ebook img

Dewberry Architects Inc. 009001 PDF

355 Pages·2017·8.87 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Dewberry Architects Inc. 009001

April 24, 2017 BIDDING AND CONTRACT REQUIREMENTS Document 009001 – Addendum No. 1 Dewberry Architects Inc. 401 SW Water Street, Suite 701 Peoria, IL 61602 TO: PROSPECTIVE BIDDERS Dewberry Architects Inc. Project No. 50064106 04/24/2017 EXP 11/30/2018 RE: ADDENDUM NO. 1 TO THE BID DOCUMENTS FOR Illinois State University – Bone Student Center Revitalization This Addendum is part of the bidding and contract documents and modifies the original bid documents dated March 09, 2017. Acknowledge receipt of this Addendum in space provided on the Bid Form. FAILURE TO DO SO MAY SUBJECT BIDDER TO DISQUALIFICATION. I. PROJECT MANUAL A. Document 079500 – EXPANSION CONTROL 1. Paragraph 2.2 ARCHITECTURAL JOINT SYSTEMS, GENERAL ADD “B. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Architectural Art Mfg., Inc. 2. Balco, Inc. 3. Construction Specialties, Inc. 4. InPro Corporation. 5. MM Systems Corporation. 6. Watson Bowman Acme Corp.” 2. Paragraph 2.3 ARCHITECTURAL JOINT SYSTEMS FOR BUILDING INTERIORS DELETE “A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Architectural Art Mfg., Inc. 2. Balco, Inc. 3. Construction Specialties, Inc. 4. InPro Corporation. 5. MM Systems Corporation. 6. Watson Bowman Acme Corp.” Dewberry Architects Inc. 009001 - 1 Addendum 1 2. Paragraph 2.4.A.1. Manufacturer REVISE: “1. Manufacturer: Subject to compliance with requirements, provide products by the following: Basis of Design:” B. Document 087100 - DOOR HARDWARE 1. REPLACE specification section 087100 “Door Hardware” in its entirety. See Attachment Specification Section 087100 – DOOR HARDWARE C. Document 095426 – LINEAR WOOD CEILING 1. Paragraph 2.1A. Linear Wood Panel System REVISE “A. Linear Wood Panel System: Provide manufacturer's standard linear wood panel system of configuration indicated. 7. Custom Wood Planks: As Indicated in the Finish Schedule on Drawings. 8. Core: Fire retardant particle board. 9. Veneer Species: Maple 1. Basis-of-Design Product: Subject to compliance with requirements, provide Armstrong World Industries, Inc.; Woodworks Linear 6640W1-NLC or a comparable product by one of the following: a. Hunter Douglas Architectural Products, Inc.; Linear Wood Open. b. Rulon Company; Linear Open Style.” D. Document 096513 – RESILIENT BASE AND ACCESSORIES 1. REPLACE specification section 096513 “Resilient Base and Accessories” in its entirety. See Attachment Specification Section 096513 – RESILIENT BASE AND ACCESSORIES E. Document 102239 – FOLDING PANEL PARTITIONS 1. Paragraph 2.3 D Horizontal Bottom Seals REVISE “1. Automatically Operated for Acoustical Panels: Extension and retraction of bottom seal automatically operated by movement of partition, with operating range not less than 1 inch (25 mm) 2 inch (50 mm) between retracted seal and floor finish.” F. Document 114000 – FOODSERVICE EQUIPMENT 1. REPLACE specification section 114000 “Foodservice Equipment” in its entirety. See Attachment Specification Section 114000 – FOODSERVICE EQUIPMENT G. Document 230900 – CONTROLS Dewberry Architects Inc. 009001 - 2 Addendum 1 1. Paragraph 2.1 Acceptable Manufacturers DELETE “Johnson Controls and Dynamic Controls, Inc.” 2. Paragraph 2.24 D. 1. a. 7) ADD “Kele, Honeywell, Johnson Controls as Acceptable Manufacturers.” H. Document 232218 – STEAM AND STEAM CONDENSATE SPECIALITIES 1. Paragraph 2.2 Pressure Reducing Valve ADD “Spence Type D and Hoffman Series 2000.” I. Document 232500 – CHEMICAL (WATER) TREATMENT 1. Paragraph 2.3 B. Water Meter REVISE “Water Meter: (Heating Water System) Positive displacement type meter with bronze housing. ¾” meter size. Meter to handle ½ - 30 GPM.” J. Document 260933 – LIGHTING CONTROL SYSTEMS 1. REPLACE specification section 260933 “Lighting Control Systems” in its entirety. See Attachment Specification Section 260933 – LIGHTING CONTROL SYSTEMS K. Document 321400 - UNIT PAVING FOR LANDSCAPE APPLICATIONS 1. REPLACE specification section 321400 “Unit Paving for Landscape Applications” in its entirety. See Attachment Specification Section 321400 – UNIT PAVING FOR LANDSCAPE APPLICATIONS 2. Paragraph 2.2.1.A.2. ADD “Option 2: Manufacturer: Whitacre Greer Product: Clay Brick ADA detectable warning paver Size: 2-3/4” x 4” x 8” Rating: Vehicular Color: Premium color mix. Final selection to be determined via mockup with Landscape Architect and Owner’s Representative. Option 3: Manufacturer: Belden Brick Product: Clay Brick ADA detectable warning paver Size: 2-3/4” x 4” x 8” Rating: Vehicular Color: Premium color mix. Final selection to be determined via mockup with Landscape Architect and Owner’s Representative.” Dewberry Architects Inc. 009001 - 3 Addendum 1 3. Paragraph 2.2.1.C.2. ADD “Option 2: Manufacturer: Hanover Product: Detectable Warning ADA Paver Size: 2-3/4” x 24” x 24” Spacing: ADA-2 Rating: Vehicular Color: yellow Option 3: Manufacturer: Tiletech Product: Detectable Warning ADA Paver Size: 2” x 12” x 24” Spacing: ADA-2 Rating: Vehicular Color: Penny Lane 4. Paragraph 2.2.2.1 ADD “Option 2: Manufacturer: Aker Stone Product: Handicapped Parking Kit Website:http://europeanpaverssouthwest.com/paver/handicapped- parking-kit/ Option 3: Manufacturer: Alphabet Signs Product: Handicap Parking Stencil, Paint to Match Parking Stall Specification, Refer to Civil Website: https://www.alphabetsigns.com/signs/handicap-parking-stencil- 39-inch-international-standard.html II. DRAWINGS A. Drawing L002-1 - OVERALL SITE PLAN 1. The salvaged sculpture re-install location has been revised. REISSUE drawing L002-1 in its entirety. See attached drawing L002-1. B. Drawing L304-1D - LAYOUT PLAN – ENLARGEMENT D 1. The salvaged sculpture re-install location has been revised. REISSUE drawing L304-1D in its entirety. See attached drawing L304-1D. C. Drawing L404-1D - MATERIALS PLAN – ENLARGEMENT D 1. The salvaged sculpture re-install location has been revised. REISSUE drawing L404-1D in its entirety. See attached drawing L404-1D. D. Drawing S000 – GENERAL STRUCTURAL NOTES Dewberry Architects Inc. 009001 - 4 Addendum 1 1. REISSUE drawing S-000 in its entirety. See attached drawing S000. E. Drawing S110-1A – FOUNDATION PLAN – PHASE 01 – AREA A 1. REISSUE drawing S110-1A in its entirety. See attached drawing S110-1A. F. Drawing S110-1B – FOUNDATION PLAN – PHASE 01 – AREA B 1. REISSUE drawing S110-1B in its entirety. See attached drawing S110-1B. G. Drawing S110-1C – FOUNDATION PLAN – PHASE 01 – AREA C 1. REISSUE drawing S110-1C in its entirety. See attached drawing S110-1C. H. Drawing S120-1A – SECOND FLOOR FRAMING PLAN – PHASE 01 – AREA A 1. REISSUE drawing S120-1A in its entirety. See attached drawing S120-1A. I. Drawing S120-1B – SECOND FLOOR FRAMING PLAN – PHASE 01 – AREA B 1. REISSUE drawing S120-1B in its entirety. See attached drawing S120-1B. J. Drawing S120-1C – SECOND FLOOR FRAMING PLAN – PHASE 01 – AREA C 1. REISSUE drawing S120-1C in its entirety. See attached drawing S120-1C. K. Drawing S130-1A – LOW ROOF FRAMING PLAN – PHASE 01 – AREA A 1. REISSUE drawing S130-1A in its entirety. See attached drawing S130-1A. L. Drawing S130-1B – LOW ROOF FRAMING PLAN – PHASE 01 – AREA B 1. REISSUE drawing S130-1B in its entirety. See attached drawing S130-1B. M. Drawing S130-1C – LOW ROOF FRAMING PLAN – PHASE 01 – AREA C 1. REISSUE drawing S130-1C in its entirety. See attached drawing S130-1C. N. Drawing S140-1C – HIGH ROOF FRAMING PLAN – PHASE 01 – AREA C 1. REISSUE drawing S140-1C in its entirety. See attached drawing S140-1C. O. Drawing S110-2 – FOUNDATION PLAN – PHASE 02 - OVERALL 1. REISSUE drawing S110-2 in its entirety. See attached drawing S110-2. P. Drawing S120-2 – SECOND FLOOR FRAMING PLAN – PHASE 02 – OVERALL 1. REISSUE drawing S120-2 in its entirety. See attached drawing S120-2. Q. Drawing S300 – STRUCTURAL FOUNDATION DETAILS 1. REISSUE drawing S300 in its entirety. See attached drawing S300. Dewberry Architects Inc. 009001 - 5 Addendum 1 R. Drawing S301 – STRUCTURAL FOUNDATION DETAILS 1. REISSUE drawing S301 in its entirety. See attached drawing S301. S. Drawing S302 – STRUCTURAL FOUNDATION DETAILS 1. REISSUE drawing S302 in its entirety. See attached drawing S302. T. Drawing S303 – STRUCTURAL FOUNDATION DETAILS 1. REISSUE drawing S303 in its entirety. See attached drawing S303. U. Drawing S400 – STRUCTURAL FRAMING DETAILS 1. REISSUE drawing S400 in its entirety. See attached drawing S400. V. Drawing S401 – STRUCTURAL FRAMING DETAILS 1. REISSUE drawing S401 in its entirety. See attached drawing S401. W. Drawing S402 – STRUCTURAL FRAMING DETAILS 1. REISSUE drawing S402 in its entirety. See attached drawing S402. X. Drawing S403 – STRUCTURAL FRAMING DETAILS 1. REISSUE drawing S403 in its entirety. See attached drawing S403. Y. Drawing S404 – STRUCTURAL FRAMING DETAILS 1. REISSUE drawing S404 in its entirety. See attached drawing S404. Z. Drawing S405 – STRUCTURAL FRAMING DETAILS 1. REISSUE drawing S405 in its entirety. See attached drawing S405. AA. Drawing S410 – COLUMN SCHEDULE 1. REISSUE drawing S410 in its entirety. See attached drawing S410. BB. Drawing S503 – STRUCTURAL STANDARD DETAILS 1. REISSUE drawing S503 in its entirety. See attached drawing S503. CC. Drawing A114-1B – LEVEL 01 FINISH PLAN – PHASE 01 – AREA B 1. NOTE: FINISH LIST IS COMPRISED OF 3 PALETTE OPTIONS INDICATED AS: A, B, AND C. EACH PALETTE OPTION MUST BE COORDINATED SOLELY WITHIN THAT PALETTE OPTION. PALETTE OPTIONS CANNOT BE MIXED, AS INDICATED ON THE FINISH DRAWINGS. Dewberry Architects Inc. 009001 - 6 Addendum 1 DD. Drawing A111-1C – LEVEL 01 ANNOTATION PLAN – PHASE 01 – AREA C 1. REVISE plan layout of Storage room 109G and Door 109G. Refer to Attachment ADD#1 ASK-001. 2. REVISE food venue scope area. Refer to Attachment ADD#1 ASK-001. EE. Drawing A112-1C – LEVEL 01 DIMENSION PLAN – PHASE 01 – AREA C 1. REVISE plan dimensions of Storage room 109G and Door 109G. Refer to Attachment ADD# 1 ASK-002. 2. REVISE food venue scope area. Refer to Attachment ADD#1 ASK-002. FF. Drawing A113-1C – LEVEL 01 REFLECTED CEILING PLAN – PHASE 01 – AREA C 1. REVISE reflected ceiling plan layout of Storage room 109G. Refer to Attachment ADD#1 ASK-003. 2. REVISE food venue scope area. Refer to Attachment ADD#1 ASK-003. GG. Drawing A114-1C – LEVEL 01 FINISH PLAN – PHASE 01 – AREA C 1. REVISE finish plan of Storage Room 109G and PNT-2 Accent wall location. Refer to Attachment ADD#1 ASK-004. 2. REVISE food venue scope area. Refer to Attachment ADD#1 ASK-004. HH. Drawing A121-3B – LEVEL 02 ANNOTATION & DIMENSION PLAN – PHASE 03 – AREA B 1. ADD 2 walls for chase to accommodate existing storm drain pipe in the southwest corner of Serving Room 229A. Refer to Attachment ADD#1 ASK-05. II. Drawing A406-1 – PHASE 01 – LARGE SCALE FLOOR PLANS, ELEVATIONS, SECTIONS, & DETAILS – WELCOME DESK 1. DETAIL 5- WELCOME DESK ELEVATION 4. REVISE casework elevation. Refer to Attachment ADD#1 ASK-006. JJ. Drawing A413-1 – PHASE 01 – LARGE SCALE FLOOR PLAN, ELEVATIONS, SECTIONS & DETAILS – EMPORIUM SLIDING PANELS. 1. REISSUE drawing A413-1 in its entirety. See attached drawing A413-1. Emporium Sliding panel plans, elevations, sections and details revised. 2. ADD section detail 8/413-1 – PANEL DOORS – SECTION THRU PULL HANDLE. See attached drawing A413-1. KK. Drawing A456 – PAVILION STAIR PLANS, SECTIONS AND DETAILS. Dewberry Architects Inc. 009001 - 7 Addendum 1 1. REISSUE drawing A456 in its entirety. See attached drawing A456. 2. ADD section detail 8/456 – PAVILLION STAIR-LEVEL 03 SOFFIT NORTH. Section callout added to the stair plan and section drawing. See attached drawing A456. LL. Drawing QF110-1A – LEVEL 01 EQUIPMENT PLAN – PHASE 01 – AREA A 1. REISSUE drawing QF110-1A in its entirety. See attached drawing QF110- 1A. DELETE enviropure system and revise the pulper to ITEM #47 MM. Drawing QF111-1A – LEVEL 01 UTILITY SCHEDULE – PHASE 01 – AREA A 1. REISSUE drawing QF111-1A in its entirety. See attached drawing QF111- 1A. REVISE utilities for pulper (ITEM #47) NN. Drawing QF112-1A – LEVEL 01 BUILDING CONDITIONS & VENTILATION PLAN – PHASE 01 – AREA A 1. REISSUE drawing QF112-1A in its entirety. See attached drawing QF112- 1A. REVISE floor penetration to properly reflect the removal of the enviropure system. OO. Drawing QF113-1A – LEVEL 01 PLUMBING PLAN – PHASE 01 – AREA A 1. REISSUE drawing QF113-1A in its entirety. See attached drawing QF113- 1A. REVISE plumbing plan to properly reflect the revisions completed for the removal of the enviropure system. PP. Drawing QF113-1C – LEVEL 01 PLUMBING PLAN – PHASE 01 – AREA C 1. REISSUE drawing QF113-1C in its entirety. See attached drawing QF113- 1C. ADD a floor sink to accommodate for the drain on ITEM #342 (Freestyle coke machine) QQ. Drawing QF114-1A – LEVEL 01 ELECTRICAL PLAN – PHASE 01 – AREA A 1. REISSUE drawing QF114-1A in its entirety. See attached drawing QF114- 1A. REVISE electrical plan to properly reflect the electrical connections for the pulper. RR. Drawing QF111-2B – LEVEL 01 UTILITY SCHEDULE – PHASE 02 – AREA B 1. REISSUE drawing QF111-2B in its entirety. See attached drawing QF111- 2B. REVISE utilities for items #154, 156, 166, 167, 196, 200, 202, 205, 215, 217, 242, 243, 244 and 249 per coordination with engineers. SS. Drawing QF111.1-2B – LEVEL 01 UTILITY SCHEDULE – PHASE 02 – AREA B Dewberry Architects Inc. 009001 - 8 Addendum 1 1. REISSUE drawing QF111.1-2B in its entirety. See attached drawing QF111.1-2B. REVISE utilities for items #262, 263, 264, 270 and 275 per coordination with engineers. TT. Drawing QF113-2B – LEVEL 01 PLUMBING PLAN – PHASE 02 – AREA B 1. REISSUE drawing QF113-2B in its entirety. See attached drawing QF113- 2B. REVISE plumbing plan per coordination with engineers. UU. Drawing QF114-2B – LEVEL 01 ELECTRICAL PLAN – PHASE 02 – AREA B 1. REISSUE drawing QF114-2B in its entirety. See attached drawing QF114- 2B. REVISE the electrical plan per coordination with engineers. VV. Drawing QF121-3B – LEVEL 02 UTILITY SCHEDULE – PHASE 03 – AREA B 1. REISSUE drawing QF121-3B in its entirety. See attached drawing QF121- 3B. REVISE utilities for items #421, 430, 447 and 449 per coordination with engineers. WW. Drawing QF122-3B – LEVEL 02 BUILDING CONDITIONS & VENTILATION PLAN – PHASE 03 – AREA B 1. REISSUE drawing QF122-3B in its entirety. See attached drawing QF122- 3B. REVISE conduit runs for the soda machine and revise the documentation for the BC&V plans. XX. Drawing QF123-3B – LEVEL 02 PLUMBING PLAN – PHASE 03 – AREA B 1. REISSUE drawing QF123-3B in its entirety. See attached drawing QF123- 3B. REVISE the plumbing plan for the soda “bag n box” system and filter per coordination with engineers. YY. Drawing QF124-3B – LEVEL 02 ELECTRICAL PLAN – PHASE 03 – AREA B 1. REISSUE drawing QF124-3B in its entirety. See attached drawing QF124- 3B. REVISE the electrical connections for the soda system and soda dispensers, items #422 & #448, cold prep tables, #432A & #445A clam shell griddles, #430 and #447 fryers. ZZ. Drawing FP110-1 – LEVEL 1 FIRE PROTECTION – PHASE 1 1. REISSUE drawing FP110-1 in its entirety. See attached drawing FP110-1. ADD note pointing to FP piping to read: “DO NOT ROUTE FIRE PROTECTION PIPING DIRECTLY OVER ELECTRICAL EQUIPMENT IN MECHANICAL ROOM. (TYP.)” AAA. Drawing FP110-2 – LEVEL 1 FIRE PROTECTION – PHASE 2 1. REISSUE drawing FP110-2 in its entirety. See attached drawing FP110-2. REVISE note pointing to future area to read: “THIS AREA TO BE SPRINKLED IN THE FUTURE AND TIED INTO ZONE 1 PIPING. FPC Dewberry Architects Inc. 009001 - 9 Addendum 1 SHALL SIZE PIPING TO ZONE 1 TO ACCOUNT FOR FUTURE ADDITION. PIPING TO SERVE THIS AREA SHALL BE INSTALLED AND CAPPED DIRECTLY OUTSIDE OF AREA FOR FUTURE CONNECTION.” BBB. Drawing PD130-2B – LEVEL 3 - PLUMBING – DEMOLITION - PHASE 2 – AREA B 1. REISSUE drawing PD130-2B in its entirety. See attached drawing PD130- 2B. ADD note 3 to clarify what to do with existing condensate drainage during phase 2 demolition. CCC. Drawing PD110-3B – LEVEL 1 - PLUMBING – DEMOLITION - PHASE 3 – AREA B 1. REISSUE drawing PD110-3B in its entirety. See attached drawing PD110- 3B. REVISE demolition scope near McAlister’s kitchen. DDD. Drawing PD120-3B – LEVEL 2 - PLUMBING – DEMOLITION - PHASE 3 – AREA B 1. REISSUE drawing PD120-3B in its entirety. See attached drawing PD120- 3B. ADD note 3 to clarify vent demolition scope. REVISE storm piping demolition. EEE. Drawing P1U0-1C – UNDERFLOOR - PLUMBING – PHASE 1 – AREA C 1. REISSUE drawing P1U0-1C in its entirety. See attached drawing P1U0- 1C. ADD GSAN and GV piping for new floor sink. FFF. Drawing P110-1A – LEVEL 1 - PLUMBING – PHASE 1 – AREA A 1. REISSUE drawing P110-1A in its entirety. See attached drawing P110-1A. REMOVE mop sink fixture from plumbing scope. Fixture and faucet to be provided with food service equipment scope. GGG. Drawing P110-1B – LEVEL 1 - PLUMBING – PHASE 1 – AREA B 1. REISSUE drawing P110-1B in its entirety. See attached drawing P110-1B. REMOVE mop sink fixture from plumbing scope. Fixture and faucet to be provided with food service equipment scope. REVISE branch shut off valves to be located outside of fire rated corridor to avoid fire rated access panels. REVISE branch piping to three compartment sink in 159E. HHH. Drawing P110-1C – LEVEL 1 - PLUMBING – PHASE 1 – AREA C 1. REISSUE drawing P110-1C in its entirety. See attached drawing P110-1C. ADD FS-2 beneath soda machine. ADD note 8 to more clearly describe the shut of valve installation locations. III. Drawing P120-1B – LEVEL 2 - PLUMBING – PHASE 1 – AREA B Dewberry Architects Inc. 009001 - 10 Addendum 1

Description:
Paragraph 2.3 ARCHITECTURAL JOINT SYSTEMS FOR BUILDING .. REVISE the electrical connections for the soda system and soda .. Drawing E201 – ENLARGED PLANS - ELECTRICAL. 1. REISSUE drawing E500 in its entirety work for electrical distribution, fire alarm, and security systems.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.