ebook img

Florida Int'l Solar Decathlon 2011 Project Manual PDF

369 Pages·2011·24.9 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Florida Int'l Solar Decathlon 2011 Project Manual

PROJECT MANUAL  U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011           BRINGING SOLAR TO THE SUNSHINE STATE!                   FLORIDA INTERNATIONAL UNIVERSITY    School of Architecture  Modesto A. Maidique Campus   11200 SW 8th Street PCA 386 A  Miami, Florida, 33199, USA  Prof. Marilys Nepomechie, FAIA  [email protected]  Tel. 305.348.1887   Fax. 305.348.2650   Project Manual . Deliverables Team Florida International University . Aug 11, 2011 FLORIDA INTERNATIONAL UNIVERSITY,  Modesto A. Maidique Campus , School of Architecture  11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA  Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887          Table of Contents Table of Contents .......................................................................................................................................................................... 2  Summary of Changes ..................................................................................................................................................................... 4  [01/11/2011] Revision 1 ........................................................................................................................................................................ 4  [03/22/2011] Revision 2 ........................................................................................................................................................................ 4  [05/02/2011] Revision 3 ........................................................................................................................................................................ 4  [08/11/2011] Revision 4 ........................................................................................................................................................................ 4  Rules Compliance Checklist ........................................................................................................................................................... 5  Detailed Water Budget .................................................................................................................................................................. 8  Summary of Unlisted Electrical Components ................................................................................................................................ 10  Summary of Reconfigurable Features .......................................................................................................................................... 11  Interconnection Application Form for Solar Decathlon 2011 ........................................................................................................ 12  Energy Analysis Results and Discussion ........................................................................................................................................ 13  Construction Specifications ......................................................................................................................................................... 20  Division 01 ‐ General Requirements ................................................................................................................................................ 41  Division 04 – Masonry……………………………………………………………………………………………………………………………………….………………..…….49  Division 05 – Metals ........................................................................................................................................................................ 21  Division 06 – Wood, Plastics, and Composites ................................................................................................................................ 40  Division 07 – Thermal and Moisture Protection ............................................................................................................................. 93  Division 08 – Openings .................................................................................................................................................................. 175  Division 09 – Finishes .................................................................................................................................................................... 196  Division 10 – Specialties ................................................................................................................................................................ 213  Division 11 – Equipment ............................................................................................................................................................... 230  Division 12 – Furnishings ............................................................................................................................................................... 239  Division 22 – Plumbing .................................................................................................................................................................. 253  Division 26 – Electrical. ................................................................................................................................................................. 326  Division 28 – Electronic  Safety and Security. ............................................................................................................................... 326  Division 31 – Earthwork…………………………………………..………………………………………………………..…………………………………………………….331  Division 32 – Exterior Improvements……………………………………………………………………………………………………………………………………….326  Division 33 – Utilities……………………………………………………………………………………………………………………………………………………………….326  Division 41 – Material Processing and Handling Equipment ......................................................................................................... 362  Division 48 – Electrical Power Generation .................................................................................................................................... 368      Revision 4    Published 03/22/2011  U.S. D.O.E. Solar Decathlon 2011   Page  ‐ 2 FLORIDA INTERNATIONAL UNIVERSITY,  Modesto A. Maidique Campus , School of Architecture  11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA  Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887                Revision 4    Published 03/22/2011  U.S. D.O.E. Solar Decathlon 2011   Page  ‐ 3 FLORIDA INTERNATIONAL UNIVERSITY,  Modesto A. Maidique Campus , School of Architecture  11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA  Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887          Summary of Changes   Significant changes to the project manual that have occurred between submissions have been outlined below. The  Construction Drawings should also be reviewed for relevant revisions.  [01/11/2011] Revision 1 The Project Manual has been updated from the previous issue. Revisions include:   Complete update of all contents within manual  03/22/2011] Revision 2 The Project Manual has been updated from the previous issue. Revisions include:   Complete update of all contents within manual  05/2/2011] Revision 3 The Project Manual has been updated from the previous issue. Revisions include:   Complete update of all contents within manual  08/11/2011] Revision 4 The Project Manual has been updated from the previous issue. Revisions include:   Final submission               Revision 4    Published 03/22/2011  U.S. D.O.E. Solar Decathlon 2011   Page  ‐ 4 FLORIDA INTERNATIONAL UNIVERSITY,  Modesto A. Maidique Campus , School of Architecture  11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA  Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887          Rules Compliance Checklist RULE  RULE DESCRIPTION  LOCATION DESCRIPTION  LOCATION  Drawing(s) showing the assembly and disassembly  sequences and the movement of heavy machinery on  Rule 4‐2  Construction Equipment  the competition site   0 Sheets  Rule 4‐2  Construction Equipment  Specifications for heavy machinery   0‐602 ,0‐603  Drawing(s) showing the locations and depths of all  Rule 4‐3  Ground Penetration  ground penetrations on the competition site   E‐501  Drawing(s) showing the location, contact area, and  soil‐bearing pressure of every component resting  Rule 4‐4  Impact on the Turf  directly on the turf   S‐101, S‐111  Rule 4‐5  Generators  Specifications for generators   Spec 41 65 16  Drawing(s) showing the locations of all equipment,  containers, and pipes that will contain liquids at any  Rule 4‐6  Spill Containment  point during the event   P‐101, P‐104   Specifications for all equipment, containers, and pipes  Rule 4‐6  Spill Containment  that will contain fluids at any point during the event   Spec 22 11 16  Calculations showing that the structural design  remains compliant even if 18 in. (45.7 cm) of vertical  Rule 4‐7  Lot Conditions  elevation change exists   S‐501  Drawing(s) showing shimming methods and materials  to be used if 18 in. (45.7 cm) of vertical elevation  Rule 4‐7  Lot Conditions  change exists on the lot   S‐501  Drawing(s) showing the location of all house and site  Rule 5‐2  Solar Envelope Dimensions  components relative to the solar envelope   G‐201, G‐202  List of solar envelope exemption requests  Rule 5‐2  Solar Envelope Dimensions  accompanied by justifications and drawing references   N/A  List of, or marking on, all drawing and project manual  sheets that have been or will be stamped by the  qualified, licensed design professional in the stamped  structural submission; the stamped submission shall  consist entirely of sheets that also appear in the  Rule 6‐1  Structural Design Approval  drawings and project manual   S‐001 – S 523  Drawing(s) showing all information needed by the  rules officials to measure the finished square footage  Rule 6‐2  Finished Square Footage  electronically   G‐101    Revision 4    Published 03/22/2011  U.S. D.O.E. Solar Decathlon 2011   Page  ‐ 5 FLORIDA INTERNATIONAL UNIVERSITY,  Modesto A. Maidique Campus , School of Architecture  11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA  Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887          Drawing(s) showing all movable components that may  increase the finished square footage if operated  Rule 6‐2  Finished Square Footage  during contest week   N/A  Drawing(s) showing the accessible public tour route  and the ground surface area that will be covered by  Rule 6‐3  Entrance and Exit Routes  organizer‐provided walkway material   G‐103  Drawing(s) showing the location of all vegetation and,  if applicable, the movement of vegetation designed as  Rule 7‐1  Placement  part of an integrated mobile system   L‐101  Drawing(s) showing the layout and operation of grey  Rule 7‐2  Watering Restrictions  water irrigation systems   N/A  Rule 8‐1  PV Technology Limitations  Specifications for photovoltaic components  Spec 26 31 00  Drawing(s) showing the location(s) and quantity of all  primary and secondary batteries and stand‐alone, PV‐ Rule 8‐3  Batteries  powered devices   L‐101  Specifications for all primary and secondary batteries  Rule 8‐3  Batteries  and stand‐alone, PV‐powered devices   L‐101  Drawing(s) describing the operation of the desiccant  Rule 8‐4  Desiccant Systems  system   N/A  Rule 8‐4  Desiccant Systems  Specifications for desiccant system components   N/A  Drawing(s) showing the locations of the photovoltaics,  inverter(s), terminal box, meter housing, service     Rule 8‐5  Village Grid  equipment, and grounding means  E201 – E501  Spec 26 05 26,   Specifications for the photovoltaics, inverter(s),  48 19 16,   terminal box, meter housing, service equipment, and  26 24 16,   Rule 8‐5  Village Grid  grounding means  26 27 13,  Rule 8‐5  Village Grid  One‐line electrical diagram   E‐601  Calculation of service/feeder net computed load per  Rule 8‐5  Village Grid  NEC 220   E‐603  Site plan showing the house, decks, ramps, tour  Rule 8‐5  Village Grid  paths, and terminal box   G‐103  Elevation(s) showing the meter housing, main utility  Rule 8‐5  Village Grid  disconnect, and other service equipment  M‐201  Drawing(s) showing the location of all liquid  Rule 9‐1  Container Locations  containers relative to the finished square footage   L‐102  Drawing(s) demonstrating that the primary supply  water tank(s) is fully shaded from direct solar  radiation between 9 a.m. and 5 p.m. EDT or between  Rule 9‐1  Container Locations  8 a.m. and 4 p.m. solar time on October 1   S‐521    Revision 4    Published 03/22/2011  U.S. D.O.E. Solar Decathlon 2011   Page  ‐ 6 FLORIDA INTERNATIONAL UNIVERSITY,  Modesto A. Maidique Campus , School of Architecture  11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA  Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887          Quantity, specifications , and delivery date(s) of all team-provided liquids for irrigation, thermal mass, hydronic system pressure testing, and thermodynamic Rule 9‐2  Team‐Provided Liquids  system operation  L‐102  Drawing(s) showing the layout and operation of  Rule 9‐3  Greywater Reuse  greywater reuse systems   N/A  Drawing(s) showing the layout and operation of  Rule 9‐4  Rainwater Collection  rainwater collection systems   L‐101  Drawing(s) showing the locations of liquid‐based  Rule 9‐6  Thermal Mass  thermal mass systems   N/A  Specifications for components of liquid‐based thermal  Rule 9‐6  Thermal Mass  mass systems   N/A  Drawing(s) showing the layout and operation of  Rule 9‐7  Greywater Heat Recovery  greywater heat recovery systems   N/A  Drawing(s) showing the complete sequence of water  Rule 9‐8  Water Delivery  delivery and distribution events   P‐101  Specifications for the containers to which water will  Rule 9‐8  Water Delivery  be delivered   P‐101  Drawing(s) showing the complete sequence of water  Rule 9‐9  Water Removal  consolidation and removal events   P‐101  Specifications for the containers from which water  Rule 9‐9  Water Removal  will be removed   P‐101  Interior and exterior plans showing entire accessible  Rule 11‐4  Public Exhibit  tour route   G‐103          Revision 4    Published 03/22/2011  U.S. D.O.E. Solar Decathlon 2011   Page  ‐ 7 FLORIDA INTERNATIONAL UNIVERSITY,  Modesto A. Maidique Campus , School of Architecture  11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA  Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887          Detailed Water Budget         Revision 4    Published 03/22/2011  U.S. D.O.E. Solar Decathlon 2011   Page  ‐ 8 FLORIDA INTERNATIONAL UNIVERSITY,  Modesto A. Maidique Campus , School of Architecture  11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA  Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887              Revision 4    Published 03/22/2011  U.S. D.O.E. Solar Decathlon 2011   Page  ‐ 9 FLORIDA INTERNATIONAL UNIVERSITY,  Modesto A. Maidique Campus , School of Architecture  11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA  Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887          Summary of Unlisted Electrical Components   All electrical components used in the design of the Florida International University Solar Decathlon Team house shall  carry an approved agency’s listing per Section 6.7 of the Solar Decathlon 2011 Building Code.      Revision 4    Published 03/22/2011  U.S. D.O.E. Solar Decathlon 2011   Page  ‐ 10

Description:
Significant changes to the project manual that have occurred between submissions .. AISC's "Specification for the Design of Steel Hollow Structural Sections.".
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.