EDI Aeration/Mixing Equipment Typical Installation, Operation, & Maintenance Manual For: Mapocho, Chile FlexAir® 9-inch Disc Diffusers with Integral Saddle Mount (ISM) Date: May 28, 2010 EDI Aeration/Mixing Systems Project Special Notes Notice This document and all information contained within is the property of Environmental Dynamics Inc. This document is submitted under a confidential relationship specifically for the recipient's use on a designated project. Reproduction of this document or use of its contents in whole or in part without the written permission of EDI is prohibited. Information included in this manual is typical and for informational purposes only. Actual content shall be confirmed during the submittal process. Table of Contents Storage Instructions ....................................................................................................................... 1 Receiving Inspection ............................................................................................................................................. 1 Pre-Installation Storage Requirements for Plastic Piping .................................................................................... 1 Pre-Installation Storage Requirements for a Flexible Membrane System ............................................................ 1 Post-Installation Storage Requirements for a Flexible Membrane System .......................................................... 1 Installation Instructions ................................................................................................................ 3 Air Piping Installation ........................................................................................................................................... 3 Slotted Flange Installation..................................................................................................................................... 3 Super-Strut™ GFPP Pipe Support Installation Instructions ..................................................................................4 Rigid/Simple Pipe Support Installation Instructions ............................................................................................. 4 Leveling of Air Piping .......................................................................................................................................... 9 Installation of the Manual Purge Assembly .......................................................................................................... 9 Optional Water Flush and Air Purge Cleaning of Piping .................................................................................... 10 Installation Instructions for 9 Inch Disc Diffuser Units with ISM ..................................................................... 11 Start-Up Instructions ................................................................................................................... 14 General Aeration/Mixing Systems Start-Up Instructions .................................................................................... 14 Blower Components ............................................................................................................................................ 14 General Air Piping .............................................................................................................................................. 14 Initial System Start-Up ........................................................................................................................................ 14 Safety Considerations .................................................................................................................. 16 Personal Protection Measures ............................................................................................................................. 16 Personal Protective Equipment ........................................................................................................................... 17 Confined Space Hazard ....................................................................................................................................... 17 Operation Instructions ................................................................................................................. 18 Description of the Aeration-Mixing System ....................................................................................................... 18 Normal Operation of the Aeration System .......................................................................................................... 18 Normal Operation of the Blower System ............................................................................................................ 18 Shutdown Conditions .......................................................................................................................................... 18 Operation of the Diffuser Unit ............................................................................................................................ 19 Normal Operation of the Manual Purge Assembly ............................................................................................. 19 Corrective Maintenance ............................................................................................................... 20 Troubleshooting .................................................................................................................................................. 20 Replacing FlexAir Disc Diffuser Membrane ...................................................................................................... 20 Replacing Saddle Mounted Diffuser Assembly .................................................................................................. 21 Manufacturer Services ................................................................................................................. 23 Warranty Statement ............................................................................................................................................. 23 Diffuser Express® ............................................................................................................................................... 24 EDI Aeration/Mixing Systems Storage Storage Instructions Receiving Inspection If the pipe components are to be stored for more than 6 months, pipe sections are to be shaded (FOB EDI only) Shipments shall be inspected from sunlight. for damage upon receipt. The recipient/receiver is responsible for all damages. EDI offers to act Accessories such as pipe supports, fasteners, on behalf of the recipient / receiver in filing a etc., packaged in original boxes are to be claim for damage incurred during shipment. To protected from excessive moisture and rain. file a claim against the freight company, a Outdoor storage is acceptable provided the damage report must be submitted to EDI within ambient air temperature is below 140°F (60°C). 24 hours of delivery. Small items should be stored in a secure location (FOB Jobsite only) Shipments shall be inspected to avoid misplacement and theft. for damage upon receipt. Any damages Pre-Installation Storage observed upon receipt must be reported to EDI within 24 hours of delivery. EDI will repair or Requirements for a Flexible replace damaged goods when notified within Membrane System this notification period. Diffuser components packaged in original crates (Ex-Works only) Shipments shall be inspected and/or cardboard boxes may be stored outdoors for damage upon receipt. The recipient/receiver provided the ambient air temperature is below is responsible for all damages. To file a claim 100°F (40°C). In the case of components that against the freight company, file a damage are received in cardboard packaging, these report directly with the shipping company. packages must be protected against excessive A full inventory of shipped components shall be moisture and rain to maintain package integrity. completed within 14 days of the receipt of If the ambient air temperature exceeds 100°F shipment. Any deficiencies in the shipment that (40°C), then containers shall be shaded or stored are clearly deemed to be the result of EDI will indoors in which the ambient air temperature be reconciled by EDI when notified within this does not exceed 125°F (52°C). time period. Storage of diffuser membrane components shall Pre-Installation Storage be limited to one year. Requirements for Plastic Piping Post-Installation Storage PVC, CPVC and ABS piping components may Requirements for a Flexible be stored outdoors provided the ambient air Membrane System temperature is below 140°F (60°C). Pipe sections are furnished with end caps to When the reactor is drained and the aeration minimize the entry of foreign materials (dirt, system is exposed for a short period of time (less debris, etc.) into the pipe. Any foreign materials than 4 to 6 weeks), the system shall be protected that are allowed to contaminate the pipe will from foreign objects including but not limited to need to be removed from the system prior to paint or weld splatter, falling objects, etc. installation and start-up. If the ambient air temperature is above Piping shall be stored on a flat surface to avoid 100°F (40°C), the system should be shaded damaging the pipe sections. to protect the system from UV light and excessive heat. A gray fabric tarp is recommended to shade the aeration components. The gray fabric tarp is to be Page 1 EDI Aeration/Mixing Systems Storage suspended above the aeration system by airflow condition until the ice is no longer approximately 6” (150 mm) to prevent present. damage to the system. The water level should never be lowered if Note: Do not use any form of plastic to ice is present. The weight of the ice may cover the aeration components. Plastic damage the system. can create a hotter environment and/or When the aeration system is to be idle for an fuse to the surface of the diffusers. extended period time (greater than 4 to 6 weeks) When the aeration system is to be idle for an and the units are going to be removed and extended period time (greater than 4 to 6 weeks), stored, then the following storage conditions the system should be submerged in would apply. approximately 4 feet of clean water provided the If the ambient air temperature is going to be ambient air temperature is greater than 32°F less than 100°F (40°C), then a fabric tarp is (0°C). recommended to cover the equipment. If the ambient air temperature is below 32°F If the ambient air temperature exceeds (0°C), the water level may need to be 100°F (40°C), then the equipment shall be increased so that the ice layer does not shaded or stored indoors in which the contact the aeration system. ambient air temperature does not exceed When reactivating a system where ice exists, 125°F (52°C). operate the system at a minimum airflow to avoid movement of ice and maintain this Page 2 EDI Aeration/Mixing Systems Installation Installation Instructions Air Piping Installation segment. All arrows should point away from the header toward the lateral end at final installation. The Contractor is to confirm that the air piping is clean during fabrication of laterals and should Slotted Flange Installation swab out any debris found in the pipe before 1) Lateral piping is connected with slotted installing the diffuser units. Dirt and debris may flanges and supported by partially clog the diffuser unit requiring an extended start- assembled pipe supports. up procedure and MAY require the Contractor to remove and replace diffuser unit at 2) Gaskets and stainless steel fasteners are Contractor's expense. If piping requires further provided by EDI for flanged connections. cleaning before diffuser installation, Contractor Recommended bolt-tightening torque values may elect to perform water flush or air purge are indicated in torque table on Flange procedures described at the conclusion of this Installation Detail Drawing. section. NOTE: If this procedure is performed, 3) An industrial grade anti-seize lubricant do so before installing the diffusers. MUST be used on stainless steel bolt threads Transition from the drop pipe to the air lateral to prevent galling. Contractor will be piping is made by a stainless steel coupling responsible for replacement of all damaged clamp provided by EDI. The aeration system items resulting from not using anti-seize typically features a drop stub designed to be lubricant. field cut to length and solvent welded to the air 4) Lay out sections of pipe to be joined in laterals by Contractor. The pipes must be order, making sure orifices are correctly aligned vertically prior to installing the coupling oriented (at top centerline for top-mounted clamp or the clamp may leak. The clamp has diffusers, at bottom centerline for bottom- limited ability to seal misaligned piping. Also, mounted diffusers). Flow arrows and labels the gap between the drop pipe and drop stub on pipe correspond to labels on layout shall be less than 0.25”(6.5 mm) to ensure drawing. Use the centerline marked on pipe proper sealing of the coupling clamp. and flanges to assist in orientation. Assemble the aeration piping per the EDI layout 5) Align flange with gasket and flange to be drawing. Start with the drop pipe section to connected. Elongated bolt slots through ensure proper drop pipe alignment. Pipe flange allow for slight adjustments. supports should be partially assembled with the bottom pipe strap, then placed under the drop 6) Place one 5/16” flat washer on each 5/16” pipe section for support. Pipe support assembly 304 S.S. bolt, then place bolts through bolt instructions are in the following section. See the slots in first flange. Place gasket over ends EDI layout drawing for pipe support locations. of bolts. Do not install the anchor bolts until the final alignment is established for the complete aeration grid. The remaining air lateral piping shall be installed using this same method. All piping segments will be labeled with a sequence number that indicates that segment’s position in the lateral run. Additionally, EDI will provide an arrow on the lateral piping. This arrow indicates the direction of airflow in the lateral Page 3 EDI Aeration/Mixing Systems Installation 7) Carefully join flanges, until all bolts project 9) When all bolt assemblies have been through corresponding bolt slots in the correctly positioned, torque nuts to 5 ft-lbs. second flange. Bolt assemblies must be tightened in the sequence shown on Flange Installation Detail Drawing. 10) As lateral sections are assembled, maintain correct alignment of the orifices on the lateral so that diffusers will be level when installed. 11) If the specifications require the system to be pressure or leak tested, all openings are to be plugged before the system is tested. EDI recommends not exceeding 10 psi during pressure or leak testing. Super-Strut™ GFPP Pipe Support Installation Instructions 8) Place a second 5/16” flat washer onto each bolt, then a 5/16” lock washer, then place The lateral piping is supported by Glass Filled the S.S. nut LOOSELY on bolt to complete Polypropylene support assemblies (provided by bolt assembly (do not tighten at this time). EDI). Repeat for remaining bolt assemblies around flange. Page 4 EDI Aeration/Mixing Systems Installation 2 in. of exposure. Anchors should be placed as shown on layout drawing. 2) Temporarily assemble support to measure the height to center line of the lateral piping. EDI’s Super Strut™ supports are packaged If the lateral pipe is more than 7 ½” C/L the assembled with the standard height base. extended base is required. When using the extended base, the standard base is unthreaded from the support assembly and discarded. To maintain proper clearance for the diffuser mount, EDI recommends a minimum distance of four inches between any outlet hole and pipe support. When a support must be relocated due 3) The extension base can be field cut to match to the support clearance indicated, shorten rather site conditions with a hack saw (or similar). than lengthen the support spacing. See EDI The extended base has molded in marks layout drawing for proper pipe support spacing every two inches for ease of field measuring. and locations. Be sure to leave enough tolerance for an inch of vertical adjustment. Minimum 1) Drill hole for the anchor as vertical as engagement of base into saddle cradle is two possible and insert anchor. To assure full threads. Clean burrs from around cut for holding power, do not ream the hole or ease of threading into saddle. allow the drill to wobble. Then clean the hole to ensure proper performance. Make sure to get at least 3 in. of embedment, with Page 5 EDI Aeration/Mixing Systems Installation the slope. The pipe will fit within the lip under support base. 4) Place extension base over 3/8 anchor stud. Next slide the 3/8”x1” S.S. flat washer over the anchor stud until it rests on the support 8) Place the lateral on the supports and make base. Place the 3/8” lock washer on the flat connections to header or subheader as washer then thread the 3/8” nut onto anchor required. Level pipe by lifting and rotating stud and torque to 20 ft-lbs. support cradle or by loosening the anchor nut and spinning the base. Be sure to Recommended Bolt/Nut Torque Values retighten the anchor if this method is chosen. Bolt Sizes Torque 3/8 inch (10 mm) 20 ft-lb (27 N-m) 9) Once leveled, slide the upper locking clamp on the support. This is accomplished by squeezing the KLIKLOK™ connection tabs on the lower cradle and sliding the clamp 5) Thread lower support cradle portion onto over the tabs by hand. Slide clamp unit it support base to match previously determined can no longer be moved and releases the C/L of lateral piping. Note: this must be tabs. Do not use any hammer or mallet to threaded 2 full turns onto support base to install the upper clamp. maintain support integrity. 6) Use a laser in the basin to adjust the threaded cradle of the SuperStrut to the field elevation. 7) Note: For sloped floors, 2” (50mm) PVC pipe shall be cut and used to accommodate Page 6 EDI Aeration/Mixing Systems Installation Rigid/Simple Pipe Support Installation Instructions Air laterals are anchored to the basin floor by stainless steel pipe support assemblies (provided by EDI). To maintain proper clearance for the diffuser mount, EDI recommends a minimum distance of four inches between any outlet hole and a pipe strap. When a support must be relocated due to the support clearance indicated, shorten rather than lengthen the support spacing. See EDI layout drawing for proper pipe support spacing and locations. 1) Connect floor mount to support bracket with When properly installed the tabs will extend one 3/8” x 1 1/4” (~9.5mm x ~32mm) beyond the upper clamp. stainless steel bolt and double 3/8” (~9.5mm) stainless steel nuts (See Installation Detail B). the slotted side of the floor mount is to the floor when properly assembled. Rest the double nuts against the support bracket and lock against each other. Page 7
Description: