ebook img

Draft Accident Prevention Plan Remedial Action Construction Remediation of Contaminated Soil ... PDF

278 Pages·2012·11.06 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Draft Accident Prevention Plan Remedial Action Construction Remediation of Contaminated Soil ...

Draft Accident Prevention Plan Remedial Action Construction Remediation of Contaminated Soil and Sediment Plum Brook Ordnance Works – TNT Area C Sandusky, Ohio Contract Number: W91237-10-C-0002 Prepared for: Department of the Army Huntington District, Corps of Engineers 502 Eighth Street Huntington, West Virginia 25701 Prepared by: TMG Services, Inc. 240 Oliver Street, Suite 1 St. Albans, West Virginia 25177 Phone: (304) 722-6015 Fax: (304)722-6017 TMG Project Number: TMG 09-22 May 2010 Draft Accident Prevention Plan Remedial Action Construction Remediation of Contaminated Soil and Sediment Plum Brook Ordnance Works – TNT Area C Sandusky, Ohio Contract No. W91237-10-C-0002 TABLE OF CONTENTS Section Page No. ACRONYMS AND DEFINITIONS iv 1.0 SIGNATURE SHEE T 1 2.0 PLAN COMPLIANCE AGREEMENT 2 3.0 BACKGROUND INFORMATION 4 3.1 Contractor 4 3.2 Contract Numbe r 4 3.3 Project Name 4 3.4 Project Descri ption 4 4.0 STATEMENT OF SAFETY AND HEALTH POLICY 5 5.0 RESPONSIBILITY AND LINES OF AUTHORITIES 6 5.1 Responsibility 6 5.2 Lines of Authority 8 5.3 Enforcement and Disciplinary Actions 8 6.0 SUBCONTRACTS AND SUPPLIERS 10 6.1 Identification of Subcontractors and Suppliers 10 6.2 Subcontractor and Supplier Safety Coordination 10 6.3 Safety Responsibilities of Subcontractors and Suppliers 11 7.0 TRAINING 12 7.1 Safety Educa tion 12 7.2 Mandatory Training and Certificates 13 Draft Accident Prevention Plan Remedial Action Construction Contract Number: W91237-10-C-0002 Page i 7.3 Emergency Response Training 13 8.0 SAFETY AND HEALTH INSPECTIONS 14 9.0 ACCIDENT REPORTING 14 10.0 PLANS (PROGRAMS, PROCEDURES) REQUIRED BY 15 THE SAFETY MANUAL 10.1 Layout Plans 15 10.2 Emergency Response Plans 15 10.2.1 Procedures and Tests 15 10.2.2 Spill Plans 15 10.2.3 Firefighting Plans 16 10.2.4 Posting of Emergency Telephone Numbers 16 10.2.5 Man Overboard/Abandon Ship 16 10.2.6 Medical Support 16 10.3 Plan for Prevention of Alcohol and Drug Abuse 16 10.4 Site Sanitation Plan 16 10.5 Access and Haul Road Plan 17 10.6 Respiratory Protection Plan 17 10.7 Health Hazard Control Program 17 10.8 Hazard Communication Program 17 10.9 Process Safety Management Plan 17 10.10 Lead Abatement Plan 17 10.11 Asbestos Abatement Plan 18 10.12 Radiation Safety Program 18 10.13 Abrasive Blasting Plan 18 10.14 Heat/Cold Stress Monitoring Plan 18 10.15 Crystalline Silica Monitoring Plan 18 10.16 Night Operations Lighting Plan 18 10.17 Fire Preven tion Plan 18 10.18 Wild Land Fire Management Plan 19 10.19 Hazardous Energy Control Plan 19 10.20 Critical Lift Pl an 19 10.21 Contingency Plan for Severe Weather 19 10.22 Float Plan 19 10.23 Site-Specific Fall Protection and Prevention Plan 19 10.24 Demolition Plan 19 10.25 Excavation/Trenching Plan 20 10.26 Emergency Rescue Plan 20 10.27 Underground Construction Fire Prevention and Protection Plan 20 10.28 Compressed Air Pla n 20 10.29 Formwork and Shoring Erection and Removal Plans 20 10.30 Pre-Cast Concrete Plan 20 Draft Accident Prevention Plan Remedial Action Construction Contract Number: W91237-10-C-0002 Page ii 10.31 Lift Slab P lan 20 10.32 Steel Erection Plan 21 10.33 Site Safety and Health Plan 21 10.34 Blasting Safety Plan 21 10.35 Diving Plan 21 10.36 Confined Space Program 21 11. RISK MANAGEMENT PROCESSES 21 Appendices Appendix A Site-Specific Safety and Health Plan Appendix B USACE Required Forms Appendix C TMG Organizational Chart Appendix D TMG Safety Manual Appendix E Quality Control Documentation Draft Accident Prevention Plan Remedial Action Construction Contract Number: W91237-10-C-0002 Page iii ACRONYMS AND DEFINITIONS APP Accident Prevention Plan CFR Code of Federal Regulations COC Contaminant of Concern CPR Cardio-Pulmonary Resuscitation CY Cubic Yards DERP Defense Environmental Restoration Program HAZWOPER Hazardous Waste Operations and Emergency Response NASA National Aeronautics and Space Administration OEPA State of Ohio Environmental Protection Agency OSHA Occupational Safety and Health Administration PBOW Plum Brook Ordnance Works POC Point of Contact PPE Personal Protective Equipment QCO Quality Control Officer QCP Quality Control Plan OSHA Occupational Safety and Health Administration RA-C Remedial Action Construction RI/FS Remedial Investigation/Feasibility Study SSHO Site Safety and Health Officer SSHP Site-Specific Safety and Health Plan Draft Accident Prevention Plan Remedial Action Construction Contract Number: W91237-10-C-0002 Page iv TMG TMG Services, Inc. TNTC TNT Area C USACE United States Army Corps of Engineers Draft Accident Prevention Plan Remedial Action Construction Contract Number: W91237-10-C-0002 Page v 1.0 SIGNATURE SHEET Draft Accident Prevention Plan Remedial Action Construction Remediation of Contaminated Soil and Sediment Plum Brook Ordnance Works – TNT Area C Sandusky, Ohio Contract Number: W91237-10-C-0002 May 2010 This Accident Prevention Plan has been reviewed and accepted for implementation by TMG Services, Inc. Applicability extends to all employees, subcontractors, and visitors. This plan assigns responsibilities and establishes standard operating procedures for field personnel working on this United States Corps of Engineers project. PLAN ACCEPTANCE 5/6/2010 ________________________________________ ________________________ Rodney Bumgardner, Vice President Date 5/6/2010 ________________________________________ ________________________ 5/6/2010 ________________________________________ ________________________ Matthew Ford, APP Preparer Date Draft Accident Prevention Plan Remedial Action Construction Contract Number: W91237-10-C-0002 Page 1 2.0 PLAN COMPLIANCE AGREEMENT I have read and understand this Accident Prevention Plan and all documents included by reference. I will comply with the provisions contained herein. Name (Printed) Organization Signature Date ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ Draft Accident Prevention Plan Remedial Action Construction Contract Number: W91237-10-C-0002 Page 2 PLAN COMPLIANCE AGREEMENT – CONTINUED Name (Printed) Organization Signature Date ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ ________________ ________________ _______________ __________ Draft Accident Prevention Plan Remedial Action Construction Contract Number: W91237-10-C-0002 Page 3 3.0 BACKGROUND INFORMATION 3.1 Contractor TMG Services, Inc. (TMG) 3.2 Contract Number W91237-10-C-0002 3.3 Project Name Remedial Action Construction (RA-C) Remediation of Contaminated Soil and Sediment Plum Brook Ordnance Works (PBOW) – TNT Area C (TNTC) Sandusky, Ohio 3.4 Project Description The purpose of this contract is for the remediation of soil and sediment within TNTC of the PBOW site, located in Sandusky, Ohio. USACE is the responsible authority under the Defense Environmental Restoration Program (DERP) at the former TNTC. Based on the results of the completed Remedial Investigation/Feasibility Study (RI/FS) for soils and sediment, the USACE will conduct a RA-C in the TNTC. The remediation will be performed to prevent human exposure to the site soil and sediment containing any of the 13 contaminants of concern (COCs) for soils and 3 COCs for sediment at concentrations that exceed remediation goals. The remediation goals are chemical- and receptor-specific risk based remedial criteria that capture all the exposure assumptions and toxicological data used in the risk assessment. The RA-C will consist of the excavation of approximately 9,205 cubic yards (cy) of material, backfilling of the excavation pit with clean material, treatment by alkaline hydrolysis and/or composting (if necessary), ex situ chemical stabilization (if necessary), and on-site/off-site disposal. The remediation is protective of human health and the environment, complies with Federal and State of Ohio Environmental Protection Agency (OEPA) requirements that are either applicable or relevant and appropriate to the remedial action, is cost effective, utilizes permanent solutions and treatment of resource recovery technologies to the maximum extent practicable, and satisfies the requirement for treatment as a principle element of the remedy. No soil or sediment contaminants will be left at levels to which direct exposure would be considered unacceptable by the OEPA. The remediation of soil and sediment represents the removal of a potential source of future groundwater contamination. Draft Accident Prevention Plan Remedial Action Construction Contract Number: W91237-10-C-0002 Page 4

Description:
The Plan of Operations (TMG, May 2010) provides complete details of the . should be handled according to the following progressive discipline primarily situated in Perkins and Oxford Townships, the eastern edge of the site
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.