ebook img

Design/Build/Operate/Finance Agreement PDF

104 Pages·2010·0.49 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Design/Build/Operate/Finance Agreement

EXECUTIONVERSION ContractNo.7875/09 AGREEMENT TO DESIGN, BUILD, FINANCE AND OPERATE SOUTHEAST STONEY TRAIL, CALGARY HER MAJESTY THE QUEEN IN RIGHT OF ALBERTA and CHINOOKROADSPARTNERSHIP March30,2010 DBFOAgreement-Mar22-10CL EXECUTIONVERSION ContractNo.7875/09 TABLE OF CONTENTS 1. INTERPRETATION...................................................................................................2 1.1 DefinedTerms....................................................................................................2 1.2 SectionReferences..............................................................................................8 1.3 Schedules............................................................................................................8 1.4 OrderofPrecedence............................................................................................9 1.5 EntireAgreement................................................................................................9 1.6 Currency..............................................................................................................9 1.7 LiquidatedDamages...........................................................................................9 1.8 NoAgency,JointVenture,Partnership, Leaseor Loan .....................................9 1.9 Contractor’s Knowledge...................................................................................10 1.10 RestatedSchedules............................................................................................10 1.11 AlbertaTransportationandAlbertaInfrastructure...........................................10 2. DESIGN,BUILD, FINANCE,OPERATEANDMAINTAIN...............................10 2.1 Project Financing..............................................................................................10 2.2 Design andBuild...............................................................................................11 2.3 Operationand Maintenance..............................................................................11 2.4 Handback..........................................................................................................11 2.5 AssumptionofRisk...........................................................................................11 3. FINANCING.............................................................................................................11 3.1 Project Financing..............................................................................................11 3.2 Direct LenderAgreement.................................................................................11 3.3 ConditionPrecedent..........................................................................................12 3.4 Financingand InitialPerformanceLetterofCredit..........................................12 3.5 Releaseof Financingand InitialPerformanceLetterofCredit........................12 3.6 Presentationof Financingand InitialPerformance LetterofCredit.................13 3.7 RepaymentofProceeds.....................................................................................14 4. THE LANDS............................................................................................................14 4.1 Access andUse.................................................................................................14 4.2 StatusofLands..................................................................................................15 4.3 CommencementandDuration..........................................................................15 4.4 NoAccess Fee...................................................................................................15 4.5 AdditionalTUC Lands......................................................................................15 4.6 Accesstoand UseofTUC Lands.....................................................................16 4.7 AdditionalLandsOutsidetheTUC..................................................................16 4.8 Utility,RailwayandDrainageAgreements......................................................17 4.9 ConditionoftheLands......................................................................................18 4.10 PermittedUse....................................................................................................20 4.11 NoEncumbrancesOn Lands............................................................................20 4.12 Liens..................................................................................................................21 4.13 OwnershipofImprovements.............................................................................21 2 4.14 UninterruptedAccess andUse..........................................................................21 4.15 PaymentofTaxeson Lands..............................................................................22 4.16 Access andUseRightstoCease.......................................................................22 4.17 HoldHarmless..................................................................................................22 5.1 Contractor’sObligations...................................................................................23 5.2 ProjectRequirements........................................................................................23 5.3 Contractor’sResponsibilitytoCarryOutProjectRequirements......................24 5.4 RequestforClarification...................................................................................24 5.5 Contractor’sDesigns,PlansandSchedule........................................................24 5.6 ContractorSolelyResponsibleforProject........................................................25 5.7 ContractorSolelyResponsibleforCosts..........................................................25 5.8 Construction WithintheLands.........................................................................26 5.9 DetailedDesigns...............................................................................................26 5.10 Stop WorkOrder...............................................................................................26 5.11 ConstructionDelays..........................................................................................26 5.12 Independent SafetyAuditor..............................................................................27 5.13 AnticipatedTrafficAvailability........................................................................28 5.14 CertificationofTrafficAvailability..................................................................28 5.15 ProvinceMayPreventRoadOpening...............................................................28 5.16 ConstructionCompletion..................................................................................29 5.17 ConstructionCompletionHoldback.................................................................30 5.18 ServiceRoads....................................................................................................30 5.19 CoordinationwithCompletionofExistingInfrastructure................................31 6. OPERATIONAND MAINTENANCE....................................................................31 6.1 CommencementofO&M.................................................................................31 6.2 O&MRequirements..........................................................................................32 6.3 CompliancewithApplicableLaws...................................................................32 6.4 RoadClosureFees............................................................................................32 6.5 ContractorSolelyResponsibleforO&MCosts................................................32 6.6 ConditionofExistingInfrastructure.................................................................33 7. MODIFICATIONSANDCHANGEORDERS.......................................................35 7.1 ModificationofProject Requirements..............................................................35 7.2 ModificationofO&MRequirements................................................................36 7.3 Other WorkbyProvince...................................................................................37 7.4 ExpansionbyProvince.....................................................................................37 7.5 DeterminationofCosts.....................................................................................39 8. HANDBACKUPONEXPIRY.................................................................................39 8.1 HandbackRequirements...................................................................................39 8.2 HandbackInspections.......................................................................................39 8.3 Procedure FollowingInspections......................................................................40 8.4 Holdbacks.........................................................................................................40 8.5 Substitutionof LetterofCredit.........................................................................40 8.6 Disagreements...................................................................................................41 9. PAYMENT...............................................................................................................41 9.1 PaymentofProvincial Funding........................................................................41 9.2 PaymentMechanism.........................................................................................41 3 9.3 PaymentProcedure...........................................................................................42 9.4 AdjustmentofthePaymentSchedule...............................................................43 9.5 EarlyCompletion..............................................................................................43 9.6 LateCompletion................................................................................................43 9.7 NoGST.............................................................................................................44 9.8 Set-off...............................................................................................................44 9.9 InterestonOverdue Payments..........................................................................45 9.10 WinterRelief.....................................................................................................45 10. INDEXINGANDPAYMENTADJUSTMENTS...............................................46 10.1 IndexingofO&MPayment..............................................................................46 10.2 PaymentAdjustments.......................................................................................46 10.3 NotificationofPayment Adjustments...............................................................46 10.4 Replacementof Subcontractor..........................................................................46 11. INSURANCE,DAMAGEANDDESTRUCTION..............................................47 11.1 InsuranceRequirements....................................................................................47 11.2 OtherRequirements..........................................................................................47 11.3 WaiverofRecourse...........................................................................................48 11.4 Evidenceof Insurance.......................................................................................48 11.5 ProvinceMayInsure.........................................................................................48 11.6 ReviewandBenchmarkingof Insurance..........................................................49 11.7 RepairofDamage-ConstructionPeriod..........................................................49 11.8 RepairofDamage- OperatingPeriod..............................................................50 11.9 Uninsurability...................................................................................................52 12. FORCEMAJEURE..............................................................................................53 12.1 Force MajeureDuringConstructionPeriod......................................................53 12.2 Force MajeureDuringOperatingPeriod..........................................................54 12.3 Procedureon ForceMajeureEvent...................................................................55 13. RELIEFEVENTS.................................................................................................56 13.1 Definitions.........................................................................................................56 13.2 ReliefEventDefined.........................................................................................57 13.3 ReliefEventDuringConstructionPeriod.........................................................59 13.4 ReliefEventDuringOperatingPeriod..............................................................61 13.5 ProcedureonReliefEvent................................................................................62 14. CONTRACTOR’SREPRESENTATIONSANDOBLIGATIONS....................63 14.1 Contractor’sRepresentations............................................................................63 14.2 ReportingRequirements...................................................................................64 14.3 Records.............................................................................................................65 14.4 Access,InspectionandTesting.........................................................................65 14.5 Safety................................................................................................................66 14.6 Contractor’sOtherObligations.........................................................................66 15. PROVINCE’SREPRESENTATIONSANDOBLIGATIONS...........................66 15.1 Province’sRepresentations...............................................................................66 15.2 Province’sGeneralObligation..........................................................................67 15.3 Contractor’sRelianceon Information..............................................................67 15.4 AssistancewithPermitsandUtilityAgreements..............................................67 16. DEFAULT,REMEDIESANDTERMINATIONEVENTS................................68 4 16.1 Contractor’s Indemnity.....................................................................................68 16.2 Province’s Indemnity........................................................................................69 16.3 Calculationofand LimitationonClaims..........................................................69 16.4 ExclusivityofSpecified Remedies...................................................................71 16.5 ExclusivityofTerminationProvisions.............................................................71 16.6 Province’sStep-inRights.................................................................................71 16.7 TerminationEventDefinedTerms...................................................................72 16.8 TerminationEvents...........................................................................................73 17. TERMINATION...................................................................................................75 17.1 Direct LenderAgreement.................................................................................75 17.2 TerminationbyProvince...................................................................................75 17.3 TerminationbyContractor................................................................................75 17.4 TerminationUpon ForceMajeure....................................................................76 17.5 Consequencesof Termination...........................................................................76 17.6 SurvivalofObligations.....................................................................................77 18. TERMINATION PAYMENTS............................................................................77 18.1 TerminationPaymentsDefinedTerms.............................................................77 18.2 ConstructionPeriodTermination......................................................................82 18.3 Termination WhileProvinceHolds Financingand InitialPerformanceLetterof Credit ...........................................................................................................................82 18.4 OperatingPeriodTermination..........................................................................82 18.5 PaymentBasedon SaleofContractualRights.................................................83 18.6 Paymentof Fair MarketValue..........................................................................84 18.8 Force MajeureTermination-OperatingPeriod.Error!Bookmarknotdefined. 18.9 TerminationforConvenienceorbyContractor................................................86 18.10 Set-offAgainstTerminationPayments.........................................................87 18.11 NegativeAmounts........................................................................................87 18.12 RescueFinancing..........................................................................................87 18.13 Deliveryof Information................................................................................87 19. COMMUNICATIONS.........................................................................................88 19.1 Notices..............................................................................................................88 19.2 AuthoritytoGiveNotices.................................................................................89 19.3 PublicAnnouncements.....................................................................................89 19.4 ConfidentialInformation..................................................................................89 19.5 DisclosureofConfidentialInformation............................................................90 19.6 PublicDisclosureofAgreement.......................................................................90 19.7 Collection,UseandDisclosureofPersonal Information..................................90 19.8 NamingRights..................................................................................................91 20. CONTRACTADMINISTRATION.....................................................................91 20.1 ContractAdministration Representatives.........................................................91 20.2 MutualCooperation..........................................................................................91 20.3 Conductof Indemnified Claims........................................................................92 21. DISPUTERESOLUTION....................................................................................93 21.1 DisputeResolutionProcedure...........................................................................93 21.2 Exception..........................................................................................................93 21.3 TerminationandDisputeResolutionProcedure...............................................94 5 21.4 NoCourtProceedings.......................................................................................94 21.5 Payments Where AmountinDispute................................................................94 22. GENERALPROVISIONS...................................................................................94 22.1 AssignmentbyContractor................................................................................94 22.2 SubcontractingbyContractor...........................................................................95 22.3 Changein Ownership........................................................................................95 22.4 AssignmentbyProvince...................................................................................96 22.5 IntellectualProperty..........................................................................................96 22.6 ApplicableLaw andJurisdiction......................................................................97 22.7 Amendmentand Waiver...................................................................................97 22.8 AdditionalAssurances......................................................................................97 22.9 Counterparts......................................................................................................97 22.10 JointandSeveral...........................................................................................98 EXECUTIONVERSION ContractNo.7875/09 AGREEMENT TO DESIGN, BUILD, FINANCE AND OPERATE SOUTHEAST STONEY TRAIL, CALGARY madethis30thdayof March,2010 BETWEEN: HER MAJESTY THE QUEEN IN RIGHT OF ALBERTA, as represented by the Minister of Transportation and the Minister of Infrastructure (the “Province”) AND: CHINOOKROADSPARTNERSHIP, a generalpartnershipestablished underthelawsoftheProvinceofAlberta,byits general partners SNC-LavalinChinookRoads GPInc. and AccionaChinookRoads GPInc. (the “Contractor”) PREAMBLE: PursuanttoanRFQand RFPprocess,theProvincehas selectedtheContractortodesign, buildandfinance,andfora30 yeartermcommencingontheearlierof trafficavailability orOctober1,2013,tooperate, maintain andrehabilitate,thesoutheastlegofStoneyTrail ringroadintheCityofCalgary. In addition,andduringthesame30 yearterm,the Contractorhas beenselectedtooperateand maintaintheportionofDeerfootTrailfrom Southeast StoneyTrailto Highway2Ajunction. TheProvinceandtheContractorthereforeagreeasfollows: 2 1. INTERPRETATION 1.1 DefinedTerms Inthis Agreement(including,exceptwhereacontrarymeaningisclearlyintended,inthe Schedules),thefollowingexpressionshavethefollowingmeanings(andwhere applicabletheirpluralshavecorrespondingmeanings): “Business Day”means adayotherthanaSaturday, Sundayorstatutoryholidayin Alberta; “CapitalPayment”means thecomponentofthemonthlypaymenttobemadebythe ProvincetotheContractorunder Section9.2thatisdescribedastheCapitalPayment inSchedule14; “ChangeOrder”has the meaningindicatedinSchedule1(ChangeOrders); “ChangeOrderConfirmation”hasthemeaningindicatedinSchedule1(Change Orders); “ChangeOrderDirective”has themeaningindicatedinSchedule1 (Change Orders); “City”meansTheCityofCalgary; “CityRoadAllowances”means thelandsidentifiedas CityRoadAllowancesin Schedule12; “ConstructionCompletion”means fullcompletionofallaspectsoftheProjectin accordancewiththeProjectRequirements,as evidencedbyacertificateissuedbythe ProvinceunderSection5.16; “ConstructionPeriod”means thetimebetween ExecutionofthisAgreementand TrafficAvailability(butexcludingthedaywhen TrafficAvailabilityisachieved); “ConstructionSeason”meanstheperiodfromMay1throughOctober31,inclusive, inanyyear; “Contractor’sConstructionSchedule”means theContractor’s schedulefor constructionoftheProject,setoutinSchedule2,andincludinganyamendments madefromtimetotimeinaccordancewithSection5.5; “Contractor’sContactOrganization”means theContactOrganizationnamedin theresponsetotheRFPthatculminatedintheContractor’s Proposal; “Contractor’sDesigns”meanstheContractor’sdesigndrawingsanddesignreports 3 fortheNewInfrastructure,setoutinSchedule3,andincludinganyamendments madefromtimetotimeinaccordancewithSection5.5; “Contractor’sManagementSystemsandPlans”meansalloftheContractor’s systemsandplanspresentedintheContractor’s ProposalandsetoutinSchedule4, andincludinganyamendments madefromtimetotimeinaccordancewith Section 5.5; “Contractor’sProposal”meansthefinal(SR2B andSR3)proposalsubmittedbya consortiumof whichtheContractoristhespecialpurposevehiclecontemplatedby theproposal,submittedinresponsetotheRFP,andincludesallamendments made bytheContractorinaccordance withtheRFP; “Court” meansacourtoflawofcompetentjurisdiction; “DirectLenderAgreement”means the agreementcontemplatedbySection3.2and Schedule6,tobeentered intoamongtheProvince,theContractor,andoneormore lenders(oranytrusteeorotherrepresentativeofsuchlenders) whoprovide the SeniorDebt Financing; “DisputeResolutionProcedure”meanstheproceduresetoutinSchedule7; “EnvironmentalDamageorDegradation”means thepresenceof contaminationin water,soilorair,inviolationofapplicableenvironmentallaws (including,without limitation,environmental lawsenactedafterthetimeatwhichtheHazardous Substancecausingthecontaminationis firstpresent),causedbyanyHazardous Substance,andincludes deathorinjurytoplants,animalsorhumanbeings resulting inwholeorinpartfromsuchcontamination; “Equity” means anypart oftheProject FinancingotherthantheSeniorDebt Financing; “Execution”ofthis Agreementmeans the signinganddeliveryofthis Agreementby boththeProvinceandtheContractor; “ExistingInfrastructure”meanstheinfrastructuredescribedinSchedule8,and subjecttotheforegoinggenerallymeanstheportionofDeerfootTrailfrom SoutheastStoneyTrailto Highway2Ajunction; “FinancingandInitial PerformanceLetterofCredit”means theletter ofcreditto bedeliveredbytheContractortotheProvinceunderSection3.3,andtheamount thereofmayvaryas applicableifthesecondparagraphofSection3.5isinvoked; “FOIP”means the FreedomofInformationandProtectionofPrivacyAct (Alberta), asamendedorreplaced fromtimetotime; 4 “ForceMajeureEvent”means anywar,invasion,insurrection,armedconflict,act offoreignenemy,revolution,terroristact,interferencebymilitaryauthorities, nuclear explosion,contaminationbyionizingradiation,epidemic,orquarantine restrictionthatprevents,delaysorinterrupts theperformanceofanyobligationunder thisAgreement,otherthananyobligationtopayanymoney, andprovided such eventdoesnotoccurbyreasonof: (i)thenegligenceofthepartyrelyingonthe ForceMajeureEvent(orthosefor whomitisinlawresponsible);or (ii)anyactoromissionofthepartyrelyingontheForceMajeureEvent(orthose forwhomitisinlawresponsible)thatisinbreachoftheprovisionsofthis Agreement; “HandbackRequirements”meanstheContractor’sobligationstohandbackthe New Infrastructure andtheExistingInfrastructure attheendoftheTermin the conditionrequiredbySchedule18(TechnicalRequirements),includingany amendmentsdeemedtobemadebytheoperation ofSection6.6; “Hazardous Substance”meansanysolid,liquid,gas,odor,heat,sound,vibration, radiationorothersubstanceoremissionthatisacontaminant,pollutant,dangerous substance,toxicsubstance,hazardouswaste,hazardous materialorhazardous substancethatisorbecomesregulatedbyorunderanyapplicableenvironmentallaw orthatisorbecomes classifiedashazardousortoxicbyorunder anyapplicable environmentallaw; “IdentifiedEncumbrances” means: (a) allencumbrances andintereststhatasofNovember13,2009areregistered againstanyofthetitles listedinsection4ofSchedule12(Lands);and (b) allunregisteredutilityrights ofway,easementsandothersimilarintereststhat are: (i)specificallyidentified inAppendix AtoSchedule12; (ii)asofNovember13,2009withinthe“CityRoadAllowances”defined inSchedule12;or (iii)knowntotheContractorasofNovember13, 2009,orwouldhave beendisclosedtotheContractoronthatdatehad theContractormade inquirythroughAlbertaOne-CallCorporation; “IndependentSafetyAuditor”meanstheIndependentSafetyAuditor contemplated bySection5.12whoserecommendationconstitutescertificationofTraffic AvailabilityunderSection5.14;

Description:
DBFO Agreement - Mar 22-10 CL. AGREEMENT TO DESIGN .. Utility, Railway and Drainage Agreements 5.12 Independent Safety Auditor.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.