ebook img

FFY 15 Boston MPO Annual Obligation Report PDF

2015·0.01 MB·English
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview FFY 15 Boston MPO Annual Obligation Report

FFY 2015 Federal Obligation Report Project ID Project Description Obligation Date Sum of Obligation 600703 LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95/ROUTE 08/24/2015 $11,909,244.00 128 (DESIGN-BUILD) 600703 LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95/ROUTE 09/23/2015 $15,212,420.00 128 (DESIGN-BUILD) 602000 WESTON- INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 30 (SOUTH AVE) & WELLESLEY 09/22/2015 $1,943,812.79 STREET 603711 NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N- 08/24/2015 $24,000,000.00 04-021, N-04-022, N-04-026, N-04-027, N-04-037 & W-13-023 (ADD-A-LANE - CONTRACT V) 604531 ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL CONSTRUCTION, INCLUDES BRIDGES, A-02- 09/22/2015 $6,316,563.49 042 & M-10-012, A-02-034 & MPB WALL 605146 SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET 09/23/2015 $7,649,672.69 TO LORING AVENUE & JEFFERSON AVENUE 605657 MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF 09/22/2015 $10,902,134.00 HIGHLAND STREET, INCLUDES REHAB OF M-13-012 605883 DEDHAM- BRIDGE REPLACEMENT, D-05-003 (33K), NEEDHAM STREET OVER GREAT DITCH 01/07/2015 $2,952,518.40 606146 CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON 09/23/2015 $42,890,682.84 DEDHAM ST/CANTON STREET, INCLUDES REPLACEMENT OF C-02-034, REHAB OF C-02-024, C- 02-002=N-25-016=W-31-002, NEW PED BRIDGES C-02-049 & C-02-050 & 3 SIGNALIZED INTERSECTIONS 606284 BOSTON- BROOKLINE- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM ARMORY 09/23/2015 $15,726,586.73 STREET TO ALCORN STREET 606889 BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS 06/30/2015 $3,181,943.20 606997 BRAINTREE- MILTON- BOSTON- WEYMOUTH- STORMWATER RETROFITS ON I-93, ROUTE 3 & 06/18/2015 $1,296,359.82 ROUTE 18 607174 CHELSEA- REVERE- MALDEN- SAUGUS- RESURFACING & RELATED WORK ON ROUTE 1 03/20/2015 $9,206,568.80 607209 SOMERVILLE- CAMBRIDGE- RECONSTRUCTION OF BEACON STREET, FROM OXFORD STREET 08/17/2015 $2,294,912.90 TO CAMBRIDGE C.L. 607273 FRANKLIN- PEDESTRIAN BRIDGE CONSTRUCTION, F-08-005, OLD SR 140 OVER MBTA/CSX 09/04/2015 $1,202,057.65 607338 GLOUCESTER- BRIDGE PRESERVATION, G-05-017, ROUTE 128 OVER ANNISQUAM RIVER 11/24/2014 $1,651,539.20 (PHASE II) 607497 BOSTON- MILTON- SYSTEMATIC MAINTENANCE & STRUCTURAL REPAIRS TO 7 BRIDGES 10/16/2014 $1,562,492.80 ALONG THE I-93/ US 1/ST 3 607700 DISTRICT 4- HIGHWAY LIGHTING BRANCH CIRCUIT RE-CABLING, FROM SIX (6) LIGHTING LOAD 12/30/2014 $1,344,543.84 CENTERS ALONG ROUTE I-95 (128), FROM LEXINGTON TO WOBURN 607839 MEDFORD- CLIPPERSHIP DRIVE PARK CONSTRUCTION 05/27/2015 $474,686.00 607891 BEVERLY- RESURFACING AND RELATED WORK ON ROUTE 128 12/04/2014 $4,750,728.92 607892 SOMERVILLE- IMPROVEMENTS AT HEALEY SCHOOL (SRTS) 09/22/2015 $757,887.20 607920 MILTON- IMPROVEMENTS AT GLOVER ELEMENTARY SCHOOL IN THE VICINITY OF CANTON 09/23/2015 $1,017,850.30 AVENUE, BROOKS ROAD AND VOSES LANE (SRTS) 608019 NHP-002S(810), BOSTON-ADVANCED UTILITY RELOCATIONS FOR BR.# B-16-237, 05/01/2015 $5,258,756.80 MASSACHUSETTS AVE.(RT. 2A) / COMMONWEALTH AVE.(EARLY ACTION) 608068 BURLINGTON- ADAPTIVE TRAFFIC CONTROL SIGNAL SYSTEM INSTALLATION ON CAMBRIDGE 09/23/2015 $1,555,656.80 STREET, MIDDLESEX TURNPIKE & BURLINGTON MALL ROAD 608131 DANVERS- MEDFORD- STORMWATER IMPROVEMENTS ALONG ROUTE 1, I-95, I-93 09/23/2015 $2,546,180.93 ISA DCR STP-002S(814)X, Watertown-Waltham - ISA with DCR for final scope of the Phase 3C Upper Charles 05/08/2015 $297,461.33 River Restoration SB-2012-MA-05 SBP-1(205) - Essex Coastal Secenic byway information kiosks. 08/31/2015 $296,000.00 Grand Total $178,199,261.43 Federal Aid Programming and Reimbursement Office MassDOT November 18, 2015

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.