City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 1 Project Project Useful Life Useful Life Agency Name Project Title Pre‐Construction Construction Description Location Min Max Adelanto Pavement Repair and Apply crack seal & type II slurry over 237,000 •Muskrat Ave, Joshua St, Dennis St, Panther Ave. and Janine St. between Jay 06/2018 07/2018 03 05 Rehabilitation Project, square feet of existing asphalt pavement. Re‐ St. and Kay St. Phase I install all pavement markings. •Jay St. between Racoon Ave. and Muskrat Ave. •Kay St. between Janine St. and Muskrat Ave. Adelanto Pavement Repair and Apply crack seal & type II slurry over 184,000 •Stevens St. and Aster Rd. between Chamberlaine Way and Vintage Road. 06/2018 07/2018 03 05 Rehabilitation Project, square feet of existing asphalt pavement. Re‐ •Vintage Rd. and Chamberlaine Wy. Between Stevens St. and Aster Rd. Phase I install all pavement markings. •The east half of Mendicino Rd. between Stevens St. and Aster Rd. •Sonoma Rd, Zinfadel Dr, Bouquet Ave. and Napa Rd. Adelanto Pavement Repair and Apply crack seal & type II slurry over 290,000 •Aster Rd. between Bartlett Ave. and Inyo St. 06/2019 07/2019 03 05 Rehabilitation Project, square feet of existing asphalt pavement. Re‐ •Chevron Ct, Florence Ct, Leisure Rd, Lee Ave, Arlette Ct. and Inyo Ct. from Phase II install all pavement markings. Aster Rd. to cul‐de‐sac. This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 2 Project Project Useful Life Useful Life Agency Name Project Title Pre‐Construction Construction Description Location Min Max Adelanto Pavement Repair and Apply crack seal & type II slurry over 65,900 •Panther Ave. from Chamberlaine Wy end of pavement. 06/2019 07/2019 03 05 Rehabilitation Project, square feet of existing asphalt pavement. Re‐ •Franklin Ct from Panther Ave. to cu‐de‐sac. Phase II install all pavement markings. •Colonial Ave. and Payne Ct. Adelanto Pavement Repair and Apply crack seal & type II slurry over 85,000 •Verbena Rd. from Lawson Ave. to Bartlett Ave. 06/2019 07/2019 03 05 Rehabilitation Project, square feet of existing asphalt pavement. Re‐ •Maya St. between Verbena St. and Hermosa Rd. Phase II install all pavement markings. •Aztec Ln. between Verbena Rd. and Hermosa Rd. Adelanto Pavement Repair and Apply crack seal & type II slurry over 817,900 •Bartlett Ave. between Racoon Ave. and Aster Rd. 06/2020 07/2020 03 05 Rehabilitation Project, square feet of existing asphalt pavement. Re‐ •Aster Ave. between Bartlett Ave. and Air Expressway Phase III install all pavement markings. •Air Expressway between Aster Rd. and Racoon Ave. •Raccoon Ave. between Air Expressway and Bartlett Ave. •All streets bound by the above described limits. This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 3 Project Project Useful Life Useful Life Agency Name Project Title Pre‐Construction Construction Description Location Min Max Adelanto Adelanto Rd. Widening Construct 1.5 miles of street to ultimate width Adelanto Rd. between Yucca Rd. and Highway 395. 03/2019 06/2019 10 20 Project (80 feet curb to curb) including curb, sidewalks, grind and overlay all existing asphalt pavement, construct new ADA ramps, adjust utilities as necessary, install pavement parkings and signage to implement traffic calming and pedestrian safety. This portion of Adelanto Rd. is a transit route and the pavement section and traffic control devices will be implemented acordingly. Adelanto Rancho Rd. Widening Construct 3 miles of street to ultimate width Rancho Rd. between Adelanto Rd. and Koala Rd. 03/2019 06/2019 10 20 Project. (80 feet curb to curb) including curb and sidewalks, grind and overlay all existing asphalt pavement, construct new ADA ramps, adjust utilities as necessary, install pavement parkings and signage to implement traffic calming and pedestrian safety. Portions of Rancho Road are transit routes. Therefore pavement sections and traffic control devices will be implemented accordingly. Adelanto Bellflower St. widening at Construct approximately 480 feet of new curb Bellflower Rd. from Palmdale Rd. to end of existing curb on west side of 11/2017 12/2017 10 20 Palmdale Rd. and gutter to widen Bellflower Road. Existing Bellflower. pavement will be ground and overlaid with new asphalt. The widened portion of Bellfower Rd. will extend new asphalt to new gutter. New pavement markings on the widened street will safety channel traffic to Palmdale Rd. (Hwy 18) and a new development at the corner of Palmdale Rd. and Bellflower Rd. Agoura Hills Fiscal Year 2017‐18 Street Resurfacing twelve road segments with Various locations within the City of Agoura Hills 10/2017 11/2017 10 25 Resurfacing Project rubberized asphalt concrete, as well as, upgrading nine ADA ramps. This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 4 Project Project Useful Life Useful Life Agency Name Project Title Pre‐Construction Construction Description Location Min Max Alameda Sidewalks Street tree root pruning and sidewalk repair to Throughout the City of Alameda ‐ the backlog of repairs includes about 5,500 07/2017 06/2018 10 70 maintain pedestrian circulation and safety, and locations, of which, several clusters will be chosen that address the oldest minimize future damage to the street and requests, and maximize economy by aggregating sites in close location to each sidewalk. other. Alameda Pavement Management Resurfacing and repair of street pavement, and The Pavement Management program that is funded in FY 17‐18 is spread 05/2018 11/2018 30 40 restoration of flowlines of associated curb and throughout the City of Alameda. The particular street identified for SB1 funds gutter, in order to extend the life of the street is Broadway, from Shoreline Drive to Otis Drive. and improve its ridability for cyclists and motorists. Albany Evelyn Street Pavement This project consists of the asphalt concrete Evelyn Street from Garfield Avenue to Portland Avenue, in the City of Albany 03/2018 06/2018 20 30 Rehabilitation overlay of Evelyn Street from Garfield Avenue to Portland Avenue, for a distance of approximately 600 feet. It will also include base repair, traffic striping and upgrade of existing curb ramps at street intersections to meet ADA requirements. Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Pine Street, West City Limit to Atlantic Blvd. 06/2018 12/2018 15 20 Rehabilitation Project Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Olive Avenue, Alhambra Road to Pine Street 06/2018 12/2018 15 20 Rehabilitation Project Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Curtis Avenue, Alhambra Road to Pine Street 06/2018 12/2018 15 20 Rehabilitation Project Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Dos Robles, Alhambra Road to Pine Street 06/2018 12/2018 15 20 Rehabilitation Project Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Electric Avenue, Alhambra Road to North City Limit 06/2018 12/2018 15 20 Rehabilitation Project Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Marguerita Avenue, Alhambra Road to Pine Street 06/2018 12/2018 15 20 Rehabilitation Project Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Spruce Street, Curtis Avenue to Atlantic Blvd 06/2018 12/2018 15 20 Rehabilitation Project Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Almansor Street, Main Street to Huntington Drive 06/2018 12/2018 15 20 Rehabilitation Project This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 5 Project Project Useful Life Useful Life Agency Name Project Title Pre‐Construction Construction Description Location Min Max Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Marengo Avenue, Main Street to Valley Blvd 06/2018 12/2018 15 20 Rehabilitation Project Aliso Viejo Glenwood Terrace Local street rehabilitation (patching and Glenwood Terrace HOA Public Streets 06/2018 09/2018 10 20 Rehabilitation overlay). FY 17‐18 funds to be banked for construction in FY 18‐19 Amador City Road maintenance Repainting crosswalks and curbs. Within city limits. 09/2017 12/2017 10 20 American 2018 Annual Pavement Grind and AC Overlay Arden Court, Ascot Court, Bedford Way, Brookshire Way, Chaucer Court, Kent 05/2018 06/2018 10 20 Canyon Management Project Way, Kingsly Lane, Knightsbridge Court, Park Lane and Patricia Drive Anaheim Billie Jo Circle The work consists of removing and Billie Jo Circle Neighborhood ‐ bordered by Underhill Avenue to the north, 10/2017 11/2017 15 20 Neighborhood reconstructing the pavement in the roadway, Shakespeare Street to the East, Elsiena Way to the south, and Sunkist Street to Rehabilitation applying slurry seal, replacing damaged areas of the west concrete (sidewalk, curb and gutter, and access ramps), replacing pavement striping and pavement markings. Anaheim Larkspur Neighborhood The work consists of removing and Larkspur Neighborhood ‐ bordered by Hightree Circle to the north, Oakwood 11/2017 05/2018 15 20 Rehabilitation reconstructing the pavement in the roadway, Avenue to the east, Orangethorpe Avenue to the south, and Bubach Street to applying slurry seal, replacing damaged areas of the west concrete (sidewalk, curb and gutter, and access ramps), replacing pavement striping and pavement markings. This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 6 Project Project Useful Life Useful Life Agency Name Project Title Pre‐Construction Construction Description Location Min Max Anaheim Cinda Burntwood The work consists of removing and Cinda Burntwood Neighborhood ‐ bordered by South Street to the north, 11/2017 05/2018 15 20 Neighborhood reconstructing the pavement in the roadway, Anaheim Coves trail to the east, Burntwood Avenue to the south, and Rio Vista Rehabilitation applying slurry seal, replacing damaged areas of Street to the west concrete (sidewalk, curb and gutter, and access ramps), replacing pavement striping and pavement markings. Anaheim Stone Creek Lane The work consists of removing and Stone Creek Lane Neighborhood ‐ comprised of eight (8) areas located in east 11/2017 05/2018 15 20 Neighborhood reconstructing the pavement in the roadway, Anaheim. These areas are located in close proximity to Santa Ana Canyon Road Rehabilitation applying slurry seal, replacing damaged areas of and Canyon Rim Road between Weir Canyon Road and Anaheim Hills Road concrete (sidewalk, curb and gutter, and access ramps), replacing pavement striping and pavement markings. Anaheim Sabina Neighborhood The project will address poor drainage areas Sabina Neighborhood ‐ bordered by La Palma Avenue to the north, Anaheim 11/2017 05/2018 15 20 Rehabilitation (Project ‐ A)throughout the community by constructing new Boulevard to the east, Sycamore Street to the south, and Harbor Boulevard to concrete curb and gutter. The project the west improvements will also include cold planing and resurfacing the road with an asphalt concrete overlay, the replcement and construction of new ADA access ramps, and the replacement of uneven and broken sidewalks. Anaheim Acacia Neighborhood The work consists of removing and Acacia Neighborhood ‐ bordered by Via Burton Street to the north, State 05/2018 11/2018 15 20 Rehabilitation reconstructing the pavement in the roadway, College Boulevard to the east, Lincoln Avenue to the south, and East Street to applying slurry seal, replacing damaged areas of the west concrete (sidewalk, curb and gutter, and access ramps), replacing pavement striping and pavement markings. Anaheim Miraloma Avenue & Miller Project Partnering with APU‐Electrical to cost Miraloma Avenue from Blue gum Street to Miller Street 08/2015 11/2017 10 15 Street Rehabilitation share on the road rehabilitation of the Miller Street from La Palma Avenue to Miraloma Avenue [APUE UD #62] impacted road segments due to the APU‐ Electrical underground conversion project currently in construction. The road rehabilitation work consists of cold planing, resurfacing the road with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. Anaheim Lincoln Avenue & Rio Vista Project Partnering with APU‐Electrical to cost Lincoln Avenue from Sunkist Street to Rio Vista Street and 08/2016 08/2018 10 15 Street Rehabilitation share on the road rehabilitation of the Rio Vista Street from Lincoln Avenue to La Palma Avenue [APUE UD #63] impacted road segments due to the APU‐ Electrical underground conversion project currently in construction. The road rehabilitation work consists of cold planing, resurfacing the road with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 7 Project Project Useful Life Useful Life Agency Name Project Title Pre‐Construction Construction Description Location Min Max Anaheim Cerritos Avenue Project partnering with PW‐Sewer Section to Cerritos Avenue from 9th Street to Euclid Street 08/2017 11/2017 10 15 Rehabilitation cost share on the road rehabilitation of the [PW Sewer] impacted road segments due to the PW‐Sewer improvement project currently in construction. The road rehabilitation work consists of cold planing, resurfacing the road with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. Anaheim Orangewood Avenue Project Partnering with APU‐Electrical to cost Orangewood Avenue from Harbor Boulevard to Lewis Street 08/2017 11/2018 10 15 Rehabilitation from share on the road rehabilitation of the Harbor Boulevard to Lewis impacted road segments due to the APU‐ Street Electrical underground conversion project [APUE UD #64] currently in construction. The road rehabilitation work consists of cold planing, resurfacing the road with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. Anaheim Orangethorpe Avenue & Project partnering with the City of Placentia Orangethorpe Avenue from the Kraemer Boulevard Intersection easterly on 11/2017 02/2017 10 15 Kraemer Boulevard and OCTA to cost share on the road Orangethorpe Avenue to the end of the Orangethorpe Grade Separation Rehabilitation rehabilitation of the impacted road segments project limit and southerly on Kraemer Boulevard to East La Jolla Street [OCTA Bridges] due to the Kraemer Grade Separation Project and Orangethorpe Grade Separation Project constructed by OCTA. The road rehabilitation work consists of cold planing, resurfacing the road with an asphalt concrete overlay, slurry seal, the replacement of traffic striping, traffic signal loops, pavement markings, curb and gutter, sidewalk, and an ADA access ramp. Anaheim Blue Gum Street & The road rehabilitation work consists of cold Blue Gum Street from La Palma Avenue to the North City Limits 11/2017 05/2018 20 25 Miraloma Avenue planing and resurfacing the road with an Miraloma Avenue from the SR‐57 Freeway bridge to Blue Gum Street, and a Rehabilitation asphalt concrete overlay and by constructing 527 foot segment of La Cresta Avenue starting at 264 feet east of Blue Gum Jointed Plain Concrete Pavement (JPCP) at the Street going easterly intersection approaches on Miraloma Avenue and Blue Gum Street. The work also includes the removal and reconstruction of ADA access ramps, cross gutters, and the installation of new curb, gutter, sidewalk, and the replacement of traffic striping, traffic signal loops, and pavement markings. Anaheim Orange Avenue The road rehabilitation work consists of cold Orange Avenue from Western Avenue to Dale Avenue 11/2017 05/2018 10 15 Rehabilitation from planing and resurfacing the road with an Western Avenue to Dale asphalt concrete overlay, the removal and Avenue reconstruction of ADA access ramps, curb and gutter, concrete sidewalk, and replacement of traffic striping, traffic signal loops, and pavement markings. This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 8 Project Project Useful Life Useful Life Agency Name Project Title Pre‐Construction Construction Description Location Min Max Anaheim La Palma Avenue Project partnering with PW‐Sewer Section to La Palma Avenue from East Street to N. Acacia Street 12/2017 11/2018 10 15 Rehabilitation from East cost share on the road rehabilitation of the Street to N. Acacia Street impacted road segments due to the PW‐Sewer [PW Sewer] improvement project currently in construction. The road rehabilitation work consists of cold planing, resurfacing the road with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. Anaheim Arterial Slurry Seal Group The road rehabilitation work consists of Ball Road from Beach Boulevard to Dale Avenue 03/2018 05/2018 05 07 2 – Various Locations applying a crack sealant and slurry seal coat to La Palma Avenue from Chrisden Street to Potomac Circle Ball Road from Beach the existing pavement. Some minor cold Santa Ana Canyon Road from Fairmont Boulevard to Mohler Drive Boulevard to Dale Avenue planing, resurfacing the road with an asphalt La Palma Avenue from concrete overlay, and the replacement of traffic Chrisden Street to striping, traffic signal loops, and pavement Potomac Circle markings. Santa Ana Canyon Road from Fairmont Boulevard to Mohler Drive Anaheim La Palma Avenue & The road rehabilitation work consists of cold La Palma Avenue from the West City Limit to Mayflower Street & 05/2018 08/2018 10 15 Magnolia Avenue planing and resurfacing the road with an Magnolia Avenue from the I‐5 Freeway to La Palma Avenue Rehabilitation asphalt concrete overlay, the removal and reconstruction of ADA access ramps, curb and gutter, concrete sidewalk, and replacement of traffic striping, traffic signal loops, and pavement markings. Anaheim Lincoln Avenue The road rehabilitation work consists of cold Lincoln Avenue from State College Boulevard to Sunkist Street 05/2018 08/2018 10 15 Rehabilitation from State planing and resurfacing the road with an College Boulevard to asphalt concrete overlay, the removal and Sunkist Street reconstruction of ADA access ramps, curb and gutter, concrete sidewalk, and replacement of traffic striping, traffic signal loops, and pavement markings. Anaheim Kings Court The work consists of removing and Kings Court Neighborhood ‐ bordered by Ball Road to the north, Euclid Street 03/2018 11/2018 15 20 Neighborhood reconstructing the pavement in the roadway, to the east, Katella Avenue to the south, and Brookhurst Street to the west Rehabilitation applying slurry seal, replacing damaged areas of concrete (sidewalk, curb and gutter, and access ramps), replacing pavement striping and pavement markings. Anderson City Wide Grinder Dig‐out Conduct grinder dig‐outs on sections of failing May include North Street, South Street, Riverside Avenue, Bruce Street, Stingy 04/2018 07/2018 15 20 Project pavement on City of Anderson streets. Dig‐outs Lane, Balls Ferry Road, Silver Street, Diamond Street, Briggs Street, First Street, will vary between 4' wide and 12' wide Marmac Road, Bay Street, McMurray Drive, East Street, and Oak Street. depmending on width of pavement failure for length of failure. Depth will vary between 3" and 6" depending on roadway Traffic Index number. This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 9 Project Project Useful Life Useful Life Agency Name Project Title Pre‐Construction Construction Description Location Min Max Anderson North Street Cape Seal Cape seal North Street which is an arterial North Street from SR 2736 to the North Street Bridge 04/2018 07/2018 08 10 Project roadway. Widths vary between 56' and 64'. Length of roadway segment is 8,000 lf. Anderson Anderson Heights Cape Cape Seal existing residential streets. Street Pinion, Larch, Lodgepole, Aspen, Spruce, Hemlock and Jefferies Streets and 04/2018 07/2018 08 10 Seal Project widths vary between 28' and 36' wide. Length Avenues of roadway segments equals 13,000 lf. Angels Camp 2018 Road Improvement Repave or Reconstruct Acorn Drive Acorn Drive 07/2018 08/2018 30 40 Project Antioch 2017‐18 roadway rubberized cape seal roadway Golden Bear Drive 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway El Rey Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Dolores Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Capistrano Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Bautista Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway San Joaquin Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Faria Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway D Street ‐ W Tregallas to Putnam 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Elizabeth Lane 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Robert Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Plumleigh Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Elizabeth Court 02/2018 08/2018 10 15 maintenance project This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 10 Project Project Useful Life Useful Life Agency Name Project Title Pre‐Construction Construction Description Location Min Max Antioch 2017‐18 roadway rubberized cape seal roadway Putnam Street ‐ Lone Tree to G Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Minta Lane 02/2018 08/2018 10 15 maintenance project Antioch 2019 roadway rubberized cape seal roadway Hillcrest Ave ‐ E 18th to E 13th 02/2019 08/2019 10 15 maintenance project Antioch 2019 roadway rubberized cape seal roadway E 13th Street ‐ Hillcrest to Minaker 02/2019 08/2019 10 15 maintenance project Antioch 2019 roadway rubberized cape seal roadway Minaker Drive 02/2019 08/2019 10 15 maintenance project Antioch 2019 roadway rubberized cape seal roadway W 11th Street ‐ L St to G St 02/2019 08/2019 10 15 maintenance project Antioch 2019 roadway rubberized cape seal roadway 14th Street ‐ L St to G St 02/2019 08/2019 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway William Reed Drive 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Cataline Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Brisdale Place 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Stillwell Circle 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Madill Circle 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway W. Madill Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Hawthorne Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Campbell Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Creed Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Newbury Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway John Gildi Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Russell Drive 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Lawrence Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Lawton Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Texas Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Gem Lane 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway F Street ‐ Texas to Drake 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway D Street ‐ SPRR to Drake 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Lindburg Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway rubberized cape seal roadway Rossi Avenue 02/2018 08/2018 10 15 maintenance project This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected]
Description: