ebook img

City - Proposed LSRP Projects as of 11-17-17 PDF

554 Pages·2017·2.29 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview City - Proposed LSRP Projects as of 11-17-17

City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 1 Project Project Useful Life  Useful Life  Agency Name Project Title Pre‐Construction Construction Description Location Min Max Adelanto Pavement Repair and  Apply crack seal & type II slurry over 237,000  •Muskrat Ave, Joshua St, Dennis St, Panther Ave. and Janine St. between Jay  06/2018 07/2018 03 05 Rehabilitation Project,  square feet of existing asphalt pavement. Re‐ St. and Kay St.  Phase I install all pavement markings. •Jay St. between Racoon Ave. and Muskrat Ave. •Kay St. between Janine St. and Muskrat Ave. Adelanto Pavement Repair and  Apply crack seal & type II slurry over 184,000  •Stevens St. and Aster Rd. between Chamberlaine Way and Vintage Road.  06/2018 07/2018 03 05 Rehabilitation Project,  square feet of existing asphalt pavement. Re‐ •Vintage Rd. and Chamberlaine Wy. Between Stevens St. and Aster Rd. Phase I install all pavement markings. •The east half of Mendicino Rd. between Stevens St. and Aster Rd. •Sonoma Rd, Zinfadel Dr, Bouquet Ave. and Napa Rd. Adelanto Pavement Repair and  Apply crack seal & type II slurry over 290,000  •Aster Rd. between Bartlett Ave. and Inyo St. 06/2019 07/2019 03 05 Rehabilitation Project,  square feet of existing asphalt pavement. Re‐ •Chevron Ct, Florence Ct, Leisure Rd, Lee Ave, Arlette Ct. and Inyo Ct. from  Phase II install all pavement markings. Aster Rd. to cul‐de‐sac. This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 2 Project Project Useful Life  Useful Life  Agency Name Project Title Pre‐Construction Construction Description Location Min Max Adelanto Pavement Repair and  Apply crack seal & type II slurry over 65,900  •Panther Ave. from Chamberlaine Wy end of pavement. 06/2019 07/2019 03 05 Rehabilitation Project,  square feet of existing asphalt pavement. Re‐ •Franklin Ct from Panther Ave. to cu‐de‐sac. Phase II install all pavement markings. •Colonial Ave. and Payne Ct. Adelanto Pavement Repair and  Apply crack seal & type II slurry over 85,000  •Verbena Rd. from Lawson Ave. to Bartlett Ave. 06/2019 07/2019 03 05 Rehabilitation Project,  square feet of existing asphalt pavement. Re‐ •Maya St. between Verbena St. and Hermosa Rd. Phase II install all pavement markings. •Aztec Ln. between Verbena Rd. and Hermosa Rd.  Adelanto Pavement Repair and  Apply crack seal & type II slurry over 817,900  •Bartlett Ave. between Racoon Ave. and Aster Rd. 06/2020 07/2020 03 05 Rehabilitation Project,  square feet of existing asphalt pavement. Re‐ •Aster Ave. between Bartlett Ave. and Air Expressway Phase III install all pavement markings. •Air Expressway between Aster Rd. and Racoon Ave. •Raccoon Ave. between Air Expressway and Bartlett Ave. •All streets bound by the above described limits. This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 3 Project Project Useful Life  Useful Life  Agency Name Project Title Pre‐Construction Construction Description Location Min Max Adelanto Adelanto Rd. Widening  Construct 1.5 miles of street to ultimate width  Adelanto Rd. between Yucca Rd. and Highway 395. 03/2019 06/2019 10 20 Project (80 feet curb to curb) including curb, sidewalks,  grind and overlay all existing asphalt pavement,  construct new ADA ramps, adjust utilities as  necessary, install pavement parkings and  signage to implement traffic calming and  pedestrian safety. This portion of Adelanto Rd.  is a transit route and the pavement section and  traffic control devices will be implemented  acordingly.        Adelanto Rancho Rd. Widening  Construct 3 miles of street to ultimate width  Rancho Rd. between Adelanto Rd. and Koala Rd. 03/2019 06/2019 10 20 Project. (80 feet curb to curb) including curb and  sidewalks, grind and overlay all existing asphalt  pavement, construct new ADA ramps, adjust  utilities as necessary, install pavement parkings  and signage to implement traffic calming and  pedestrian safety. Portions of Rancho Road are  transit routes. Therefore pavement sections  and traffic control devices will be implemented  accordingly. Adelanto Bellflower St. widening at  Construct approximately 480 feet of new curb  Bellflower Rd. from Palmdale Rd. to end of existing curb on west side of  11/2017 12/2017 10 20 Palmdale Rd. and gutter to widen Bellflower Road. Existing  Bellflower. pavement will be ground and overlaid with new  asphalt. The widened portion of Bellfower Rd.  will extend new asphalt to new gutter. New  pavement markings on the widened street will  safety channel traffic to Palmdale Rd. (Hwy 18)  and a new development at the corner of  Palmdale Rd. and Bellflower Rd.  Agoura Hills Fiscal Year 2017‐18 Street Resurfacing twelve road segments with  Various locations within the City of Agoura Hills 10/2017 11/2017 10 25 Resurfacing Project rubberized asphalt concrete, as well as,  upgrading nine ADA ramps. This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 4 Project Project Useful Life  Useful Life  Agency Name Project Title Pre‐Construction Construction Description Location Min Max Alameda Sidewalks Street tree root pruning and sidewalk repair to  Throughout the City of Alameda ‐ the backlog of repairs includes about 5,500  07/2017 06/2018 10 70 maintain pedestrian circulation and safety, and  locations, of which, several clusters will be chosen that address the oldest  minimize future damage to the street and  requests, and maximize economy by aggregating sites in close location to each  sidewalk.  other. Alameda Pavement Management Resurfacing and repair of street pavement, and  The Pavement Management program that is funded in FY 17‐18 is spread  05/2018 11/2018 30 40 restoration of flowlines of associated curb and  throughout the City of Alameda. The particular street identified for SB1 funds  gutter, in order to extend the life of the street  is Broadway, from Shoreline Drive to Otis Drive.  and improve its ridability for cyclists and  motorists.  Albany Evelyn Street Pavement  This project consists of the asphalt concrete  Evelyn Street from Garfield Avenue to Portland Avenue, in the City of Albany 03/2018 06/2018 20 30 Rehabilitation overlay of Evelyn Street from Garfield Avenue  to Portland Avenue, for a distance of  approximately 600 feet.   It will also include  base repair, traffic striping and upgrade of  existing curb ramps at street intersections to  meet ADA requirements. Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Pine Street, West City Limit to Atlantic Blvd. 06/2018 12/2018 15 20 Rehabilitation Project Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Olive Avenue, Alhambra Road to Pine Street 06/2018 12/2018 15 20 Rehabilitation Project Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Curtis Avenue, Alhambra Road to Pine Street  06/2018 12/2018 15 20 Rehabilitation Project Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Dos Robles, Alhambra Road to Pine Street 06/2018 12/2018 15 20 Rehabilitation Project Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Electric Avenue, Alhambra Road to North City Limit 06/2018 12/2018 15 20 Rehabilitation Project Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Marguerita Avenue, Alhambra Road to Pine Street 06/2018 12/2018 15 20 Rehabilitation Project Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Spruce Street, Curtis Avenue to Atlantic Blvd 06/2018 12/2018 15 20 Rehabilitation Project Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Almansor Street, Main Street to Huntington Drive 06/2018 12/2018 15 20 Rehabilitation Project This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 5 Project Project Useful Life  Useful Life  Agency Name Project Title Pre‐Construction Construction Description Location Min Max Alhambra FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Marengo Avenue, Main Street to Valley Blvd 06/2018 12/2018 15 20 Rehabilitation Project Aliso Viejo Glenwood Terrace  Local street rehabilitation (patching and  Glenwood Terrace HOA Public Streets 06/2018 09/2018 10 20 Rehabilitation overlay). FY 17‐18 funds to be banked for  construction in FY 18‐19 Amador City Road maintenance Repainting crosswalks and curbs. Within city limits. 09/2017 12/2017 10 20 American  2018 Annual Pavement  Grind and AC Overlay  Arden Court, Ascot Court, Bedford Way, Brookshire Way, Chaucer Court, Kent  05/2018 06/2018 10 20 Canyon Management Project Way, Kingsly Lane, Knightsbridge Court, Park Lane and Patricia Drive Anaheim Billie Jo Circle  The work consists of removing and  Billie Jo Circle Neighborhood ‐ bordered by Underhill Avenue to the north,  10/2017 11/2017 15 20 Neighborhood  reconstructing the pavement in the roadway,  Shakespeare Street to the East, Elsiena Way to the south, and Sunkist Street to  Rehabilitation applying slurry seal, replacing damaged areas of the west concrete (sidewalk, curb and gutter, and access  ramps), replacing pavement striping and  pavement markings. Anaheim Larkspur Neighborhood  The work consists of removing and  Larkspur Neighborhood ‐ bordered by Hightree Circle to the north, Oakwood  11/2017 05/2018 15 20 Rehabilitation reconstructing the pavement in the roadway,  Avenue to the east, Orangethorpe Avenue to the south, and Bubach Street to  applying slurry seal, replacing damaged areas of the west concrete (sidewalk, curb and gutter, and access  ramps), replacing pavement striping and  pavement markings. This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 6 Project Project Useful Life  Useful Life  Agency Name Project Title Pre‐Construction Construction Description Location Min Max Anaheim Cinda Burntwood  The work consists of removing and  Cinda Burntwood Neighborhood ‐ bordered by South Street to the north,  11/2017 05/2018 15 20 Neighborhood  reconstructing the pavement in the roadway,  Anaheim Coves trail to the east, Burntwood Avenue to the south, and Rio Vista  Rehabilitation applying slurry seal, replacing damaged areas of Street to the west concrete (sidewalk, curb and gutter, and access  ramps), replacing pavement striping and  pavement markings.  Anaheim Stone Creek Lane  The work consists of removing and  Stone Creek Lane Neighborhood ‐ comprised of eight (8) areas located in east  11/2017 05/2018 15 20 Neighborhood  reconstructing the pavement in the roadway,  Anaheim. These areas are located in close proximity to Santa Ana Canyon Road  Rehabilitation applying slurry seal, replacing damaged areas of and Canyon Rim Road between Weir Canyon Road and Anaheim Hills Road   concrete (sidewalk, curb and gutter, and access  ramps), replacing pavement striping and  pavement markings. Anaheim Sabina Neighborhood   The project will address poor drainage areas  Sabina Neighborhood ‐ bordered by La Palma Avenue to the north, Anaheim  11/2017 05/2018 15 20 Rehabilitation (Project ‐ A)throughout the community by constructing new Boulevard to the east, Sycamore Street to the south, and Harbor Boulevard to  concrete curb and gutter. The project  the west improvements will also include cold planing and  resurfacing the road with an asphalt concrete  overlay, the replcement and construction of  new ADA access ramps, and the replacement of  uneven and broken sidewalks. Anaheim Acacia Neighborhood  The work consists of removing and  Acacia Neighborhood ‐ bordered by Via Burton Street to the north, State  05/2018 11/2018 15 20 Rehabilitation reconstructing the pavement in the roadway,  College Boulevard to the east, Lincoln Avenue to the south, and East Street to  applying slurry seal, replacing damaged areas of the west concrete (sidewalk, curb and gutter, and access  ramps), replacing pavement striping and  pavement markings. Anaheim Miraloma Avenue & Miller Project Partnering with APU‐Electrical to cost  Miraloma Avenue from Blue gum Street to Miller Street 08/2015 11/2017 10 15 Street Rehabilitation share on the road rehabilitation of the  Miller Street from La Palma Avenue to Miraloma Avenue [APUE UD #62] impacted road segments due to the APU‐ Electrical underground conversion project  currently in construction.  The road  rehabilitation work consists of  cold planing,  resurfacing the road with an asphalt concrete  overlay, and the replacement of traffic striping,  traffic signal loops, and pavement markings. Anaheim Lincoln Avenue & Rio Vista Project Partnering with APU‐Electrical to cost  Lincoln Avenue from Sunkist Street to Rio Vista Street and  08/2016 08/2018 10 15 Street Rehabilitation share on the road rehabilitation of the  Rio Vista Street from Lincoln Avenue  to La Palma Avenue [APUE UD #63] impacted road segments due to the APU‐ Electrical underground conversion project  currently in construction.  The road  rehabilitation work consists of  cold planing,  resurfacing the road with an asphalt concrete  overlay, and the replacement of traffic striping,  traffic signal loops, and pavement markings. This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 7 Project Project Useful Life  Useful Life  Agency Name Project Title Pre‐Construction Construction Description Location Min Max Anaheim Cerritos Avenue  Project partnering with PW‐Sewer Section to  Cerritos Avenue from 9th Street to Euclid Street 08/2017 11/2017 10 15 Rehabilitation cost share on the road rehabilitation of the  [PW Sewer] impacted road segments due to the PW‐Sewer  improvement project currently in construction.  The road rehabilitation work consists of  cold  planing, resurfacing the road with an asphalt  concrete overlay, and the replacement of traffic  striping, traffic signal loops, and pavement  markings. Anaheim Orangewood Avenue  Project Partnering with APU‐Electrical to cost  Orangewood Avenue from Harbor Boulevard to Lewis Street 08/2017 11/2018 10 15 Rehabilitation from  share on the road rehabilitation of the  Harbor Boulevard to Lewis impacted road segments due to the APU‐ Street Electrical underground conversion project  [APUE UD #64] currently in construction.  The road  rehabilitation work consists of  cold planing,  resurfacing the road with an asphalt concrete  overlay, and the replacement of traffic striping,  traffic signal loops, and pavement markings. Anaheim Orangethorpe Avenue &  Project partnering with the City of Placentia  Orangethorpe Avenue from the Kraemer Boulevard Intersection easterly on  11/2017 02/2017 10 15 Kraemer Boulevard  and OCTA to cost share on the road  Orangethorpe Avenue to the end of the Orangethorpe Grade Separation  Rehabilitation rehabilitation of the impacted road segments  project limit and southerly on Kraemer Boulevard to East La Jolla Street [OCTA Bridges] due to the Kraemer Grade Separation Project  and Orangethorpe Grade Separation Project  constructed by OCTA. The road rehabilitation  work consists of cold planing, resurfacing the  road with an asphalt concrete overlay, slurry  seal, the replacement of traffic striping, traffic  signal loops, pavement markings, curb and  gutter, sidewalk, and an ADA access ramp.   Anaheim Blue Gum Street &  The road rehabilitation work consists of cold  Blue Gum Street from La Palma Avenue to the North City Limits 11/2017 05/2018 20 25 Miraloma Avenue  planing and resurfacing the road with an  Miraloma Avenue from the SR‐57 Freeway bridge to Blue Gum Street, and a Rehabilitation asphalt concrete overlay and by constructing  527 foot segment of La Cresta Avenue starting at 264 feet east of Blue Gum  Jointed Plain Concrete Pavement (JPCP) at the  Street going easterly intersection approaches on Miraloma Avenue  and Blue Gum Street. The work also includes  the removal and reconstruction of ADA access  ramps, cross gutters, and the installation of  new curb, gutter, sidewalk, and the  replacement of traffic striping, traffic signal  loops, and pavement markings. Anaheim Orange Avenue  The road rehabilitation work consists of cold  Orange Avenue from Western Avenue to Dale Avenue 11/2017 05/2018 10 15 Rehabilitation from  planing and resurfacing the road with an  Western Avenue to Dale  asphalt concrete overlay, the removal and  Avenue reconstruction of ADA access ramps, curb and  gutter, concrete sidewalk, and replacement of  traffic striping, traffic signal loops, and  pavement markings. This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 8 Project Project Useful Life  Useful Life  Agency Name Project Title Pre‐Construction Construction Description Location Min Max Anaheim La Palma Avenue  Project partnering with PW‐Sewer Section to  La Palma Avenue from East Street to N. Acacia Street 12/2017 11/2018 10 15 Rehabilitation from East  cost share on the road rehabilitation of the  Street to N. Acacia Street impacted road segments due to the PW‐Sewer  [PW Sewer] improvement project currently in construction.  The road rehabilitation work consists of  cold  planing, resurfacing the road with an asphalt  concrete overlay, and the replacement of traffic  striping, traffic signal loops, and pavement  markings. Anaheim  Arterial Slurry Seal Group The road rehabilitation work consists of   Ball Road from Beach Boulevard to Dale Avenue 03/2018 05/2018 05 07 2 – Various Locations applying a crack sealant and slurry seal coat to   La Palma Avenue from Chrisden Street to Potomac Circle  Ball Road from Beach  the existing pavement.  Some minor cold   Santa Ana Canyon Road from Fairmont Boulevard to Mohler Drive Boulevard to Dale Avenue planing, resurfacing the road with an asphalt   La Palma Avenue from  concrete overlay, and the replacement of traffic  Chrisden Street to  striping, traffic signal loops, and pavement  Potomac Circle markings.  Santa Ana Canyon Road  from Fairmont Boulevard  to Mohler Drive Anaheim La Palma Avenue &  The road rehabilitation work consists of cold  La Palma Avenue from the West City Limit to Mayflower Street & 05/2018 08/2018 10 15 Magnolia Avenue  planing and resurfacing the road with an  Magnolia Avenue from the I‐5 Freeway to La Palma Avenue Rehabilitation asphalt concrete overlay, the removal and  reconstruction of ADA access ramps, curb and  gutter, concrete sidewalk, and replacement of  traffic striping, traffic signal loops, and  pavement markings. Anaheim Lincoln Avenue  The road rehabilitation work consists of cold  Lincoln Avenue from State College Boulevard to Sunkist Street 05/2018 08/2018 10 15 Rehabilitation from State  planing and resurfacing the road with an  College Boulevard to  asphalt concrete overlay, the removal and  Sunkist Street reconstruction of ADA access ramps, curb and  gutter, concrete sidewalk, and replacement of  traffic striping, traffic signal loops, and  pavement markings. Anaheim  Kings Court  The work consists of removing and  Kings Court Neighborhood ‐ bordered by Ball Road to the north, Euclid Street  03/2018 11/2018 15 20 Neighborhood  reconstructing the pavement in the roadway,  to the east, Katella Avenue to the south, and Brookhurst Street to the west Rehabilitation applying slurry seal, replacing damaged areas of  concrete (sidewalk, curb and gutter, and access  ramps), replacing pavement striping and  pavement markings. Anderson City Wide Grinder Dig‐out  Conduct grinder dig‐outs on sections of failing  May include North Street, South Street, Riverside Avenue, Bruce Street, Stingy  04/2018 07/2018 15 20 Project pavement on City of Anderson streets.  Dig‐outs Lane, Balls Ferry Road, Silver Street, Diamond Street, Briggs Street, First Street,  will vary between 4' wide and 12' wide  Marmac Road, Bay Street, McMurray Drive, East Street, and Oak Street.  depmending on width of pavement failure for  length of failure.  Depth will vary between 3"  and 6" depending on roadway Traffic Index  number. This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 9 Project Project Useful Life  Useful Life  Agency Name Project Title Pre‐Construction Construction Description Location Min Max Anderson North Street Cape Seal  Cape seal North Street which is an arterial  North Street from SR 2736 to the North Street Bridge 04/2018 07/2018 08 10 Project roadway.  Widths vary between 56' and 64'.  Length of roadway segment is 8,000 lf. Anderson Anderson Heights Cape  Cape Seal existing residential streets.  Street  Pinion, Larch, Lodgepole, Aspen, Spruce, Hemlock and Jefferies Streets and  04/2018 07/2018 08 10 Seal Project widths vary between 28' and 36' wide.  Length  Avenues of roadway segments equals 13,000 lf. Angels Camp 2018 Road Improvement  Repave or Reconstruct Acorn Drive Acorn Drive 07/2018 08/2018 30 40 Project Antioch 2017‐18 roadway  rubberized cape seal roadway Golden Bear Drive 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway El Rey Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Dolores Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Capistrano Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Bautista Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway San Joaquin Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Faria Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway D Street ‐ W Tregallas to Putnam 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Elizabeth Lane 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Robert Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Plumleigh Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Elizabeth Court 02/2018 08/2018 10 15 maintenance project This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected] City ‐ Proposed Local Streets and Roads Projects FY 2017‐18 as of 11‐17‐17 10 Project Project Useful Life  Useful Life  Agency Name Project Title Pre‐Construction Construction Description Location Min Max Antioch 2017‐18 roadway  rubberized cape seal roadway Putnam Street ‐ Lone Tree to G Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Minta Lane 02/2018 08/2018 10 15 maintenance project Antioch 2019 roadway  rubberized cape seal roadway Hillcrest Ave ‐ E 18th to E 13th  02/2019 08/2019 10 15 maintenance project Antioch 2019 roadway  rubberized cape seal roadway E 13th Street ‐ Hillcrest to Minaker 02/2019 08/2019 10 15 maintenance project Antioch 2019 roadway  rubberized cape seal roadway Minaker Drive 02/2019 08/2019 10 15 maintenance project Antioch 2019 roadway  rubberized cape seal roadway W 11th Street ‐ L St to G St 02/2019 08/2019 10 15 maintenance project Antioch 2019 roadway  rubberized cape seal roadway 14th Street ‐ L St to G St 02/2019 08/2019 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway William Reed Drive 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Cataline Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Brisdale Place 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Stillwell Circle 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Madill Circle 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway W. Madill Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Hawthorne Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Campbell Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Creed Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Newbury Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway John Gildi Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Russell Drive 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Lawrence Avenue 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Lawton Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Texas Street 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Gem Lane 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway F Street ‐ Texas to Drake 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway D Street ‐ SPRR to Drake 02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Lindburg Street  02/2018 08/2018 10 15 maintenance project Antioch 2017‐18 roadway  rubberized cape seal roadway Rossi Avenue 02/2018 08/2018 10 15 maintenance project This information is provided solely for informational purposes and pursuant to SHC Section 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916) 654‐4245 or [email protected]

Description:
rubberized cape seal roadway. Gem Lane. 02/2018. 08/2018. 10. 15. Antioch. 2017-18 roadway maintenance project rubberized cape seal roadway. F Street - Texas to Drake storage system; installation of catch basins to Eastmoor Ave., Edgemont Dr., El Dorado Dr., Escuela Dr., Glenbrook Ave.,.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.