Table of Contents Appendix A Submittal Templates ...................................................................................... A-1 A.1 Standard SWQMP ........................................................................................................................................... A-2 A.2 PDP SWQMP................................................................................................................................................... A-3 Appendix B Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods .. ..................................................................................................................... B-1 B.1 DCV .................................................................................................................................................... B-2 B.1.1 Runoff Factor ............................................................................................................................................ B-2 B.1.2 Offline BMPs ............................................................................................................................................ B-3 B.1.3 85th Percentile, 24-Hour Storm Event ................................................................................................. B-3 B.2 Adjustments to Account for Site Design BMPs ......................................................................................... B-6 B.2.1 Adjustment to Impervious Runoff Factor ........................................................................................... B-6 B.2.2 Adjustment to DCV ................................................................................................................................. B-8 B.3 Harvest and Use BMPs ................................................................................................................................. B-11 B.3.1 Planning Level Harvest and Use Feasibility ....................................................................................... B-11 B.3.2 Harvested Water Demand Calculation ............................................................................................... B-13 B.3.3 Sizing Harvest and Use BMPs .............................................................................................................. B-17 B.4 Infiltration BMPs ........................................................................................................................................... B-18 B.4.1 Simple Method ........................................................................................................................................ B-19 B.4.2 Percent Capture Method ....................................................................................................................... B-20 B.4.3 Technical Basis for Equivalent Sizing Methods ................................................................................ B-24 B.5 Biofiltration BMPs ......................................................................................................................................... B-26 B.5.1 Standard Biofiltration BMP Footprint Sizing Factors ...................................................................... B-28 B.5.2 Basis for Minimum Sizing Factor for Biofiltration BMPs ............................................................... B-29 B.6 Flow-Thru Treatment Control BMPs (for use with Alternative Compliance) .................................... B-33 B.6.1 PDP Most Significant Pollutants of Concern .................................................................................... B-33 B.6.2 Selection of Flow-Thru Treatment Control BMPs ........................................................................... B-36 B.6.3 Sizing Flow-Thru Treatment Control BMPs: .................................................................................... B-44 Appendix C Geotechnical and Groundwater Investigation Requirements ....................... C-1 C.1 Purpose and Phasing ....................................................................................................................................... C-1 C.2 Geotechnical Feasibility Criteria .................................................................................................................... C-2 C.2.1 Soil and Geologic Conditions ................................................................................................................. C-2 i June 2015 C.2.2 Settlement and Volume Change ............................................................................................................. C-3 C.2.3 Slope Stability ............................................................................................................................................ C-3 C.2.4 Utility Considerations .............................................................................................................................. C-3 C.2.5 Groundwater Mounding ......................................................................................................................... C-4 C.2.6 Retaining Walls and Foundations .......................................................................................................... C-4 C.2.7 Other Factors ............................................................................................................................................ C-4 C.3 Groundwater Quality and Water Balance Feasibility Criteria ................................................................... C-5 C.3.1 Soil and Groundwater Contamination .................................................................................................. C-5 C.3.2 Separation to Seasonal High Groundwater .......................................................................................... C-5 C.3.3 Wellhead Protection ................................................................................................................................. C-5 C.3.4 Contamination Risks from Land Use Activities .................................................................................. C-6 C.3.5 Consultation with Applicable Groundwater Agencies ....................................................................... C-6 C.3.6 Water Balance Impacts on Stream Flow............................................................................................... C-6 C.3.7 Downstream Water Rights ...................................................................................................................... C-7 C.3.8 Other Factors ............................................................................................................................................ C-7 C.4 Geotechnical and Groundwater Investigation Report Requirements ..................................................... C-7 C.4.1 Site Evaluation .......................................................................................................................................... C-7 C.4.2 Field Investigation .................................................................................................................................... C-8 C.4.3 Reporting Requirements by Geotechnical Engineer .......................................................................... C-8 C.4.4 Reporting Requirements by the Project Design Engineer ............................................................... C-10 C.5 Feasibility Screening Exhibits ...................................................................................................................... C-15 Appendix D Approved Infiltration Rate Assessment Methods for Selection and Design of Storm Water BMPs ......................................................................................... D-1 D.1 Introduction ................................................................................................................................................... D-1 D.2 Role of Infiltration Testing in Different Stages of Project Development ............................................. D-1 D.3 Guidance for Selecting Infiltration Testing Methods ............................................................................... D-2 D.3.1 Desktop Approaches and Data Correlation Methods ....................................................................... D-4 D.3.2 Surface and Shallow Excavation Methods .......................................................................................... D-5 D.3.3 Deeper Subsurface Tests ........................................................................................................................ D-8 D.4 Specific Considerations for Infiltration Testing ....................................................................................... D-10 D.4.1 Hydraulic Conductivity versus Infiltration Rate versus Percolation Rate .................................... D-10 D.4.2 Cut and Fill Conditions ........................................................................................................................ D-10 D.4.3 Effects of Direct and Incidental Compaction .................................................................................. D-12 ii June 2015 D.4.4 Temperature Effects on Infiltration Rate .......................................................................................... D-12 D.4.5 Number of Infiltration Tests Needed ................................................................................................ D-13 D.5 Selecting a Safety Factor .............................................................................................................................. D-13 D.5.1 Determining Factor of Safety .............................................................................................................. D-14 D.5.2 Site Suitability Considerations for Selection of an Infiltration Factor of Safety ......................... D-15 D.5.3 Design Related Considerations for Selection of an Infiltration Factor of Safety ....................... D-16 D.5.4 Implications of a Factor of Safety in BMP Feasibility and Design ............................................... D-18 Appendix E BMP Design Fact Sheets ................................................................................ E-1 E.1 Source Control BMP Requirements ............................................................................................................. E-2 E.2 SD-1 Street Trees ........................................................................................................................................... E-15 E.3 SD-5 Impervious Area Dispersion.............................................................................................................. E-19 E.4 SD-6A: Green Roofs ..................................................................................................................................... E-23 E.5 SD-6B Permeable Pavement (Site Design BMP)...................................................................................... E-27 E.6 SD-8 Rain Barrels .......................................................................................................................................... E-28 E.7 HU-1 Cistern .................................................................................................................................................. E-29 E.8 INF-1 Infiltration Basin ................................................................................................................................ E-33 E.9 INF-2 Bioretention ........................................................................................................................................ E-38 E.10 INF-3 Permeable Pavement (Pollutant Control) ...................................................................................... E-46 E.11 PR-1 Biofiltration with Partial Retention ................................................................................................... E-54 E.12 BF-1 Biofiltration ........................................................................................................................................... E-62 E.13 BF-2 Nutrient Sensitive Media Design ....................................................................................................... E-70 E.14 BF-3 Proprietary Biofiltration Systems ...................................................................................................... E-73 E.15 FT-1 Vegetated Swales .................................................................................................................................. E-74 E.16 FT-2 Media Filters ......................................................................................................................................... E-80 E.17 FT-3 Sand Filters ........................................................................................................................................... E-83 E.18 FT-4 Dry Extended Detention Basin ......................................................................................................... E-89 E.19 FT-5 Proprietary Flow-Thru Treatment Control BMPs ......................................................................... E-94 E.20 PL Plant List .................................................................................................................................................. E-95 Appendix F Biofiltration Standard and Checklist .............................................................. F-1 F.1 Pollutant Treatment Performance Standard ................................................................................................ F-8 F.2 Guidance on Sizing and Design of Non-Standard Biofiltration BMPs ................................................ F-11 F.2.1 Guidance on Design per Conditions of Certification/Verification ............................................... F-11 F.2.2 Sizing of Flow-Based Biofiltration BMP ............................................................................................ F-12 iii June 2015 Appendix G Guidance for Continuous Simulation and Hydromodification Management Sizing Factors ................................................................................................. G-1 G.1 Guidance for Continuous Simulation Hydrologic Modeling for Hydromodification Management Studies in San Diego County Region 9 ....................................................................................................... G-1 G.1.1 Introduction G-1 G.1.2 Software for Continuous Simulation Hydrologic Modeling ............................................................. G-1 G.1.3 Climatology Parameters .......................................................................................................................... G-2 G.1.4 LAND CHARACTERISTICS AND LOSS PARAMETERS ........................................................ G-7 G.1.5 MODELING STRUCTURAL BMPS (PONDS AND LID FEATURES) ............................... G-13 G.1.6 FLOW FREQUENCY AND DURATION .................................................................................... G-18 G.2 Sizing Factors for Hydromodification Management BMPs ................................................................... G-21 G.2.1 Unit Runoff Ratios ................................................................................................................................ G-25 G.2.2 Sizing Factors for "Infiltration" BMP ................................................................................................ G-27 G.2.3 Sizing Factors for Bioretention ........................................................................................................... G-32 G.2.4 Sizing Factors for Biofiltration with Partial Retention and Biofiltration...................................... G-37 G.2.5 Sizing Factors for Biofiltration with Impermeable Liner ................................................................ G-43 G.2.6 Sizing Factors for "Cistern" BMP ....................................................................................................... G-49 Appendix H Guidance for Investigating Potential Critical Coarse Sediment Yield Areas H-1 H.1 Criteria for GLU Analysis.............................................................................................................................. H-3 H.2 Optional Additional Analysis When Potential Critical Coarse Sediment Yield Areas are Present Onsite H-18 Appendix I Forms and Checklists ...................................................................................... I-1 Glossary of Key Terms ............................................................................................................... i iv June 2015 M ODE L BM P DE S I G N M A N UAL Appendix A Submittal Templates June 2015 Appendix A: Submittal Templates Appendix A Submittal Templates The following templates were developed to assist the project applicant and the plan reviewer: • Standard SWQMP • PDP SWQMP A-1 June 2015 Appendix A: Submittal Templates A.1 Standard SWQMP Place holder for jurisdiction specific guidance. A-2 June 2015 Appendix A: Submittal Templates A.2 PDP SWQMP Place holder for jurisdiction specific guidance. A-3 June 2015 M ODE L BM P DE S I G N M A N UAL Appendix B Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods June 2015
Description: