T 117 C ERMINAL LEANUP S & U A EDIMENT PLAND REAS R A W P EMOVAL CTION ORK LAN MC-0317218 Work Project #: 102365 Submitted to: The Port of Seattle Commission General Offices, Pier 69 2711 Alaskan Way Seattle, WA 98121 Prepared by: IMCO General Construction 2116 Buchanan Loop Ferndale, WA 98248 MAY 28, 2013 Final Removal Action Work Plan Terminal 117 Cleanup Sediment & Upland Areas INTRODUCTION This Removal Action Work Plan (RAWP) is submitted to fulfill one of the requirements of the Phase 1 – Terminal 117 (T-117) Administrative Settlement Agreement and Order on Consent Number CERLCA 10- 2011-0089 (Settlement Agreement, including Statement of Work ) as a Non-Time Critical Removal Action (NTCRA). Phase 1 of the T-117 NTCRA cleanup includes the subareas known as the Upland and Sediment Areas; Phase 2 includes the Adjacent Streets and Yards. This RAWP summarizes the anticipated means and methods by which IMCO General Construction (IMCO) will execute the removal action within the Phase 1 Upland and Sediment Areas. These means and methods are in accordance with the construction drawings and technical specifications provided in the final Design Report (October 8, 2012) and the Conformed Bid Package (POS, November 8, 2012). The means and methods described herein may be, with prior review and approval of EPA, modified as necessary and appropriate to accomplish the work, provided that such methods satisfy the performance requirements set forth in the construction drawings and specifications and the final Design Report. Finally, the approach presented in the RAWP is intended to achieve the project cleanup goals and be protective of worker health and safety, the public, and the environment. The Phase 1 T-117 Removal Action includes the removal of approximately 8,100 cubic yards (cy) of sediment and approximately 38,000 cy of upland soil. The site will be restored to either match existing elevations or, in the case of the upland, backfilled to about +14/15 ft MLLW. Additional soil and sediment may be excavated pending the results of confirmation sampling. This RAWP is organized with the Contractor’s Project Approach and Baseline Schedule provided as Sections 1 and 2, respectively. These sections provide a general overview of the means and methods of performing upland and in-water demolition and removal (excavation and dredging) activities, along with a discussion of the project’s organization and personnel, communication protocols, and subcontractors and suppliers. The remaining Sections 3 through 25 include the required work plans for key elements of the work. May 28, 2013 i Final Removal Action Work Plan Terminal 117 Cleanup Sediment & Upland Areas TABLE OF CONTENTS 1 CONTRACTOR’S PROJECT APPROACH ........................................................................... 1-1 1.1 General Sequence Of Activities ...................................................................................................... 1-1 1.2 General Means And Methods ......................................................................................................... 1-3 1.3 Equipment ...................................................................................................................................... 1-6 1.4 Proposed Wastewater Handling And Disposal Methods ................................................................. 1-7 1.5 Personnel And Subcontractors ....................................................................................................... 1-9 1.6 Communication Structure ............................................................................................................ 1-10 1.7 Emergency And After-Hours Contacts .......................................................................................... 1-10 1.8 Project Staffing ............................................................................................................................. 1-10 1.9 Site Plan ....................................................................................................................................... 1-10 1.10 Disposal Facilities ......................................................................................................................... 1-11 1.11 Material Suppliers ........................................................................................................................ 1-11 1.12 Proposed Transloading Location .................................................................................................. 1-11 1.13 Required Permits.......................................................................................................................... 1-11 1.14 Independent Surveyor Subcontractor .......................................................................................... 1-12 2 BASELINE SCHEDULE .................................................................................................... 2-1 3 SITE SPECIFIC CONSTRUCTION HEALTH AND SAFETY PLAN ............................................ 3-1 3.1 Purpose .......................................................................................................................................... 3-1 3.2 Administrative Information ............................................................................................................ 3-1 3.3 Project Description ......................................................................................................................... 3-2 3.4 Site History ..................................................................................................................................... 3-2 3.5 Site Physical Description ................................................................................................................ 3-3 3.6 Primary Responsibilities ................................................................................................................. 3-4 3.7 Hazard Assessment ........................................................................................................................ 3-7 3.8 Air Monitoring .............................................................................................................................. 3-15 3.9 Personal Protective Equipment .................................................................................................... 3-18 3.10 Site Control .................................................................................................................................. 3-19 3.11 Decontamination ......................................................................................................................... 3-20 3.12 Emergency Response .................................................................................................................... 3-21 3.13 Imco’s Safety And Health Philosophy ........................................................................................... 3-24 3.14 Project Information: ..................................................................................................................... 3-24 3.15 Safety Program ............................................................................................................................. 3-24 3.16 Accident Investigation – Port Of Seattle ....................................................................................... 3-25 3.17 On Site Safety Information ........................................................................................................... 3-26 3.18 Drug And Alcohol Policies ............................................................................................................. 3-26 3.19 First Aid ........................................................................................................................................ 3-27 3.20 Emergency Procedures ................................................................................................................. 3-28 3.21 Emergency Evacuation ................................................................................................................. 3-28 3.22 Weekly Inspections And Safety Meetings ..................................................................................... 3-28 3.23 Disciplinary Procedures ................................................................................................................ 3-29 3.24 Site Specific Concerns ................................................................................................................... 3-29 3.25 Site Specific Information .............................................................................................................. 3-29 4 TRAFFIC CONTROL PLAN .............................................................................................. 4-1 4.1 Traffic Plan And Haul Routes .......................................................................................................... 4-2 4.2 Boeing Access Ramp ....................................................................................................................... 4-4 5 GREEN AND SUSTAINABLE REMEDIATION (GSR) PLAN .................................................. 5-1 5.1 Use Of Non-Petroleum Clean Fuels And Fluids ............................................................................... 5-2 5.2 Methods For Emission Reduction Controls And Policies ................................................................. 5-2 May 28, 2013 ii Final Removal Action Work Plan Terminal 117 Cleanup Sediment & Upland Areas 5.3 Methods For Transportation Minimization And Green Transportation .......................................... 5-3 5.4 Methods Of Recycling, Reuse, And Waste Minimization ................................................................ 5-3 5.5 Use Of Local Materials And Facilities .............................................................................................. 5-4 5.6 Metrics And Methods To Track Emission Reductions ..................................................................... 5-4 5.7 Environmentally Sustainable Business Practices ............................................................................ 5-4 6 POLLUTION PREVENTION PLAN .................................................................................... 6-1 6.1 General Site Pollution Prevention Plan ........................................................................................... 6-1 6.2 In-Water Spill Prevention And Countermeasures ........................................................................... 6-9 7 EROSION AND SEDIMENTATION CONTROL PLAN .......................................................... 7-1 7.1 Site Description And Drawings ....................................................................................................... 7-1 7.2 Erosion And Sedimentation Controls Contract Personnel ............................................................... 7-4 7.3 Schedule ......................................................................................................................................... 7-4 7.4 BMP Installation ............................................................................................................................. 7-5 7.5 BMP Maintenance .......................................................................................................................... 7-7 7.6 BMP Inspection .............................................................................................................................. 7-8 7.7 Record Keeping .............................................................................................................................. 7-8 7.8 BMP Removal ................................................................................................................................. 7-9 7.9 Construction Water ........................................................................................................................ 7-9 7.10 Fugitive Dust Planning .................................................................................................................... 7-9 7.11 Utilities Planning Education.......................................................................................................... 7-10 7.12 Education ..................................................................................................................................... 7-11 8 QUALITY CONTROL PLAN ............................................................................................. 8-1 8.1 Construction Qa/Qc Manual ........................................................................................................... 8-1 8.2 Organization And Responsibilities (IMCO-01) ................................................................................. 8-3 8.3 Document, Data, And Quality Records Control (IMCO-02).............................................................. 8-6 8.4 Purchasing & Subcontract Management (IMCO-03) ..................................................................... 8-10 8.5 Material Management, Acceptance, AND IDENTIFICATION (IMCO-04) ......................................... 8-16 8.6 Construction Process Control (IMCO-05) ...................................................................................... 8-19 8.7 Earthwork Process Control (IMCO-05-1) ....................................................................................... 8-23 8.8 Demolition/Deconstruction Process Control (IMCO-05-2) ............................................................ 8-24 8.9 PILING PROCESS CONTROL (IMCO-05-3) ....................................................................................... 8-27 8.10 Line And Grade Survey Control (IMCO-05-4) ................................................................................ 8-29 8.11 Inspection And Testing (IMCO-06) ................................................................................................ 8-31 8.12 Calibration Of Inspection, Measuring & Test Equipment (IMCO-07) ........................................... 8-35 8.13 Control Of Non-Conformances (IMCO-08) .................................................................................... 8-38 8.14 Corrective Action (IMCO-09) ........................................................................................................ 8-41 8.15 Training (IMCO-10) ....................................................................................................................... 8-43 9 TRANSPORTATION AND DISPOSAL PLAN ...................................................................... 9-1 9.1 Project Generated Waste ............................................................................................................... 9-1 9.2 On-Site Management Practices ...................................................................................................... 9-3 9.3 Onsite, Offsite, Treatment, Storage, And Disposal Methods And Facilities ..................................... 9-3 9.4 Packaging, Labeling, And Manifesting Waste Streams .................................................................... 9-4 9.5 Documentation And Permits .......................................................................................................... 9-5 9.6 Waste Handling .............................................................................................................................. 9-6 9.7 Subcontractors ............................................................................................................................... 9-6 9.8 Haul Routes And Transfer Facilities ................................................................................................ 9-8 9.9 Waste Sampling And Analysis ........................................................................................................ 9-8 10 SURVEY PLAN ............................................................................................................ 10-1 10.1 Upland and Riverbank Survey ...................................................................................................... 10-1 10.2 dredge SURVEY PLAN ................................................................................................................... 10-4 11 EXCAVATION SUPPORT SYSTEM PLAN ....................................................................... 11-1 May 28, 2013 iii Final Removal Action Work Plan Terminal 117 Cleanup Sediment & Upland Areas 11.1 Temporary Shoring & Sloping Approach ....................................................................................... 11-1 11.2 Personnel & Qualifications: .......................................................................................................... 11-3 11.3 Temporary Shoring Design Calculations & Drawings by PE ........................................................... 11-4 11.4 Equipment .................................................................................................................................... 11-4 12 CONSTRUCTION WATER MANAGEMENT PLAN ........................................................... 12-1 12.1 Purpose and Goals........................................................................................................................ 12-1 12.2 Project Description ....................................................................................................................... 12-1 12.3 Water Sources .............................................................................................................................. 12-2 12.4 Water Quality Testing and Discharge Limits ................................................................................. 12-3 12.5 Water Treatment System Design and Specifications .................................................................... 12-5 12.6 System Operation....................................................................................................................... 12-11 12.7 Maintenance, Emergency Prevention and Safety ....................................................................... 12-16 13 SETTLEMENT MONITORING PLAN .............................................................................. 13-1 13.1 Schedule and Outline ................................................................................................................... 13-1 13.2 Specifications and Installation Procedures ................................................................................... 13-1 13.3 Detailed Plan of Locations ............................................................................................................ 13-3 13.4 Details Including Casing, Covers, and Grout Backfill ..................................................................... 13-3 13.5 Manufacturer’s Certification ........................................................................................................ 13-4 13.6 Settlement Point Data .................................................................................................................. 13-4 13.7 Corrective Action Plan .................................................................................................................. 13-4 14 DEWATERING PLAN ................................................................................................... 14-1 14.1 Dewatering System Types and Locations ...................................................................................... 14-1 14.2 Arrangement of System Components ........................................................................................... 14-4 14.3 Dewatering Equipment ................................................................................................................ 14-4 14.4 Design Calculations ...................................................................................................................... 14-5 14.5 Water Treatment ......................................................................................................................... 14-5 15 EARTHWORK PLAN .................................................................................................... 15-1 15.1 Equipment for Upland & Riverbank Remediation ......................................................................... 15-1 15.2 General Loading, Handling and Disposal....................................................................................... 15-2 15.3 Phasing of Upland & Riverbank Remediation ............................................................................... 15-4 15.4 Re-Grading, Backfilling & Compacting ........................................................................................ 15-14 15.5 Confirmation Sampling and Testing ............................................................................................ 15-15 15.6 Recontamination Prevention Measures ..................................................................................... 15-15 16 SOIL STOCKPILE PLAN ................................................................................................ 16-1 16.1 Contaminated Soil Stockpile Locations ......................................................................................... 16-1 16.2 Stockpile Cell Dimensions and Construction ................................................................................. 16-2 16.3 Stockpile Management ................................................................................................................ 16-3 16.4 Loading and Trucking ................................................................................................................... 16-4 16.5 Stockpile Cleanup and Removal ................................................................................................... 16-4 16.6 Stockpile Sampling ....................................................................................................................... 16-5 17 DREDGING PLAN ........................................................................................................ 17-1 17.1 Project Description ....................................................................................................................... 17-1 17.2 Best Management Practices ......................................................................................................... 17-2 17.3 Temporary Facilities, Staging, And Access .................................................................................... 17-4 17.4 Work Sequence ............................................................................................................................ 17-5 17.5 Means And Methods .................................................................................................................... 17-5 17.6 Transload Facility & Operation ..................................................................................................... 17-8 17.7 Backfill Material Sources, Products, And Suppliers ....................................................................... 17-8 17.8 Positioning Methods And Procedures .......................................................................................... 17-9 17.9 Quantity Tracking ....................................................................................................................... 17-10 17.10 Transloading Material For Disposal ............................................................................................ 17-11 May 28, 2013 iv Final Removal Action Work Plan Terminal 117 Cleanup Sediment & Upland Areas 17.11 Schedule And Hours Of Work ..................................................................................................... 17-11 17.12 Key Personnel And Supervision .................................................................................................. 17-12 17.13 Decontamination ....................................................................................................................... 17-12 17.14 Water Quality Management ....................................................................................................... 17-13 17.15 CQA Documentation And Reporting ........................................................................................... 17-13 18 WATER QUALITY MONITORING PLAN (WQMP) .......................................................... 18-1 18.1 Introduction ................................................................................................................................. 18-1 18.2 Monitoring Plan ........................................................................................................................... 18-2 18.3 Field Sampling Plan ...................................................................................................................... 18-9 18.4 Data Reporting ........................................................................................................................... 18-10 19 DEMOLITION PLAN .................................................................................................... 19-1 19.1 Worker Safety .............................................................................................................................. 19-1 19.2 Protection of the Public ................................................................................................................ 19-1 19.3 Equipment .................................................................................................................................... 19-2 19.4 Work Sequence ............................................................................................................................ 19-2 19.5 Schedule ....................................................................................................................................... 19-4 19.6 Recycling Procedures and Waste Minimization ............................................................................ 19-5 19.7 Dust Control ................................................................................................................................. 19-6 19.8 Protection of the Environment ..................................................................................................... 19-6 19.9 Disposal Sites ............................................................................................................................... 19-6 20 DECONSTRUCTION PLAN ........................................................................................... 20-1 20.1 Deconstruction Sequence ............................................................................................................. 20-1 20.2 Qualification Data ........................................................................................................................ 20-3 20.3 Safe Deconstruction Of Buildings ................................................................................................. 20-3 20.4 Dust & Noise Control Measures ................................................................................................... 20-4 20.5 Recycling And Wastestream Analysis ........................................................................................... 20-4 20.6 Means & Methods For Handling Waste ........................................................................................ 20-6 20.7 Communication Of Deconstruction Plan ....................................................................................... 20-6 21 VESSEL MANAGEMENT PLAN ..................................................................................... 21-1 21.1 Vessel Description ........................................................................................................................ 21-1 21.2 In-Water Haul Routes ................................................................................................................... 21-1 21.3 Notifications ................................................................................................................................. 21-1 21.4 Means and Methods .................................................................................................................... 21-1 21.5 Schedule and Hours of Work ........................................................................................................ 21-2 22 SHEET PILE DRIVING PLAN ......................................................................................... 22-1 22.1 Sheet Pile Driving Plan Personnel ................................................................................................. 22-1 22.2 Materials ...................................................................................................................................... 22-1 22.3 Equipment .................................................................................................................................... 22-1 22.4 Pile Driving Schedule, Equipment, and Procedures ...................................................................... 22-2 22.5 Job Conditions and Contingency Plan ........................................................................................... 22-5 22.6 Pile Joint Sealant Installation ....................................................................................................... 22-5 22.7 Pile Driving Record ....................................................................................................................... 22-6 23 CONSTRUCTION CHECKLIST ........................................................................................ 23-1 24 CONTRACTOR’S DAILY CONSTRUCTION REPORT ......................................................... 24-1 25 REGULATED BUILDING MATERIALS PLAN .................................................................. 25-1 25.1 Site Specific Safety and Health Plan.............................................................................................. 25-1 25.2 Asbestos abatement work plan .................................................................................................... 25-7 25.3 Lead Work Plan .......................................................................................................................... 25-16 25.4 PCB Containing Fluorescent Ballast Removal and Disposal Plan ................................................. 25-21 25.5 Fluorescent Light Tubes Removal and Disposal Plan ................................................................... 25-26 May 28, 2013 v Final Removal Action Work Plan Terminal 117 Cleanup Sediment & Upland Areas APPENDICES LIST Appendix Documents Sections 1 through 25 1-1 Personnel Resumes 1-2 Communication Structure 1-3 Emergency and After-Hour Contact List 1-4 Project Staffing Plan 1-5 T-117 Site Plans 2-0 No Appendix 3-1 Hospital Route 3-2 Walk-In Clinic Route 3-3 Safety Forms 4-1 Boeing Access Ramp Design 5-0 No Appendix 6-1 Material Safety Data Sheets 6-2 Subcontractor Acknowledgement Form 6-3 Insurance, Certifications, and Licensing 6-4 GCC’s Spill Response Plan 7-1 Erosion Control Products 7-2 Wheel Wash Data 7-3 Hydroseed Data 7-4 BMP Guidelines 8-1 Subcontractor Quality Control Programs 8-2 QA/QC Forms 8-3 Quality Assurance Matrix 9-1 Lafarge Facility Operations 9-2 Transportation Forms 9-3 Disposal Permits 9-4 Haul Routes 10-1 Survey Equipment Product Data 10-2 Sound Development Group Company Profile & Insurance 10-3 Survey Data Examples 10-4 GCC’s Survey Equipment 11-1 Temporary Sheet Pile Shoring Locations & Layout 11-2 Final Design Extraction Reference Ecology Blocks & Trench Box Shoring 11-3 Design Calculations & Drawing by Austin Huang 12-1 Site Plan with Sub-Basins & Work Areas 12-2 Treatment System Site Plan 12-3 Engineering Calculations by Core Design 12-4 DOE BMP C-250 (from WWSWM) 12-5 StormKlear LiquiFloc 1% Chitosan Acetate GULD 12-6 Example of Daily Treatment Log May 28, 2013 vi Final Removal Action Work Plan Terminal 117 Cleanup Sediment & Upland Areas 12-7 Treatment System Product Data 12-8 MSDS Sheets 12-9 Northwest Soil Cement Personnel & Qualifications 13-1 Summary Table for Instrumentation 13-2 Monitoring Plan Locations 13-3 Settlement Monitoring Material Product Data 13-4 Trimble SPS930 DR+ Total Station Product Data 14-1 Dewatering System Types & Locations 14-2 Dewatering Equipment Technical Data 15-1 Dioxin/Furan Testing Locations 16-1 Soil Stockpile Construction 16-2 Stockpile Truck Management 16-3 Stockpile Material Product Data 17-1 Dredge & In-Water Work Equipment 17-2 Dewatering 17-3 Tide Gauge 17-4 Marine GPS 18-1 WQMP Monitoring Locations 18-2 Water Quality Monitoring Mechanisms 18-3 Water Quality Monitoring Product Data 18-4 Water Quality Assurance Plan 19-0 No Appendix 20-0 No Appendix 21-0 No Appendix 22-1 Sheet Pile Materials 22-2 Sheet Pile Equipment 22-3 Sheet Pile Plan 23-0 No Appendix 24-1 Contractors Daily Construction Report Forms 25-1 Regulated Building Materials Permits, Licenses, and Notifications 25-2 Regulated Building Material Personnel 25-3 Exclusion Zones, Containment Layout, & Barrier Drawings 25-4 Respiratory Protection Plan 25-5 Laboratory Qualifications 25-6 Worker Certifications May 28, 2013 vii Final Removal Action Work Plan Terminal 117 Cleanup Sediment & Upland Areas ACRONYMS AND ABBREVIATIONS ACOM Agency Construction Oversight Manager ACM Asbestos Containing Material ACSM American Congress of Surveying and Mapping AOC Administrative Order on Consent ASAOC Administrative Settlement Agreement and Order on Consent BMPs Best Management Practices BNSF Burlington Northern Santa Fe CERCLA Comprehensive Environmental Response, Compensation and Liability Act (aka superfund) CFR Code of Federal Regulations City City of Seattle COM Construction Oversight Manager Contractor IMCO General Construction CPM Contractor Project Manager CQA Construction Quality Assurance CQAP Construction Quality Assurance Plan CQC Construction Quality Control CQCR Contractor Quality Control Representative CWA Clean Water Act DAR Design Analysis Report DOT Washington Department of Transportation DTM Digital terrain model EAA Early Action Area ECI Environmental Compliance Inspector May 28, 2013 viii Final Removal Action Work Plan Terminal 117 Cleanup Sediment & Upland Areas ECM Environmental Compliance Manager Ecology Washington Department of Ecology EPA U.S. Environmental Protection Agency ESC Erosion and sediment control GAC Granular activated carbon GCC General Construction Company GPS Global positioning system GSR Green and sustainable remediation HASP Health and Safety Plan HAZWOPER Hazardous Waste Operations and Emergency Response HMTA Hazardous Material Transportation Act IMCO IMCO General Construction LDW Lower Duwamish Waterway MIT Muckleshoot Indian Tribe MLLW Mean lower low water NELAP National Environmental Laboratory Accreditation Program OHS Oil and hazardous substance PCB Polychlorinated Biphenyl PSS Project Safety Supervisor PLS Professional Land Surveyor PM Project Manager POS Port of Seattle PPE Personal protective equipment PS Project Superintendent QAO Quality Assurance Officer May 28, 2013 ix

Description:
May 28, 2013 the final Design Report (October 8, 2012) and the Conformed Bid Package (POS, November 8, 2012). The means and methods Construction Qa/Qc Manual . .. Temporary Shoring Design Calculations & Drawings by PE .
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.