PROJECT MANUAL U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011 BRINGING SOLAR TO THE SUNSHINE STATE! FLORIDA INTERNATIONAL UNIVERSITY School of Architecture Modesto A. Maidique Campus 11200 SW 8th Street PCA 386 A Miami, Florida, 33199, USA Prof. Marilys Nepomechie, FAIA [email protected] Tel. 305.348.1887 Fax. 305.348.2650 Project Manual . Deliverables Team Florida International University . Aug 11, 2011 FLORIDA INTERNATIONAL UNIVERSITY, Modesto A. Maidique Campus , School of Architecture 11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887 Table of Contents Table of Contents .......................................................................................................................................................................... 2 Summary of Changes ..................................................................................................................................................................... 4 [01/11/2011] Revision 1 ........................................................................................................................................................................ 4 [03/22/2011] Revision 2 ........................................................................................................................................................................ 4 [05/02/2011] Revision 3 ........................................................................................................................................................................ 4 [08/11/2011] Revision 4 ........................................................................................................................................................................ 4 Rules Compliance Checklist ........................................................................................................................................................... 5 Detailed Water Budget .................................................................................................................................................................. 8 Summary of Unlisted Electrical Components ................................................................................................................................ 10 Summary of Reconfigurable Features .......................................................................................................................................... 11 Interconnection Application Form for Solar Decathlon 2011 ........................................................................................................ 12 Energy Analysis Results and Discussion ........................................................................................................................................ 13 Construction Specifications ......................................................................................................................................................... 20 Division 01 ‐ General Requirements ................................................................................................................................................ 41 Division 04 – Masonry……………………………………………………………………………………………………………………………………….………………..…….49 Division 05 – Metals ........................................................................................................................................................................ 21 Division 06 – Wood, Plastics, and Composites ................................................................................................................................ 40 Division 07 – Thermal and Moisture Protection ............................................................................................................................. 93 Division 08 – Openings .................................................................................................................................................................. 175 Division 09 – Finishes .................................................................................................................................................................... 196 Division 10 – Specialties ................................................................................................................................................................ 213 Division 11 – Equipment ............................................................................................................................................................... 230 Division 12 – Furnishings ............................................................................................................................................................... 239 Division 22 – Plumbing .................................................................................................................................................................. 253 Division 26 – Electrical. ................................................................................................................................................................. 326 Division 28 – Electronic Safety and Security. ............................................................................................................................... 326 Division 31 – Earthwork…………………………………………..………………………………………………………..…………………………………………………….331 Division 32 – Exterior Improvements……………………………………………………………………………………………………………………………………….326 Division 33 – Utilities……………………………………………………………………………………………………………………………………………………………….326 Division 41 – Material Processing and Handling Equipment ......................................................................................................... 362 Division 48 – Electrical Power Generation .................................................................................................................................... 368 Revision 4 Published 03/22/2011 U.S. D.O.E. Solar Decathlon 2011 Page ‐ 2 FLORIDA INTERNATIONAL UNIVERSITY, Modesto A. Maidique Campus , School of Architecture 11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887 Revision 4 Published 03/22/2011 U.S. D.O.E. Solar Decathlon 2011 Page ‐ 3 FLORIDA INTERNATIONAL UNIVERSITY, Modesto A. Maidique Campus , School of Architecture 11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887 Summary of Changes Significant changes to the project manual that have occurred between submissions have been outlined below. The Construction Drawings should also be reviewed for relevant revisions. [01/11/2011] Revision 1 The Project Manual has been updated from the previous issue. Revisions include: Complete update of all contents within manual 03/22/2011] Revision 2 The Project Manual has been updated from the previous issue. Revisions include: Complete update of all contents within manual 05/2/2011] Revision 3 The Project Manual has been updated from the previous issue. Revisions include: Complete update of all contents within manual 08/11/2011] Revision 4 The Project Manual has been updated from the previous issue. Revisions include: Final submission Revision 4 Published 03/22/2011 U.S. D.O.E. Solar Decathlon 2011 Page ‐ 4 FLORIDA INTERNATIONAL UNIVERSITY, Modesto A. Maidique Campus , School of Architecture 11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887 Rules Compliance Checklist RULE RULE DESCRIPTION LOCATION DESCRIPTION LOCATION Drawing(s) showing the assembly and disassembly sequences and the movement of heavy machinery on Rule 4‐2 Construction Equipment the competition site 0 Sheets Rule 4‐2 Construction Equipment Specifications for heavy machinery 0‐602 ,0‐603 Drawing(s) showing the locations and depths of all Rule 4‐3 Ground Penetration ground penetrations on the competition site E‐501 Drawing(s) showing the location, contact area, and soil‐bearing pressure of every component resting Rule 4‐4 Impact on the Turf directly on the turf S‐101, S‐111 Rule 4‐5 Generators Specifications for generators Spec 41 65 16 Drawing(s) showing the locations of all equipment, containers, and pipes that will contain liquids at any Rule 4‐6 Spill Containment point during the event P‐101, P‐104 Specifications for all equipment, containers, and pipes Rule 4‐6 Spill Containment that will contain fluids at any point during the event Spec 22 11 16 Calculations showing that the structural design remains compliant even if 18 in. (45.7 cm) of vertical Rule 4‐7 Lot Conditions elevation change exists S‐501 Drawing(s) showing shimming methods and materials to be used if 18 in. (45.7 cm) of vertical elevation Rule 4‐7 Lot Conditions change exists on the lot S‐501 Drawing(s) showing the location of all house and site Rule 5‐2 Solar Envelope Dimensions components relative to the solar envelope G‐201, G‐202 List of solar envelope exemption requests Rule 5‐2 Solar Envelope Dimensions accompanied by justifications and drawing references N/A List of, or marking on, all drawing and project manual sheets that have been or will be stamped by the qualified, licensed design professional in the stamped structural submission; the stamped submission shall consist entirely of sheets that also appear in the Rule 6‐1 Structural Design Approval drawings and project manual S‐001 – S 523 Drawing(s) showing all information needed by the rules officials to measure the finished square footage Rule 6‐2 Finished Square Footage electronically G‐101 Revision 4 Published 03/22/2011 U.S. D.O.E. Solar Decathlon 2011 Page ‐ 5 FLORIDA INTERNATIONAL UNIVERSITY, Modesto A. Maidique Campus , School of Architecture 11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887 Drawing(s) showing all movable components that may increase the finished square footage if operated Rule 6‐2 Finished Square Footage during contest week N/A Drawing(s) showing the accessible public tour route and the ground surface area that will be covered by Rule 6‐3 Entrance and Exit Routes organizer‐provided walkway material G‐103 Drawing(s) showing the location of all vegetation and, if applicable, the movement of vegetation designed as Rule 7‐1 Placement part of an integrated mobile system L‐101 Drawing(s) showing the layout and operation of grey Rule 7‐2 Watering Restrictions water irrigation systems N/A Rule 8‐1 PV Technology Limitations Specifications for photovoltaic components Spec 26 31 00 Drawing(s) showing the location(s) and quantity of all primary and secondary batteries and stand‐alone, PV‐ Rule 8‐3 Batteries powered devices L‐101 Specifications for all primary and secondary batteries Rule 8‐3 Batteries and stand‐alone, PV‐powered devices L‐101 Drawing(s) describing the operation of the desiccant Rule 8‐4 Desiccant Systems system N/A Rule 8‐4 Desiccant Systems Specifications for desiccant system components N/A Drawing(s) showing the locations of the photovoltaics, inverter(s), terminal box, meter housing, service Rule 8‐5 Village Grid equipment, and grounding means E201 – E501 Spec 26 05 26, Specifications for the photovoltaics, inverter(s), 48 19 16, terminal box, meter housing, service equipment, and 26 24 16, Rule 8‐5 Village Grid grounding means 26 27 13, Rule 8‐5 Village Grid One‐line electrical diagram E‐601 Calculation of service/feeder net computed load per Rule 8‐5 Village Grid NEC 220 E‐603 Site plan showing the house, decks, ramps, tour Rule 8‐5 Village Grid paths, and terminal box G‐103 Elevation(s) showing the meter housing, main utility Rule 8‐5 Village Grid disconnect, and other service equipment M‐201 Drawing(s) showing the location of all liquid Rule 9‐1 Container Locations containers relative to the finished square footage L‐102 Drawing(s) demonstrating that the primary supply water tank(s) is fully shaded from direct solar radiation between 9 a.m. and 5 p.m. EDT or between Rule 9‐1 Container Locations 8 a.m. and 4 p.m. solar time on October 1 S‐521 Revision 4 Published 03/22/2011 U.S. D.O.E. Solar Decathlon 2011 Page ‐ 6 FLORIDA INTERNATIONAL UNIVERSITY, Modesto A. Maidique Campus , School of Architecture 11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887 Quantity, specifications , and delivery date(s) of all team-provided liquids for irrigation, thermal mass, hydronic system pressure testing, and thermodynamic Rule 9‐2 Team‐Provided Liquids system operation L‐102 Drawing(s) showing the layout and operation of Rule 9‐3 Greywater Reuse greywater reuse systems N/A Drawing(s) showing the layout and operation of Rule 9‐4 Rainwater Collection rainwater collection systems L‐101 Drawing(s) showing the locations of liquid‐based Rule 9‐6 Thermal Mass thermal mass systems N/A Specifications for components of liquid‐based thermal Rule 9‐6 Thermal Mass mass systems N/A Drawing(s) showing the layout and operation of Rule 9‐7 Greywater Heat Recovery greywater heat recovery systems N/A Drawing(s) showing the complete sequence of water Rule 9‐8 Water Delivery delivery and distribution events P‐101 Specifications for the containers to which water will Rule 9‐8 Water Delivery be delivered P‐101 Drawing(s) showing the complete sequence of water Rule 9‐9 Water Removal consolidation and removal events P‐101 Specifications for the containers from which water Rule 9‐9 Water Removal will be removed P‐101 Interior and exterior plans showing entire accessible Rule 11‐4 Public Exhibit tour route G‐103 Revision 4 Published 03/22/2011 U.S. D.O.E. Solar Decathlon 2011 Page ‐ 7 FLORIDA INTERNATIONAL UNIVERSITY, Modesto A. Maidique Campus , School of Architecture 11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887 Detailed Water Budget Revision 4 Published 03/22/2011 U.S. D.O.E. Solar Decathlon 2011 Page ‐ 8 FLORIDA INTERNATIONAL UNIVERSITY, Modesto A. Maidique Campus , School of Architecture 11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887 Revision 4 Published 03/22/2011 U.S. D.O.E. Solar Decathlon 2011 Page ‐ 9 FLORIDA INTERNATIONAL UNIVERSITY, Modesto A. Maidique Campus , School of Architecture 11200 SW 8th Street PCA 386 A, Miami, Florida, 33199, USA Marilys Nepomechie, FAIA, [email protected], Tel. 305.348.1887 Summary of Unlisted Electrical Components All electrical components used in the design of the Florida International University Solar Decathlon Team house shall carry an approved agency’s listing per Section 6.7 of the Solar Decathlon 2011 Building Code. Revision 4 Published 03/22/2011 U.S. D.O.E. Solar Decathlon 2011 Page ‐ 10
Description: