ebook img

Final report of a 1992 Dodge Ram B250 van rear impact CNG fuel tank integrity PDF

68 Pages·1993·3.5 MB·English
by  LookerK. W
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Final report of a 1992 Dodge Ram B250 van rear impact CNG fuel tank integrity

RC 104 2 L66 5 . 1993 c 1 . U.S. Department ofTransportation National Highway Traffic Safety Administration DOTHS 808 300 October 1993 Final Report Final Report of a 1992 Dodge Ram CNG B250 Van Rear Impact Fuel Tank Integrity Thisdocument isavailabletothe public from the NationalTechnical Information Service Sc'C e c \ \: " Transportation Research Center Inc. does not endorse or certify products of manufacturers. The manufacturer's name appears solely to identify the test article. Transportation Research Center Inc. assumes no liability for the report or use thereof. It is responsible for the facts and the accuracy of the data presented herein. This report does not constitute a standard, specification, or regulation. This publication is distributed by the U. S. Department of Transportation, National Highway Traffic Safety Administration, in the interest of information exchange. The opinions, findings and conclusions expressed in this publication are those of the author(s) and not necessarily those of the Department of Transportation or the National Highway Traffic Safety Administration. The United States Government assumes no liability for its contents or use thereof. If trade or manufacturers' names or products are mentioned, it is only because they are considered essential to the object of the publication and should not be construed as an endorsement. The United States Government does not endorse products or manufacturers. (cm u(jU5 Technical Report Documentation Page v !• Report No. 2. Government Accession No. 3. Recipient's Catalog No. .1 VRTC-83-0307 DOT HS 808 300 4. Title and Subtitle 5. Report Date FINAL REPORT OF A 1992 DODGE RAM B250 VAN OCTOBER 1993 REAR IMPACT CNG FUEL TANK INTEGRITY 6. Performing Organization Code 7. Author(s) 8. Performing OrganizationReport No. K. W. Looker, Project Engineer, TRC 930925 9. Performing Organization Name and Address 10. Work Unit No. (TRAJS) National Highway Traffic Safety Admin. Vehicle Research and Test Center 11. Contract or Grant No. P. O. BOX 37 DTNH22-88-C-07292 East Libertv. OH 43319 12. Sponsoring Agency Name and Address 13. Type ofReport and Period Covered U. S. Department of Transportation FINAL REPORT National Highway Traffic Safety Administration SEPT. - NOV. 1993 400 Seventh St., S.W. Washington, DC 20590 14. Sponsoring agency Code DOT/NHTSA/VRTC IS. Supplemental Notes 16. Abstract This 30 mph rear impact test was conducted at Transportation Research Center Inc. on September 25, 1993. The subject vehicle, a Dodge Ram 250 Model B van, VIN 2B4HB25TXNK135503 was impacted in the rear by the FMVSS 301 moving barrier at 29.3 mph. The purpose of this test was to investigate and demonstrate the practicality of the proposed FMVSS 303 test procedure for evaluating the fuel system integrity of a CNG fueled vehicle. DEPARTMENT OF TRANSPORTATION OCT 7 1995 1 NASEIF BRANCH LIBRARY 17. Key Words 18. Distribution Statement Document is available to the CNG Fuel System Integrity public through the National Technical Information Service Springfield, VA 22161 19. Security Classil. (of this report) 20. Security Classil. (of this page) 21. No. of Pages i: jwc UNCLASSIFIED UNCLASSIFIED 60 Form DOT F 1700.0 (8-72) Reproduction of completed page authorized 1 . . .'7 iV:'. 18 111 TABLE OF CONTENTS SECTION DESCRIPTION PAGE 1.0 PURPOSE AND TEST PROCEDURE 1-1 2.0 REAR IMPACT TEST SUMMARY 2-1 3.0 CAMERA INFORMATION 1« — APPENDIX A PHOTOGRAPHS A— APPENDIX B DATA PLOTS B— iii LIST OF TABLES NUMBER TITLE PAGE 1 CRASH TEST SUMMARY 2-4 2 TEST VEHICLE INFORMATION 2-5 3 POST-IMPACT DATA 2-8 4 POST-IMPACT DUMMY/VEHICLE DATA 2-10 5 VEHICLE ACCELEROMETER LOCATIONS AND DATA SUMMARY 2-13 6 MOVING BARRIER ACCELEROMETER LOCATIONS AND DATA SUMMARY 2-15 7 FUEL SYSTEM DATA 2-16 8 MOTION PICTURE CAMERA INFORMATION 3-3 IV LIST OF FIGURES NUMBER TITLE PAGE 1 IMPACT VELOCITY MEASUREMENT SYSTEM 2-9 2 VEHICLE CRUSH 2-11 3 VEHICLE ACCELEROMETER PLACEMENT 2-12 4 MOVING BARRIER ACCELEROMETER PLACEMENT 2-14 5 CAMERA POSITIONS 3-2 V LIST OF PHOTOGRAPHS DESCRIPTION FIGURE PRE-TEST FRONT VIEW A-l POST-TEST FRONT VIEW A-2 PRE-TEST LEFT SIDE VIEW A-3 POST-TEST LEFT SIDE VIEW A-4 PRE-TEST REAR VIEW A-5 POST-TEST REAR VIEW A-6 PRE-TEST RIGHT SIDE VIEW A-7 POST-TEST RIGHT SIDE VIEW A-8 PRE-TEST RIGHT FRONT THREE-QUARTER VIEW A-9 POST-TEST RIGHT FRONT THREE-QUARTER VIEW A-10 PRE-TEST RIGHT REAR THREE-QUARTER VIEW A-ll POST-TEST RIGHT REAR THREE-QUARTER VIEW A-12 PRE-TEST LEFT FRONT THREE-QUARTER VIEW A-13 POST-TEST LEFT FRONT THREE-QUARTER VIEW A-14 PRE-TEST LEFT REAR THREE-QUARTER VIEW A-15 POST-TEST LEFT REAR THREE-QUARTER VIEW A-16 PRE-TEST OVERHEAD VIEW A-17 PRE-TEST FUEL TANK - VIEW A-18 1 PRE-TEST FUEL TANK - VIEW 2 A-19 POST-TEST FUEL TANK VIEW A-20 PRE-TEST FRONT UNDERBODY VIEW A-21 POST-TEST FRONT UNDERBODY VIEW A-22 PRE-TEST REAR UNDERBODY VIEW A-23 POST-TEST REAR UNDERBODY VIEW A-24 VI SECTION 1.0 PURPOSE AND TEST PROCEDURE 1-1 PURPOSE This 30 mph moving barrier rear impact test was conducted for Vehicle Research and Test Center by Transportation Research Center Inc. (TRC). The purpose of this test was to investigate and demonstrate the practicality of the proposed FMVSS 303 test procedure for evaluating the fuel system integrity of a CNG fueled vehicle. The subject vehicle for this test was a Dodge Ram 250 Model B van. 1-2

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.