- straints 64 (2000) 267 Pochet, Y., see Moursli, O. 64 (2000) 113 Ponsonnet, R., see Fontanili, F. 64 (2000) 91 Pozzetti, A., see Croci, F. 64 (2000) 243 Price, D.H.R., see Beach, R. 64 (2000) 319 Proust, C., see Richard, P. 64 (2000) 11 Author Index to Volume 64 Resteanu, C., F.-.G. Filip, S. Stanescu and C. Ionescu, A cooperative production planning method in the field of continuous process plants 64 (2000) 65 Richard, P. and C. Proust, Maximizing benefits in short-term planning in bottle-glass industry 64 (2000) 11 Salameh, M.K. and M.Y. Jaber, Economic production quantity model for items with imperfect quality 64 (2000) 59 Sawik, T., An LP-based approach for loading and routing in a flexible assembly line 64 (2000) 49 Sharp, J.A., see Beach, R. 64 (2000) 319 Spieksma, F.C.R., see Klomp, C. 64 (2000) 399 Stanescu, S., see Resteanu, C. 64 (2000) 65 Suliman, S.M.A., A two-phase heuristic approach to the permutation flow-shop scheduling problem 64 (2000) 143 Suwignjo, P., U.S. Bititci and A.S. Carrie, Quantitative models for performance measurement system 64 (2000) 231 Tavares, L.V., see Elmaghraby, S.E. 64 (2000) 153 Thomas, A., see Lamouri, S. 64 (2000) 409 van de Klundert, J., see Klomp, C. 64 (2000) 399 Van Landeghem, R., Experiences with a concurrent engineering self-assessment tool 64 (2000) 295 van Ooijen, H.P.G., see Bertrand, J.W.M. 64 (2000) 257 Vincent, A., see Fontanili, F. 64 (2000) 91 Voogt, S., see Klomp, C. 64 (2000) 399 Weijnen, M.P.C., see Herder, P.M. 64 (2000) 311 Yu, C.-S. and H.-L. Li, A robust optimization model for stochastic logistic problems 64 (2000) 385

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.