ebook img

FINAL DRAINAGE REPORT Archer Park Subdivision Archer Park Subdivision Filing No. 1 10 El ... PDF

82 Pages·2017·6.47 MB·English
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview FINAL DRAINAGE REPORT Archer Park Subdivision Archer Park Subdivision Filing No. 1 10 El ...

FINAL DRAINAGE REPORT Archer Park Subdivision Archer Park Subdivision Filing No. 1 10 El Encanto Drive CITY OF COLORADO SPRINGS EL PASO COUNTY, COLORADO Preparation Date: September 24, 2016 Revised: September 11, 2017 Developer: Rick DeLesk The Newport Company 620 Southpoint Ct. #280 Colorado Springs, CO 80906 (719) 576-0920 Denver Office: Colorado Springs Office: 3461 Ringsby Court, #125 2727 N. Cascade Avenue, #160 Denver, Colorado 80216 Colorado Springs, CO 80907 720.413.9691 719.231.3959 AltitudeLandCo.com SMALL SUBDIVISION DRAINAGE REPORT Archer Park Subdivision Archer Park Subdivision Filing No. 1 10 El Encanto Drive City of Colorado Springs, El Paso County, Colorado JOB NUMBER 16-121 Archer Park Subdivision Filing No. 1, Section 36, Township 14 South, Range 67 West of 6th P.M. City of Colorado Springs, County of El Paso, State of Colorado PREPARED BY: Mr. Eric T.Burtzlaff, P.E. Altitude Land Consultants, Inc. 3461 Ringsby Court, Suite 125 Denver, CO 80216 Denver Office: Colorado Springs Office: 3461 Ringsby Court, #125 2727 N. Cascade #160 Denver, Colorado 80216 Colorado Springs, CO 80907 720.413.9691 719.231.3959 AltitudeLandCo.com TABLE OF CONTENTS: 1.0 – ENGINEERING SIGNATURE PAGE 2.0 – EXISTING AND PROPOSED DRAINAGE 2.1 - Location and Description of Development 2.2 - Soils 2.3 - Existing Drainage Characteristics 2.4 – Previous Studies conducted on site 2.5 – Floodplain Statement 2.6 – Proposed On-Site and Off-Site Drainage 2.6.1 – Proposed Facilities 2.6.2 – Routing 2.6.3 – Detention 2.7 - Compliance with Master and Development Plans 2.8 – Adequacy of existing outfall facility 2.9 – Public or Private maintenance of facilities 2.10 – Stable Natural Channels 2.11 – Stormwater Quality 3.0 – DRAINAGE DESIGN CRITERIA 3.1 – Regulations 3.2 – Development Criteria Reference and Constraints 3.3 – Hydrological Criteria 3.4 – Waivers from Criteria 3.5 - Conclusions 4.0 – Financials 4.1 – Drainage Fees 4.2 – Bridge Fees 4.3 – Construction Cost Opinion 5.0 – SPECIAL AGREEMENTS 5.1 - Private Maintenance Agreement 5.2 – Acceptance of Downstream Owners 6.0 - REFERENCES 7.0 - APPENDICIES Denver Office: Colorado Springs Office: 3461 Ringsby Court, #125 2727 N. Cascade #160 Denver, Colorado 80216 Colorado Springs, CO 80907 720.413.9691 719.231.3959 AltitudeLandCo.com 1.0 - STATEMENT PAGE: Engineer’s Statement This report and plan for the drainage design of Archer Park Subdivision was prepared by me (or under my direct supervision) and is correct to the best of my knowledge and belief. Said report and plan has been prepared in accordance with the City of Colorado Springs Drainage Criteria Manual and is in conformity with the master plan of the drainage basin. I understand that the City of Colorado Springs does not and will not assume liability for drainage facilities designed by others. I accept responsibility for any liability caused by any negligent acts, errors or omissions on my part in preparing this report. ______________________________________________ Seal: Eric T. Burtzlaff, P.E. Colorado P.E #50061___ Developer’s Statement: Rick DeLesk hereby certifies that the drainage facilities for Archer Park Subdivision shall be constructed according to the design presented in this report. I understand that the City of Colorado Springs does not and will not assume liability for the drainage facilities designed and/or certified by my engineer and that are submitted to the City of Colorado Springs pursuant of section 7.7.906 of the City Code; and cannot, on behalf of Archer Park Subdivision, guarantee that the final drainage design review will absolve Archer Park Subdivision and/or their successors and/or assigns of future liability for improper design. I further understand that approval of the final plat does not imply approval of my engineer’s drainage design. ___________________________________________ Name of Developer ___________________________________________ Authorized Signature Date ___________________________________________ Printed Name ___________________________________________ Title ___________________________________________ Address: City of Colorado Springs: Filed in accordance with Section 7.7.906 of the Code of the City of Colorado Springs, 2001, as amended. ______________________________________________________________________________________ For the City Engineer Date Denver Office: Colorado Springs Office: 3461 Ringsby Court, #125 2727 N. Cascade #160 Denver, Colorado 80216 Colorado Springs, CO 80907 720.413.9691 719.231.3959 AltitudeLandCo.com 2.0 – EXISTING AND PROPOSED DRAINAGE: 2.1 – Location and Description of Development: The purpose of this drainage report for the Archer Park Subdivision is to establish that proposed development will not negatively impact adjacent properties during storm events. It is also intended to show that existing storm infrastructure has capacity to convey the additional flows generated by the proposed development. The subject property of this report is addressed as 10 El Encanto Drive, Colorado Springs, El Paso County, CO and is located south of Mayfield Lane where Mayfield Lane meets El Encanto Drive. The site is bordered by unplatted land to the South, and single family residences on all other sides. The names of the surrounding plats are as follows: Broadmoor Northstar Lots 1-4 are to the North, Replat of Lot 9, Block 1, Sierra Vista Estates to the West, and Count Pourtables Addition Broadmoor Block 7, Lots 5 & 6 to the East. The subject property is located in Section 36, Township 14 South, and Range 67 West of the 6th Principal Meridian. The subject property is accessed via the intersection of Mayfield Lane and El Encanto Drive per the private access drive on the North. Part of the site, 1.196 acres, is currently referred to as Sierra Vista Estates Replat, Lot 3, Block 1. The rest of the site, 3.505 acres, referred to herein as “Unplatted Parcel”, is currently unplatted. A Vicinity Map is included in this report in the (Appendix A). The subject property is 4.701 acres. Most of the site (3.505 acres) currently exists as an unplatted parcel covered with medium and low growing grass. The unplatted parcel flows northeast towards the intersection of Mayfield Lane and El Encanto Drive at an average grade of roughly 4%. The existing drainage pattern for the 1.19 acre parcel is to the north towards the same intersection of Mayfield Land and El Encanto Drive at the same grade, roughly 4%. Please refer to the historic drainage plan in (Appendix E) for more details. Seven single family residential lots are proposed onsite with three tracts of land to be used for parking, drainage, and landscaped areas. This report is required as a submittal item of the City of Colorado Springs Development Plan process. 2.2 – Soils: A soil survey of the area (Appendix B) indicated soil type ‘12’ (Bresser Sandy Loam) which exhibit Hydrologic Soil Group C characteristics, respectively. Bresser Sandy Loam is classified as “well drained”. Please see (Appendix B) for full report. Additionally, a Denver Office: Colorado Springs Office: 3461 Ringsby Court, #125 2727 N. Cascade #160 Denver, Colorado 80216 Colorado Springs, CO 80907 720.413.9691 719.231.3959 AltitudeLandCo.com Geologic Hazard Investigation was performed for the subject site by Entech Engineering, Inc., on December 29th, 2016. 2.3 – Existing Drainage Characteristics The subject property lies to the south of the existing Broadmoor Northstar Subdivision and to the west of existing Sierra Vista Estates Replat, Block 1, Lots 1 & 2. The parcel also lies to the north of another 5.59 acres unplatted parcel of land. All flows from the Broadmoor Northstar parcel are conveyed onto El Encanto Drive which is then conveyed to existing storm infrastructure located at the intersection of El Encanto Drive & Sierra Vista Drive. Flows generated on the parcels to the east are conveyed to the northeast onto El Encanto Drive. Off-site flows come onto the subject site from the parcel to the south of the subject site. These flows were partially accounted for in the drainage report completed for the Broadmoor Northstar Subdivision prepared by JR Engineering, LTD., dated May 1987, and are conveyed to El Encanto Drive and the existing infrastructure at the intersection of El Encanto Drive & Sierra View Drive. This infrastructure ultimately leads to City of Colorado Springs Regional Detention Facility known as Spring Run Reservoir No. 2. The site is located within the Stratton Drainage Basin. There is a large offsite basin that enters the site from the South determined to be 34.6 acres. These offsite flows enter the site and are conveyed in an existing grass-lined swale that runs southwest to northeast on the subject site. 2.4 – Previous Studies conducted on site To the best knowledge of this engineer, there are no masterplans prepared or studies conducted on the Archer Park Subdivision site. 2.5 – Floodplain Statement Per FEMA flood firmette 08041C0737F, dated March 17, 1997, Archer Park Subdivision is not located within any FEMA floodplain. See (Appendix C). 2.6 – Proposed On-Site and Off-Site Drainage 2.6.1 – Proposed Facilities As part of the design, we have obtained and reviewed the Existing Drainage Report for the adjacent parcel, Broadmoor Northstar Subdivision, prepared by JR Engineering, LTD., dated May 1987 (Appendix F). Denver Office: Colorado Springs Office: 3461 Ringsby Court, #125 2727 N. Cascade #160 Denver, Colorado 80216 Colorado Springs, CO 80907 720.413.9691 719.231.3959 AltitudeLandCo.com After review of this report, Altitude Land Consultants, Inc. proposes to convey all on-site developed stormwater to a new detention facility which shall release to El Encanto Drive and be conveyed to existing storm infrastructure to the north. Existing storm infrastructure in Sierra View Drive includes 2 - 20’ curb inlets and 2 – 6’ curb inlets which have a combined capacity of 126.6 cfs per the approved and recorded drainage report completed by JR Engineering, LTD. for the Broadmoor Northstar Subdivision dated May 1987. Additionally, historic offsite flows shall be routed around the subject property via grass lined swales and a concrete elliptical pipe to its historical discharge point, located at the Northeast corner of the site. Altitude Land Consultants, Inc. is proposing a single, private full spectrum pond located within Tract A near the entrance of the subject site. The pond is designed and sized for the 100-year storm event per the standards provided in the Colorado Springs Drainage Criteria Manual (CSDCM) for a Full Spectrum Detention (FSD) Pond. Calculations were also performed to determine the required volume for Excess Urban Runoff Volume (EURV) and the 5-year storm event. The calculations can be found in Appendix D. Per CSDCM Vol. 1, Ch 13, Section 4.1. The proposed FSD facility was designed to provide water quality for the EURV. The pond is designed to drain in 72 hours (per CSDCM Vol. 1, Ch 13, Section 4.2). A 1.75 foot deep swale, located on the south side of the proposed 20’ private drive known as “Broadmoor Meadows View” conveys flows generated onsite to the intersection of Broadmoor Meadows View and Waterfield View, the proposed private driveway located along the Easterly, to a 24 inch reinforced concrete pipe and headwall. The swale was designed with AutoCAD Hydraflow Extension and has 1.0’ of freeboard. Hydraflow express software’s culvert tool was used to determine the size of the reinforced concrete pipe required to convey the flow (Appendix D). The concrete pipe will convey flows to the full spectrum pond located within Tract A which contains a forebay, micro-pool, and trickle channel. The forebay will discharge through a 3.7 inch notch onto a 3 foot concrete pan which will act as the trickle channel and convey all flows to the 5 foot by 9 foot concrete outfall structure. Flows are then conveyed via an 18 inch PVC pipe to a headwall and rip rap lined swale oriented towards the intersection of El Encanto Drive and Mayfield Lane. A table listing all design information for the pond, forebay, and outfall structure can be found with the drainage calculations in Appendix D. In an overflow event, the full spectrum pond runoff shall be conveyed through a rip rap armored spillway to the grass-lined swale located to the Northeast of the pond. The pond also provides a 1 foot freeboard to ensure the pond overtops at the spillway per CSDCM Standards. Please see drainage calculations (Appendix D) for more details. 2.6.2 – Routing As mentioned above, developed flows shall be routed to the detention pond with a 72- hour drain time. The flows will be conveyed via roof drains, underdrains, and overland Denver Office: Colorado Springs Office: 3461 Ringsby Court, #125 2727 N. Cascade #160 Denver, Colorado 80216 Colorado Springs, CO 80907 720.413.9691 719.231.3959 AltitudeLandCo.com flows. The detention pond will ultimately outfall to El Encanto Drive. The calculations for the street capacity of El Encanto Drive can be found in appendix of the drainage report completed for Broadmoor Northstar Subdivision. Per the above mentioned drainage report, El Encanto Drive currently has a street capacity of 59.83 cfs. Altitude Land Consultants has conducted field work to confirm capacity as indicated in the aforementioned drainage report is accurate in the field. It was determined by Altitude Land Consultants that historically the street capacity demand is 81.04 cfs (12.53 cfs from the subject site and 68.51 cfs from the offsite basin). This gives an excess demand of 21.21 cfs. The proposed full spectrum detention pond will have a maximum release rate of 2.35 cfs, per Table 13-2 in CSDCM Vol. 1 Ch. 13 and given the site contains Type’C’ soils. Along with the runoff generated by Basin D2 & D3, this reduces the demand in the street to 72.97 cfs, which is yields an excess of 13.14 cfs. Through on-site design, demand on El Encanto Drive is reduced by 8.07 cfs from historic conditions. Please refer to (Appendix D) for calculations. Offsite flows will be routed through the site in a 2.25’ deep grass lined swale to be located on the southern edge of the subject property. This swale includes 1.00’ of freeboard and conveys flows to a rip rap enforced sump which will contain a headwall and 42 inch elliptical concrete pipe. This concrete pipe will convey flows underneath “Broadmoor Meadows View” to an additional headwall and grass lined swale. Another set of boulders will reduce the velocity of the flows before discharging into the intersection of Mayfield Lane & El Encanto Drive, as they historically discharge. 2.6.3 – Detention Per Section 6.4 of the CSDCM Volume I, detention is required for new developments larger than 1 acre. Detention has been provided for the entire subject site in the form of a full spectrum pond located in Tract A. Offsite flows will be conveyed to the historical discharge point at the intersection of Mayfield Lane & EL Encanto Drive and were not incorporated into the detention pond design, per CSDSM offsite flow bypass standards. 2.7 – Compliance with Master and Development Plans To our knowledge, the proposed development does not conflict with any existing master plans or development plans of parcels surrounding the proposed development. 2.8 – Adequacy of Outfall Facility Per our calculations, located in (Appendix D) and shown on the Drainage plan (Appendix E), Altitude Land Consultants, Inc. has found that the developed runoff generated by our site will increase from 12.53 cfs to 18.16 cfs for the 100-year storm event. This is a total increase of 5.63 cfs. Denver Office: Colorado Springs Office: 3461 Ringsby Court, #125 2727 N. Cascade #160 Denver, Colorado 80216 Colorado Springs, CO 80907 720.413.9691 719.231.3959 AltitudeLandCo.com Following the 4 Step Process outlined CSDCM Vol. 2., Step 1 was addressed by using the low impact development (LID) practice of using grass lined swales instead of a curb and gutter system. A porous paver system was also incorporated into the design in effort to reduce the amount of asphalt for a majority of the private North-South road to be known as “Waterfield View”. Step 1 is followed by the proposed full spectrum pond, which will provide detention as well as water quality treatment for the majority of the site, also satisfying Step 2 of the 4 Step Process. The grass lined swale on the south side of “Broadmoor Meadows View” which conveys flows to this facility will allow infiltration providing additional water quality treatment. The porous paver system will provide water quality and storage to flows not captured within the swale or pond (Basin D3). A grass lined swale located on the Southern property line will be used to convey offsite flows through the site which will provide minor water quality in the form of infiltration. Step 2 will be followed by Step 3 which includes protecting existing drainage ways and reinforcing areas of high flow. There were no established drainage ways located on the subject site previously. The proposed drainage swale located on the South side of “Broadmoor Meadows View” will convey flows generated on-site, while the proposed drainage swale on the south edge of the subject property will convey offsite flows. Riprap and concrete headwalls will be placed at all inlets and outfalls of the drainage infrastructure for stabilization and erosion control. The offsite swale to the North of the intersection of “Broadmoor Meadows View & Waterfield View” will have boulders to provide additional protection for high flows. The outfall for the pond will also have a concrete headwall and riprap rundown. In the event the pond is overtopped, the spillway is reinforced with rip rap to prevent erosion. The final step of the 4 Step Process will be addressed through the maintenance of the proposed full spectrum pond, porous paver system, and grass lined swales by the Broadmoor Meadows HOA. Standards and equations within the Colorado Springs Drainage Criteria Manual (CSDCM) were used to design the pond and features including the forebay, trickle channel, and outfall structure. The outfall structure located at the Northeast corner of the full spectrum pond will control on-site flows onto El Encanto Drive. Offsite flows are conveyed to the Northeast corner of the site as well via concrete flumes and a concrete elliptical pipe. The outfall structure includes a micro pool with an orifice plate which has been designed to treat for the required EURV. Based on the drainage report for Broadmoor Northgate, the existing storm inlets in Sierra Vista Drive have a combined capacity to carry 98.6 cfs. Two additional inlets were installed in the aforementioned subdivision, bringing the total capacity for inlets in El Encanto Drive to 126.6 cfs. The historic demand on these inlets was determined using the historic offsite basin determined within this report, as well as the approved drainage report completed by JR Engineering, LTD. for the Broadmoor Northstar Subdivision dated May 1987, using values found on page 25. The SCS hydraulic calculation method was used by JR Engineering, LTD. for their drainage calculations and report. Denver Office: Colorado Springs Office: 3461 Ringsby Court, #125 2727 N. Cascade #160 Denver, Colorado 80216 Colorado Springs, CO 80907 720.413.9691 719.231.3959 AltitudeLandCo.com Accounting for the additional demand generated from the proposed development it was determined that the total demand on these inlets would be 108.97 cfs. Therefore, existing storm infrastructure in El Encanto has adequate capacity to handle the increase in runoff. Calculations showing the existing storm infrastructure has adequate capacity to handle the additional flows can be found in (Appendix D) of this report. The full spectrum detention pond has a maximum release rate of 2.35 cfs per Table 13-2 in CSDCM Vol. 1 Ch 13 given the site contains Type ’C’ soils. Together with the flows generated from Basins D2 & D3, the total release rate for this proposed development will be 8.07 cfs less than in historic conditions. 2.9 – Public and Private Maintenance of Facilities All responsibility for maintenance of private facilities located on Archer Park Subdivision shall be the responsibilityof Broadmoor Meadows HOA. This includes but is not limited to; rock swales, storm sewer, grass swales, and the detention pond. There are no public facilities proposed for this development. 3.0 – DRAINAGE BASINS AND SUB-BASINS: 3.1 – Regulations: The proposed project is being designed to conform to the design criteria as discussed in the City of Colorado Springs Drainage Criteria Manual. The proposed development will increase the amount of storm runoff from the subject property by 4.89 cfs for the 100- year storm event. Developed on-site flows will be conveyed to the proposed facilities and released at a maximum rate of 2.35 cfs per Table 13-2 in CSDCM Vol. 1 Ch. 13. Together with the flows generated from Basins D2 & D3, the total release rate for this proposed development will be 4.46 cfs. Which is 8.07 cfs less than in historic conditions. Flows will discharge into the intersection of Mayfield Lane & El Encanto Drive and are conveyed to existing storm infrastructure via the historical route for the site. Which was determined to have capacity for the additional flows. Altitude Land Consultants confirmed through calculations that the existing storm infrastructure has adequate capacity to capture the developed flows. See the Drainage Calculations (Appendix D) for the outfall capacity calculations. Altitude Land Consultants did find that El Encanto Drive historically does not have capacity to convey runoff within the street. Therefore, since this an existing condition and that this is a public roadway, Altitude Land Consultants does not propose any public improvements but through on-site design, demand on El Encanto Drive will be reduced from the historic conditions. 3.2 – Development Criteria Reference and Constraints: The drainage report for adjacent parcel, Broadmoor Northstar prepared by JR Engineering, LTD., dated May 1987 establishes that historically all storm runoff for the Denver Office: Colorado Springs Office: 3461 Ringsby Court, #125 2727 N. Cascade #160 Denver, Colorado 80216 Colorado Springs, CO 80907 720.413.9691 719.231.3959 AltitudeLandCo.com

Description:
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Sep 7 2017. Archer Park - 42 Inch Concrete Pipe. Invert Elev Dn (ft). = 6162.00. Pipe Length (ft). = 220.00. Slope (%). = 0.70. Invert Elev Up (ft). = 6163.54. Rise (in). = 34.0. Shape. = Elliptical. Span (i
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.