U.S. Department of Transportation Federal Aviation Administration A ERONAUTICAL I NFORMATION M ANUAL Change 1 July 24, 2014 DO NOT DESTROY BASIC DATED APRIL 3, 2014 7/24/14 AIM Aeronautical Information Manual Explanation of Changes Effective: July 24, 2014 a. 1−1−3. VHF Omni−Directional Range f. 4−1−22. Airport Reservation Operations (VOR) and Special Traffic Management Programs This change updates the contact information for the This change reflects the fact that some VOR receivers Airport Reservation Office since the Command are capable of identifying the VOR. Center’s relocation to Vint Hill, VA. b. 1−1−9. Instrument Landing System (ILS) g. 4−3−3. Traffic Patterns For those facilities that have had the middle marker This change adds a graphic that depicts headwind, decommissioned, this change identifies a distance crosswind, and tailwind calculation charts. (1/2 mile) from the approach end of the runway for h. 4−6−9. Contingency Actions: Weather En- protection of the Localizer Critical Area. This change counters and Aircraft System Failures also removes MLS from the required phraseology to This change is made to clarify to operators that they advise pilots that the ILS Critical Area is not may request deviations per Title 14, of the Code of protected. Federal Regulations (14 CFR), Part 91.180 (d) after c. 1−1−11. Microwave Landing System (MLS) entry into Reduced Vertical Separation Minimum (RVSM) airspace and not before. This change removes the reference to the ILS service i. 5−1−1. Preflight Preparation protection date of 2010. This change reflects the cancellation of FAA Orders d. 1−1−14. User Reports Requested on 7230.16C, Pilot Education Program−Operation Rain NAVAID or Global Navigation Satellite System Check, and 7230.17, Pilot Education Program− (GNSS) Performance or Interference Operation Takeoff. 4−5−6. Traffic Information Service (TIS) j. 5−3−3. Additional Reports 4−5−7. Automatic Dependent Surveillance − Broadcast (ADS−B) Services This change harmonizes the AIM/Aeronautical 4−5−8. Traffic Information Service (TIS) − Information Publication guidance with the most Broadcast (TIS−B) recent update to International Civil Aviation 7−1−11. Flight Information Services (FIS) Organization (ICAO) Annex 2, Rules of the Air, Paragraph 3.6.2.2. FAA Form 8740−5, Safety Improvement Report, is k. 5−4−3. Approach Control no longer used to report malfunctions. Therefore, 5−4−26. Landing Priority references to this form have been deleted. This change removes references to MLS and adds e. 1−1−21. Precision Approach Systems other references to include RNAV and GBAS Landing than ILS, GLS, and MLS System (GLS) approaches. 2−1−5. In−runway Lighting l. 5−4−5. Instrument Approach Procedure 2−3−4. Taxiway Markings Charts 2−3−5. Holding Position Markings 5−4−12. Radar Monitoring of Instrument This change clarifies the pilot’s responsibility while Approaches descending on the glidepath in dependent and independent approaches. The content and graphics This change removes Microwave Landing System within the Terminal Arrival Area section is also (MLS) as an approach type. updated to bring it in line with new procedures and Explanation of Changes E of Chg−1 AIM 7/24/14 terminology. In addition, this change provides an tion about the unique Flight Management System explanation (both visually and verbally) as to why coding issues for SOIA. circling minima may be lower than the LNAV/VNAV p. 5−4−17. Simultaneous Converging Instru- minima on the same approach plate. ment Approaches m. 5−4−13. ILS/MLS Approaches to Parallel This change broadens the requirements for conduct- Runways ing converging approaches to include approaches 5−4−14. Parallel ILS/MLS Approaches (De- other than ILS. pendent) q. 5−6−1. National Security This change removes references to MLS and adds This change now contains complete instructions references to include RNAV and GLS approaches. It regarding Defense Visual Flight Rule position clarifies the runway spacing requirements for the use reporting prior to Air Defense Identification Zone of final monitor controller and PRM radar. It also penetration per 14 CFR 99.15. includes a discussion of pilot procedures when conducting simultaneous (parallel) dependent opera- r. 7−5−15. Avoid Flight in the Vicinity of tions. Thermal Plumes (Smoke Stacks and Cooling Towers) n. 5−4−15. Simultaneous Parallel ILS/RNAV/ GLS Approaches (Independent) This change updates the terminology and provides more detail regarding the associated hazards of This change clarifies the runway spacing requirement exhaust plumes. when No Transgression Zone (NTZ) monitoring is required. It also clarifies monitor controller proced- s. 7−6−4. Unidentified Flying Object (UFO) ures during NTZ monitoring of simultaneous Reports (parallel) independent approaches. This change removes outdated contact information regarding the collection and/or reporting of UFO o. 5−4−16. Simultaneous Close Parallel ILS/ phenomena. RNAV/GLS PRM Approaches (Independent) and Simultaneous Offset Instrument Approaches t. Entire publication. (SOIA) Editorial/format changes were made where neces- This change adds RNAV PRM and GLS PRM sary. Revision bars were not used when changes are approach discussions. It includes specific informa- insignificant in nature. E of Chg−2 Explanation of Changes 7/24/14 AIM AIM Change 1 Page Control Chart July 24, 2014 REMOVE PAGES DATED INSERT PAGES DATED Checklist of Pages CK−1 through CK−6 .... 4/3/14 Checklist of Pages CK−1 through CK−6 .... 7/24/14 Subscription Information ................ 4/3/14 Subscription Information ................ 7/24/14 FAA/AIM Basic Flight Info & Procedures .. 4/3/14 FAA/AIM Basic Flight Info & Procedures .. 7/24/14 Table of Contents i through xi ............ 4/3/14 Table of Contents i through xi ............ 7/24/14 1−1−1 ............................... 4/3/14 1−1−1 ............................... 4/3/14 1−1−2 through 1−1−4 ................... 4/3/14 1−1−2 through 1−1−4 ................... 7/24/14 1−1−11 and 1−1−12 .................... 4/3/14 1−1−11 and 1−1−12 .................... 7/24/14 1−1−13 .............................. 4/3/14 1−1−13 .............................. 4/3/14 1−1−14 .............................. 4/3/14 1−1−14 .............................. 7/24/14 1−1−17 .............................. 4/3/14 1−1−17 .............................. 7/24/14 1−1−18 .............................. 4/3/14 1−1−18 .............................. 4/3/14 1−1−35 .............................. 4/3/14 1−1−35 .............................. 4/3/14 1−1−36 .............................. 4/3/14 1−1−36 .............................. 7/24/14 2−1−5 ............................... 4/3/14 2−1−5 ............................... 4/3/14 2−1−6 through 2−1−10 .................. 4/3/14 2−1−6 through 2−1−10 .................. 7/24/14 2−3−7 ............................... 4/3/14 2−3−7 ............................... 7/24/14 2−3−8 ............................... 4/3/14 2−3−8 ............................... 4/3/14 2−3−11 .............................. 4/3/14 2−3−11 .............................. 4/3/14 2−3−12 .............................. 4/3/14 2−3−12 .............................. 7/24/14 4−1−21 .............................. 4/3/14 4−1−21 .............................. 7/24/14 4−1−22 .............................. 4/3/14 4−1−22 .............................. 4/3/14 4−3−1 ............................... 4/3/14 4−3−1 ............................... 4/3/14 4−3−2 through 4−3−28 .................. 4/3/14 4−3−2 through 4−3−29 .................. 7/24/14 4−5−13 .............................. 4/3/14 4−5−13 .............................. 4/3/14 4−5−14 .............................. 4/3/14 4−5−14 .............................. 7/24/14 4−5−17 and 4−5−18 .................... 4/3/14 4−5−17 and 4−5−18 .................... 7/24/14 4−6−7 ............................... 4/3/14 4−6−7 ............................... 4/3/14 4−6−8 ............................... 4/3/14 4−6−8 ............................... 7/24/14 5−1−1 ............................... 4/3/14 5−1−1 ............................... 7/24/14 5−1−2 ............................... 4/3/14 5−1−2 ............................... 4/3/14 5−3−3 ............................... 4/3/14 5−3−3 ............................... 4/3/14 5−3−4 ............................... 4/3/14 5−3−4 ............................... 7/24/14 5−4−3 and 5−4−4 ...................... 4/3/14 5−4−3 and 5−4−4 ...................... 7/24/14 5−4−7 through 5−4−62 .................. 4/3/14 5−4−7 through 5−4−63 .................. 7/24/14 5−6−1 through 5−6−3 ................... 4/3/14 5−6−1 through 5−6−3 ................... 7/24/14 5−6−4 ............................... 4/3/14 5−6−4 ............................... 4/3/14 7−1−3 ............................... 4/3/14 7−1−3 ............................... 4/3/14 7−1−4 and 7−1−5 ...................... 4/3/14 7−1−4 and 7−1−5 ...................... 7/24/14 7−1−6 ............................... 4/3/14 7−1−6 ............................... 4/3/14 Page Control Chart AIM 7/24/14 REMOVE PAGES DATED INSERT PAGES DATED 7−1−23 .............................. 4/3/14 7−1−23 .............................. 4/3/14 7−1−24 and 7−1−25 .................... 4/3/14 7−1−24 and 7−1−25 .................... 7/24/14 7−1−26 .............................. 4/3/14 7−1−26 .............................. 4/3/14 7−1−41 .............................. 4/3/14 7−1−41 .............................. 4/3/14 7−1−42 .............................. 4/3/14 7−1−42 .............................. 7/24/14 7−1−43 .............................. 4/3/14 7−1−43 .............................. 4/3/14 7−1−44 .............................. 4/3/14 7−1−44 .............................. 7/24/14 7−1−59 .............................. 4/3/14 7−1−59 .............................. 4/3/14 7−1−60 .............................. 4/3/14 7−1−60 .............................. 7/24/14 7−5−13 and 7−5−14 .................... 4/3/14 7−5−13 and 7−5−14 .................... 7/24/14 7−6−3 ............................... 7/24/14 7−6−3 ............................... 7/24/14 PCG−1 .............................. 4/3/14 PCG−1 and PCG−2 .................... 7/24/14 PCG A−1 through PCG W−2 ............. 4/3/14 PCG A−1 through PCG W−2 ............. 7/24/14 Index I−1 through I−13 ................. 4/3/14 Index I−1 through I−13 ................. 7/24/14 2 Page Control Chart 7/24/14 AIM Checklist of Pages PAGE DATE PAGE DATE PAGE DATE Cover 7/24/14 1−1−12 7/24/14 Chapter 2. Aeronautical Record of Changes N/A 1−1−13 4/3/14 Lighting and Other Airport Exp of Chg−1 7/24/14 1−1−14 7/24/14 Visual Aids Exp of Chg−2 7/24/14 1−1−15 4/3/14 Section 1. Airport Lighting 1−1−16 4/3/14 Aids 1−1−17 7/24/14 2−1−1 4/3/14 1−1−18 4/3/14 2−1−2 4/3/14 Checklist of Pages 1−1−19 4/3/14 2−1−3 4/3/14 CK−1 7/24/14 1−1−20 4/3/14 2−1−4 4/3/14 CK−2 7/24/14 1−1−21 4/3/14 2−1−5 4/3/14 CK−3 7/24/14 1−1−22 4/3/14 2−1−6 4/3/14 CK−4 7/24/14 1−1−23 4/3/14 2−1−7 4/3/14 CK−5 7/24/14 1−1−24 4/3/14 2−1−8 4/3/14 CK−6 7/24/14 1−1−25 4/3/14 2−1−9 4/3/14 1−1−26 4/3/14 2−1−10 4/3/14 Subscription Info 7/24/14 1−1−27 4/3/14 2−1−11 4/3/14 Comments/Corr 4/3/14 1−1−28 4/3/14 2−1−12 4/3/14 Comments/Corr 4/3/14 1−1−29 4/3/14 2−1−13 4/3/14 Basic Flight Info 7/24/14 1−1−30 4/3/14 2−1−14 4/3/14 Publication Policy 4/3/14 1−1−31 4/3/14 2−1−15 4/3/14 Reg & Advis Cir 4/3/14 1−1−32 4/3/14 1−1−33 4/3/14 Section 2. Air Navigation and Table of Contents 1−1−34 4/3/14 Obstruction Lighting 1−1−35 4/3/14 2−2−1 4/3/14 i 7/24/14 1−1−36 7/24/14 2−2−2 4/3/14 ii 7/24/14 1−1−37 4/3/14 iii 7/24/14 Section 3. Airport Marking iv 7/24/14 Aids and Signs v 7/24/14 vi 7/24/14 2−3−1 4/3/14 vii 7/24/14 2−3−2 4/3/14 viii 7/24/14 2−3−3 4/3/14 ix 7/24/14 2−3−4 4/3/14 x 7/24/14 2−3−5 4/3/14 xi 7/24/14 2−3−6 4/3/14 2−3−7 7/24/14 Section 2. Area Navigation 2−3−8 4/3/14 (RNAV) and Required Chapter 1. Air Navigation 2−3−9 4/3/14 Navigation Performance 2−3−10 4/3/14 Section 1. Navigation Aids (RNP) 2−3−11 4/3/14 1−1−1 4/3/14 1−2−1 4/3/14 2−3−12 7/24/14 1−1−2 7/24/14 1−2−2 4/3/14 2−3−13 4/3/14 1−1−3 7/24/14 1−2−3 4/3/14 2−3−14 4/3/14 1−1−4 7/24/14 1−2−4 4/3/14 2−3−15 4/3/14 1−1−5 4/3/14 1−2−5 4/3/14 2−3−16 4/3/14 1−1−6 4/3/14 1−2−6 4/3/14 2−3−17 4/3/14 1−1−7 4/3/14 1−2−7 4/3/14 2−3−18 4/3/14 1−1−8 4/3/14 2−3−19 4/3/14 1−1−9 4/3/14 2−3−20 4/3/14 1−1−10 4/3/14 2−3−21 4/3/14 1−1−11 7/24/14 Checklist of Pages CK−1 AIM 7/24/14 Checklist of Pages PAGE DATE PAGE DATE PAGE DATE 2−3−22 4/3/14 Chapter 4. Air Traffic Control 4−3−9 7/24/14 2−3−23 4/3/14 Section 1. Services Available 4−3−10 7/24/14 2−3−24 4/3/14 to Pilots 4−3−11 7/24/14 2−3−25 4/3/14 4−3−13 7/24/14 2−3−26 4/3/14 4−1−1 4/3/14 4−3−14 7/24/14 2−3−27 4/3/14 4−1−2 4/3/14 4−3−15 7/24/14 2−3−28 4/3/14 4−1−3 4/3/14 4−3−16 7/24/14 2−3−29 4/3/14 4−1−4 4/3/14 4−3−17 7/24/14 2−3−30 4/3/14 4−1−5 4/3/14 4−3−18 7/24/14 2−3−31 4/3/14 4−1−6 4/3/14 4−3−19 7/24/14 4−1−7 4/3/14 4−3−20 7/24/14 4−1−8 4/3/14 4−3−21 7/24/14 Chapter 3. Airspace 4−1−9 4/3/14 4−3−22 7/24/14 Section 1. General 4−1−10 4/3/14 4−3−23 7/24/14 3−1−1 4/3/14 4−1−11 4/3/14 4−3−24 7/24/14 3−1−2 4/3/14 4−1−12 4/3/14 4−3−25 7/24/14 4−1−13 4/3/14 4−3−26 7/24/14 Section 2. Controlled Airspace 4−1−14 4/3/14 4−3−27 7/24/14 3−2−1 4/3/14 4−1−15 4/3/14 4−3−28 7/24/14 3−2−2 4/3/14 4−1−16 4/3/14 4−3−29 7/24/14 3−2−3 4/3/14 4−1−17 4/3/14 3−2−4 4/3/14 4−1−18 4/3/14 Section 4. ATC Clearances and Aircraft Separation 3−2−5 4/3/14 4−1−19 4/3/14 3−2−6 4/3/14 4−1−20 4/3/14 4−4−1 4/3/14 3−2−7 4/3/14 4−1−21 7/24/14 4−4−2 4/3/14 3−2−8 4/3/14 4−1−22 4/3/14 4−4−3 4/3/14 3−2−9 4/3/14 4−1−23 4/3/14 4−4−4 4/3/14 4−4−5 4/3/14 Section 3. Class G Airspace Section 2. Radio 4−4−6 4/3/14 Communications Phraseology 4−4−7 4/3/14 3−3−1 4/3/14 and Techniques 4−4−8 4/3/14 4−2−1 4/3/14 4−4−9 4/3/14 Section 4. Special Use 4−2−2 4/3/14 4−4−10 4/3/14 Airspace 4−2−3 4/3/14 4−4−11 4/3/14 3−4−1 4/3/14 4−2−4 4/3/14 3−4−2 4/3/14 4−2−5 4/3/14 Section 5. Surveillance 4−2−6 4/3/14 Systems Section 5. Other Airspace 4−2−7 4/3/14 4−5−1 4/3/14 Areas 4−2−8 4/3/14 4−5−2 4/3/14 3−5−1 4/3/14 4−5−3 4/3/14 3−5−2 4/3/14 Section 3. Airport Operations 4−5−4 4/3/14 3−5−3 4/3/14 4−3−1 4/3/14 4−5−5 4/3/14 3−5−4 4/3/14 4−3−2 7/24/14 4−5−6 4/3/14 3−5−5 4/3/14 4−3−3 7/24/14 4−5−7 4/3/14 3−5−6 4/3/14 4−3−4 7/24/14 4−5−8 4/3/14 3−5−7 4/3/14 4−3−5 7/24/14 4−5−9 4/3/14 3−5−8 4/3/14 4−3−6 7/24/14 4−5−10 4/3/14 3−5−9 4/3/14 4−3−7 7/24/14 4−5−11 4/3/14 4−3−8 7/24/14 4−5−12 4/3/14 CK−2 Checklist of Pages 7/24/14 AIM Checklist of Pages PAGE DATE PAGE DATE PAGE DATE 4−5−13 4/3/14 5−1−12 4/3/14 5−3−13 4/3/14 4−5−14 7/24/14 5−1−13 4/3/14 5−3−14 4/3/14 4−5−15 4/3/14 5−1−14 4/3/14 4−5−16 4/3/14 5−1−15 4/3/14 Section 4. Arrival Procedures 4−5−17 7/24/14 5−1−16 4/3/14 5−4−1 4/3/14 4−5−18 7/24/14 5−1−17 4/3/14 5−4−2 4/3/14 4−5−19 4/3/14 5−1−18 4/3/14 5−4−3 7/24/14 4−5−20 4/3/14 5−1−19 4/3/14 5−4−4 7/24/14 5−1−20 4/3/14 5−4−5 4/3/14 Section 6. Operational Policy/ 5−1−21 4/3/14 5−4−6 4/3/14 Procedures for Reduced Vertical 5−1−22 4/3/14 5−4−7 7/24/14 Separation Minimum (RVSM) in 5−1−23 4/3/14 5−4−8 7/24/14 the Domestic U.S., Alaska, Offshore Airspace and the 5−1−24 4/3/14 5−4−9 7/24/14 San Juan FIR 5−1−25 4/3/14 5−4−10 7/24/14 4−6−1 4/3/14 5−1−26 4/3/14 5−4−11 7/24/14 4−6−2 4/3/14 5−1−27 4/3/14 5−4−12 7/24/14 4−6−3 4/3/14 5−1−28 4/3/14 5−4−13 7/24/14 4−6−4 4/3/14 5−1−29 4/3/14 5−4−14 7/24/14 4−6−5 4/3/14 5−1−30 4/3/14 5−4−15 7/24/14 4−6−6 4/3/14 5−1−31 4/3/14 5−4−16 7/24/14 4−6−7 4/3/14 5−4−17 7/24/14 4−6−8 7/24/14 Section 2. Departure 5−4−18 7/24/14 4−6−9 4/3/14 Procedures 5−4−19 7/24/14 4−6−10 4/3/14 5−2−1 4/3/14 5−4−20 7/24/14 4−6−11 4/3/14 5−2−2 4/3/14 5−4−21 7/24/14 5−2−3 4/3/14 5−4−22 7/24/14 Section 7. Operational Policy/ 5−2−4 4/3/14 5−4−23 7/24/14 Procedures for the Gulf of Mexico 5−2−5 4/3/14 5−4−24 7/24/14 50 NM Lateral Separation 5−2−6 4/3/14 5−4−25 7/24/14 Initiative 5−2−7 4/3/14 5−4−26 7/24/14 4−7−1 4/3/14 5−2−8 4/3/14 5−4−27 7/24/14 4−7−2 4/3/14 5−2−9 4/3/14 5−4−28 7/24/14 4−7−3 4/3/14 5−2−10 4/3/14 5−4−29 7/24/14 4−7−4 4/3/14 5−2−11 4/3/14 5−4−30 7/24/14 4−7−5 4/3/14 5−4−31 7/24/14 Section 3. En Route 5−4−32 7/24/14 Chapter 5. Air Traffic Procedures 5−4−33 7/24/14 Procedures 5−3−1 4/3/14 5−4−34 7/24/14 Section 1. Preflight 5−3−2 4/3/14 5−4−35 7/24/14 5−1−1 7/24/14 5−3−3 4/3/14 5−4−36 7/24/14 5−1−2 4/3/14 5−3−4 7/24/14 5−4−37 7/24/14 5−1−3 4/3/14 5−3−5 4/3/14 5−4−38 7/24/14 5−1−4 4/3/14 5−3−6 4/3/14 5−4−39 7/24/14 5−1−5 4/3/14 5−3−7 4/3/14 5−4−40 7/24/14 5−1−6 4/3/14 5−3−8 4/3/14 5−4−41 7/24/14 5−1−7 4/3/14 5−3−9 4/3/14 5−4−42 7/24/14 5−1−8 4/3/14 5−3−10 4/3/14 5−4−43 7/24/14 5−1−9 4/3/14 5−3−11 4/3/14 5−4−44 7/24/14 5−1−10 4/3/14 5−3−12 4/3/14 5−4−45 7/24/14 5−1−11 4/3/14 Checklist of Pages CK−3 AIM 7/24/14 Checklist of Pages PAGE DATE PAGE DATE PAGE DATE 5−4−46 7/24/14 Section 2. Emergency Services 7−1−11 4/3/14 5−4−47 7/24/14 Available to Pilots 7−1−12 4/3/14 5−4−48 7/24/14 6−2−1 4/3/14 7−1−13 4/3/14 5−4−49 7/24/14 6−2−2 4/3/14 7−1−14 4/3/14 5−4−50 7/24/14 6−2−3 4/3/14 7−1−15 4/3/14 5−4−51 7/24/14 6−2−4 4/3/14 7−1−16 4/3/14 5−4−52 7/24/14 6−2−5 4/3/14 7−1−17 4/3/14 5−4−53 7/24/14 6−2−6 4/3/14 7−1−18 4/3/14 5−4−54 7/24/14 6−2−7 4/3/14 7−1−19 4/3/14 5−4−55 7/24/14 6−2−8 4/3/14 7−1−20 4/3/14 5−4−56 7/24/14 6−2−9 4/3/14 7−1−21 4/3/14 5−4−57 7/24/14 6−2−10 4/3/14 7−1−22 4/3/14 5−4−58 7/24/14 6−2−11 4/3/14 7−1−23 4/3/14 5−4−59 7/24/14 7−1−24 7/24/14 5−4−60 7/24/14 Section 3. Distress and 7−1−25 7/24/14 5−4−61 7/24/14 Urgency Procedures 7−1−26 4/3/14 5−4−62 7/24/14 6−3−1 4/3/14 7−1−27 4/3/14 5−4−63 7/24/14 6−3−2 4/3/14 7−1−28 4/3/14 6−3−3 4/3/14 7−1−29 4/3/14 Section 5. Pilot/Controller 6−3−4 4/3/14 7−1−30 4/3/14 Roles and Responsibilities 6−3−5 4/3/14 7−1−31 4/3/14 5−5−1 4/3/14 6−3−6 4/3/14 7−1−32 4/3/14 5−5−2 4/3/14 6−3−7 4/3/14 7−1−33 4/3/14 5−5−3 4/3/14 7−1−34 4/3/14 5−5−4 4/3/14 Section 4. Two−way Radio 7−1−35 4/3/14 5−5−5 4/3/14 Communications Failure 7−1−36 4/3/14 5−5−6 4/3/14 6−4−1 4/3/14 7−1−37 4/3/14 5−5−7 4/3/14 6−4−2 4/3/14 7−1−38 4/3/14 5−5−8 4/3/14 7−1−39 4/3/14 7−1−40 4/3/14 Section 6. National Security Section 5. Aircraft Rescue 7−1−41 4/3/14 and Interception Procedures and Fire Fighting 7−1−42 7/24/14 5−6−1 7/24/14 Communications 7−1−43 4/3/14 5−6−2 7/24/14 6−5−1 4/3/14 7−1−44 7/24/14 5−6−3 7/24/14 6−5−2 4/3/14 7−1−45 4/3/14 5−6−4 4/3/14 7−1−46 4/3/14 5−6−5 4/3/14 7−1−47 4/3/14 5−6−6 4/3/14 Chapter 7. Safety of Flight 7−1−48 4/3/14 5−6−7 4/3/14 Section 1. Meteorology 7−1−49 4/3/14 5−6−8 4/3/14 7−1−1 4/3/14 7−1−50 4/3/14 5−6−9 4/3/14 7−1−2 4/3/14 7−1−51 4/3/14 7−1−52 4/3/14 5−6−10 4/3/14 7−1−3 4/3/14 7−1−53 4/3/14 7−1−4 7/24/14 7−1−54 4/3/14 Chapter 6. Emergency 7−1−5 7/24/14 Procedures 7−1−55 4/3/14 7−1−6 4/3/14 7−1−56 4/3/14 Section 1. General 7−1−7 4/3/14 7−1−57 4/3/14 6−1−1 4/3/14 7−1−8 4/3/14 7−1−58 4/3/14 7−1−9 4/3/14 7−1−59 4/3/14 7−1−10 4/3/14 CK−4 Checklist of Pages
Description: